Search Documents

  • CIM
    The Electrification Nos. 12 and 20 of Three Large Hoists at Collieries, Dominion Coal Company, Limited

    By J. A. Russell

    AS THE LOCAL electric generating plants increased in size and capacity and costs of producing electricity came down, it became apparent that it was no longer good economy to operate individual boiler

    Jan 1, 1958

  • CIM
    Fibrous Dust -Its Measurement and Control

    By Gyan S. Rajhans

    "The strategy of fibrous dust sampling is discussed, various sampiing methods are critically reviewed .and their application to coal dust is demonstrated. Fibre counting is described in detail. An att

    Jan 1, 1970

  • NIOSH
    IC 7688 Black Hills Mineral Atlas, South Dakota: Part 1 (In Two Parts) ? Introduction

    The Black Hills Mineral Atlas briefly summarizes all pertinent date available on the mines and mineral deposits in the Black Hills that have been explored, developed, mined, or located. The purpose

    Jan 1, 1954

  • NIOSH
    OFR-80-80 Splice Testing Using A Figure-S Machine And A New Shuttle Car Simulation

    By J. Tomlinson

    Shuttle car trailing cable splices were tested for resistance to failure upon being subjected to repeated bending, abrasion, and tensile shocks using a new testing method that closely simulates shuttl

    Jan 1, 1979

  • SAIMM
    The link between photovoltaics, sustainability, and the metals industry, N.J. Bartie and M.A. Reuter

    By M. A. Reuter, N. J. Bartie

    Metals make modern societies function, and increasingly, various high purity precious and special metals endow sustainability-driving technologies with specific functionalities. These metals become he

    Jan 1, 2020

  • CIM
    Cominco's Trail zinc pressure leach operation

    By W. A. Jankola, M. T. Martin

    "The world's first zinc pressure leaching plant at Cominco's Trail operations started production in 1981. Sullivan zinc concentrate is leached at the rate of 190 tpd in a four-compartment au

    Jan 1, 1985

  • SME
    Development of Steel-Fiber Reinforced High Fluidity Concrete Segment and Application to Construction

    By Aki Fujii, Hiroshi Dobashi, Mitsuro Matsuda, Yoshinari Kondo

    INTRODUCTION The Metropolitan Expressway Central Circular Route with a total length of approximately 47 km is located outside the Inner Circular Route of Tokyo (at a radius of approximately 8 km f

    Jan 1, 2007

  • CIM
    Sinking Operation at McIntyre No. 11 Shaft, Porcupine District, Northern Ontario

    By H. A. Kee

    In the mining industry, as in other business, one of the more satisfactory results of sincere but cheerful effort lies in the proper completion of undertakings and problems, which, to be successful, m

    Jan 1, 1928

  • AUSIMM
    Platinum Mining and Sustainability - Understanding the Environmental Costs of Future Technologies

    By G M. Mudd

    The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain

    Jan 1, 2009

  • SME
    Ashbridges Bay Treatment Plant Outfall TBM Risk Mitigation— Prescriptiveness and Verification of TBM Fabrication - RETC2023

    By Dan Ifrim, Andre Solecki

    Tunneling could be a major challenge to tunneling contractors as tunneling operations can be seriously affected by the Tunnel Boring Machine (TBM) performance. Specifying the appropriate TBM methodolo

    Jun 13, 2023

  • SME
    EPB Bypass and Hanging of 2.6 m Dia. Sewer under Live Flow Conditions

    By Matthew Geary, Stephen J. Marino, Jordan A. Schreiner

    "INTRODUCTION Project Overview The Southeast Collector (SeC) is a new 15km long 3.0m internal diameter wastewater tunnel designed by Hatch Mott MacDonald (HMM) that twins the existing 2.6m diameter Yo

    Jan 1, 2016

  • DFI
    Vibro Stone Columns With Preloading – An Effective Foundation Solution For Large Storage Structures

    By Ramanathan C, Prasad P. V. S. R

    The most critical challenge for any large size storage structures to be constructed on soft compressible soils is bearing capacity and consolidation settlements. Consolidation is the time dependent ph

    Sep 1, 2022

  • SME
    In-Pit Blending for Daily Ore Control at Ispat Inland Mining Company's Minorca Mine

    By Scott W. Harrison, Richard E. Aaseng

    In 1993 Ispat Inland Mining Company began mining its Laurentian ore reserve, which has six distinct ore types that are extremely variable. Initially batch processing was necessary to optimize mining e

    Jan 1, 2000

  • SAIMM
    Innovative Process Design for Copper-Cobalt Oxide Ores in the Democratic Republic of Congo

    By C. van der Merwe, R. Lumbule, J. Kgomo

    "The mining industry in the Democratic Republic of Congo has seen a significant expansion in copper and cobalt production in recent years. The greater proportion of this expansion has arisen through p

    Nov 1, 2018

  • AUSIMM
    Work Organisation for Attractive Mining – Lean Mining and the Working Environment

    By J Johansson, J Lööw

    Attractive mining workplaces are good, safe and healthy environments. They are also workplaces that the workforce of the future wants to work in. As skilled miners and engineers are already scarce, th

    Nov 4, 2015

  • NIOSH
    Bulletin 36 Alaskan Coal Problems

    By Walter L. Fisher

    The public interest in the Alaskan situation is such that, with the consent of the President, I have concluded, at the request of the American Mining Congress, to make at this time a candid, if somewh

    Jan 1, 1911

  • CIM
    Development of HPGR Circuit Based on the Operating Parameters and Material Characteristics

    By V. Sheikhzadeh, M. Saghaeian, R. Hejazi, P. Ghobadi

    Design and selection of equipment for a grinding circuit strongly depends on the mill function, ore properties and requirements of the down-stream circuit. Primary mills usually work in open circuit a

    Jan 1, 2016

  • CIM
    Mucking efficiency in open pit blasting

    By J. J. Montoro

    The influence of blasting on the excavators’ efficiency, defined as mucking rate (amount of rock mucked per unit time) and mean bucket load (amount of rock loaded in each bucket operation), is investi

    Jan 1, 2007

  • NIOSH
    IC 7044 Installation Of High-Tension Power Circuits In Coal Mines ? Introduction

    By E. J. Gleim

    In April 1932, the Bureau of Mines published Information Circular 6595, entitled "Data in Reference to Installation of Cables in Shafts and Boreholes", in which were described methods followed in vari

    Jan 1, 1939

  • AUSIMM
    Influence of Section Intake Dust Levels as an Exposure Assessment Parameter in Dust Exposure Level Index (DELI) Model

    By H R. Phillips

    Fresh air intake in an underground coal mine is of critical importance to the occupational health and safety of workers due to the dynamic, confined and dangerous nature of the mining environment. In

    Jan 1, 2005