Search Documents

  • ISEE
    Updates in the Determination of Dynamic Pressure Tests

    By Alejandro Ferrada Vergara

    Most blasting techniques that are designed to improve fragmentation and subsequently improve ore work index to downstream comminution processes, apply powder or energy factor increases, either by stre

    Jan 1, 2016

  • CIM
    On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic Plant

    By Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon

    "In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on

    Jan 1, 2000

  • SME
    Effects of MERV 16 filters and routine work practices on enclosed cabs for reducing respirable dust and DPM exposures in an underground limestone mine

    By J. D. Noll

    An effective technique to minimize miners? respirable dust and diesel exposure on mobile mining equipment is to place mine operators in enclosed cabs with designed filtration and pressurization system

    Feb 1, 2014

  • SAIMM
    A Framework To Simplify The Management Of Throughput And Constraints

    By A. Cambitsis

    We show that the prioritization of business improvement and performance management decisions may be significantly improved by taking into account the systemic effects of changes made in a single proce

    Jan 1, 2012

  • NIOSH
    IC 8403 Supply And Demand For Energy In The United States By States And Regions, 1960 And 1965 (In Four Parts) 3. Dry Natural Gas

    By Lulie H. Crump

    U.S. supply and demand data for dry natural gas by source, form, and major consuming sectors--within and between States and defined regions--were tabulated for the years 1960 and 1965. State-by-State

    Jan 1, 1969

  • SME
    Does The Capital Budgeting Process Inhibit Corporate Competitiveness? (AIME PRIPRINT 98-64)

    By B. W. Cavender

    Capital investments are made for a variety of purposes, from providing incremental capacity at existing operations to developing and implementing new technologies intended to radically improve a compa

    Jan 1, 1998

  • CIM
    Aspects of Wear in Mill Circuit Pumps (26c5c6b3-69c9-4fe1-85a7-a5b64099587a)

    By C. I. Walker

    Field tests at a number of large mineral processing operations have been undertaken to better understand the wear life impact of different aspects of pump design, materials of construction and mainten

    Jan 1, 2012

  • CIM
    Aspects of Wear in Mill Circuit Pumps

    By C. I. Walker

    Field tests at a number of large mineral processing operations have been undertaken to better understand the wear life impact of different aspects of pump design, materials of construction and mainten

    Jan 1, 2012

  • CIM
    Mining Engineering Curricula

    M INE production requires the coordination of the talents of men and the use of equipment. Mine operators maintain a continual surveillance of equipment, looking for improvements and modifications tha

    Jan 1, 1963

  • AIME
    Progress of the Silver-Lead Metallurgy of the West, During 1874

    By A. Eiders

    THE year 1874 marks a decided advance in the metallurgy of the West, in two directions. On the one hand, the technical management has been very materially improved, and on the other, the production ha

    Jan 1, 1875

  • AIME
    NEW Haven Paper - Progress of the Silver-Lead Metallurgy of the West during 1874

    By A. Eilers

    The year 1874 marks a decided advance in the metallurgy of the West, in two directions. On the one hand, the technical management has been very materially improved, and on the other, the production ha

  • SME
    Does the capital budgeting process inhibit corporate competitiveness?

    By B. W. Cavender

    Capital investments are made for a variety of reasons, ranging from providing incremental capacity at existing operations to developing and implementing new technologies intended to radically improve

    Jan 1, 1999

  • ABM
    Modernization Of The Kroman Wire Rod Mill To Increase Productivity, Utilization And Product Quality

    By Bruce V. Kiefer

    A modernization project was undertaken by Kroman Celik Sanayii A.S. in order to improve their product quality, consistency and shape of the coil package, reduce maintenance and delays in rod mill, the

    Oct 30, 2017

  • SAIMM
    Evolution of the estimation of the metallurgical balance

    By A. V. Wilke

    The metallurgical balance is a tool usually applied in the mining industry. The final result is used for different objectives. All the existing software for the calculation of the metallurgical balanc

    Jan 1, 2009

  • NIOSH
    IC 9029 Continuous Radiation Working-Level Detectors

    By R. F. Droullard

    The Bureau of Mines has used gross alpha and gross beta detectors to continuously measure radiation working levels for a number of years. During this time, improvements have been made in the design an

    Jan 1, 1985

  • DFI
    The Galataport Project In Istanbul, Turkey. A Unique Case History In Geotechnical Engineering

    By Carlandrea Albonico, Salvatore Miranda

    After a brief introduction of the whole Project, the paper describes two special geotechnical engineering solutions provided within the scope of the Galataport Project, in Istanbul, Turkey. The first

    Nov 1, 2022

  • TMS
    Various Arsenic Treatments in Non-Ferrous Metallurgy and other Potential Applications

    By Shun Fujieda, Shigeru Suzuki, Kozo Shinoda, Tetsuo Fujita

    "Dowa Metals & Mining Co. Ltd. has developed and plant-practiced a unique scorodite synthesis technology (DMSP®) for arsenic immobilization by oxidizing Fe(ll) ions in the presence of As(V) ions. Dowa

    Jan 1, 2012

  • SME
    Railroad Crossing by Microtunneling: MTBM Successfully Mines Side-by-Side Twin Tunnels Six Feet Below Railroad - West Elizabeth Avenue Storm Drainage Project, Linden, New Jersey

    By Keith Schaeffer

    This paper presents a history of the planning, engineering and construction completed for the railroad tunnel crossing part of the West Elizabeth Avenue Storm Drainage Project, undertaken to relieve f

    Jan 1, 2008

  • NIOSH
    RI 4246 Laboratory Study of the Hot-Water Process for Separating Hydrocarbons from Surface Deposits of Bituminous Sandstones near Edna, Calif.

    By R. V. Higgins, G. B. Shea

    "FOREWORDIn the second year of World War II, the petroleum industry in California was taxed to near capacity to satisfy the expanded war demand for petroleum products, particularly fuel oil. With disc

    Oct 1, 1948

  • SME
    Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021

    By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi

    The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op

    Jun 13, 2021