Search Documents

  • SAIMM
    SmartFloat™: Bringing Artificial Intelligence to the Flotation Reagent World

    By J. P. Garnier, T. Bhambhani, J. A. Garcia, N. Renaud

    Most flotation plants use a static reagent scheme, i.e., a set combination of collectors, frothers, and modifiers. This scheme is usually developed and refined over time to deliver optimal (not necess

    Jan 1, 2023

  • AIME
    A Computer Application For Truck Allocation With Shovel, Crusher And Quality Constraints

    By Boris J. Kochanowsky, Burke O. Trafton

    Because of the strict requirements on the quality of limestone that are dictated by the users, the operator was compelled to find new approaches to produce a product of uniform and acceptable quality.

    Jan 1, 1969

  • CIM
    Tailings Disposal, Generation of Acidity from Pyrrhotite and Limestone Neutralization of Wastewater at Falconbridge's Onaping Mines

    By L. S. Rivett, U. M. Oko

    The Strathcona mine, with a large new underground operation and concentrator, was recently brought into\ production by Falconbridge Nickel Mines Ltd. The tailings disposal and water utilization proble

    Jan 1, 1971

  • IOM3
    Risk analysis design applications in mining geomechanics

    By R. J. Pine

    Procedures are described for the application of risk analysis or probabilistic methods to mining geomechanics. The methods are widely applicable to existing mine design models. Detailed examples are g

    Jan 12, 1992

  • SME
    Integrating a Drill Rig into the Digital Mine 4.0 Ecosystem - SME Annual Meeting 2025

    By Max Friedemann, Alexandros Bousdekis, Anna Gustafson, Helmut Mischo, Håkan Schunnesson

    Many devices used in mining are not monitored by sensors or do not have their own intelligence. By retrofitting sensors and real-time data processing, machines can be integrated into an existing digit

    Feb 1, 2025

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014

  • NIOSH
    RI 2752 Methods Of Testing High-Pressure Natural-Gas Lines For Leakage Losses ? Introduction

    By E. L. Rawlins

    The Bureau of Mines, with the cooperation of the Natural Gas Association of America, has conducted a study of leakage losses from natural-gas transmission lines. This study has shorn that surveys to d

    Jan 1, 1926

  • CIM
    Sampling Sand and Gravel Deposits for Backfill at Hollinger

    By M. D. Quinn

    THE sand and gravel used for backfilling at the Hollinger mine is obtained from deposits in a low range of hills some three miles north of the mine, where the Company owns a number of claims. The mate

    Jan 1, 1944

  • NIOSH
    IC 8914 The Florida Phosphate Industry's Technological And Environmental Problems, A Review

    The Florida phosphate industry currently produces more than 80 pct of the total U.S. marketable output of phosphate rock. Because phosphate is one of three principal nutrients used in formulating a co

    Jan 1, 1983

  • NIOSH
    IC 6623 Procedure Of The Purchasing And Supply Departments Of The Miami Copper Co., Miami, Ariz. ? Introduction

    By Fred L. Bishop

    This paper describing the methods employed in the purchasing and supply departments of the Miami Copper Co., Miami, Ariz., is one of a series being prepared for and published by the United States Bure

    Jan 1, 1932

  • SME
    The human factors in the success of mineral processing projects

    By M. P. Smith, C. Hughes-Narborough, Y. T. Man

    "Money and reputations can be lost in bad projects. Causes of bad mineral processing projects include poor contract definition and purchase of equipment without adequate test work. However, the root c

    Aug 1, 2016

  • CIM
    The Present Status of Geophysics in Canada (ca0eafb9-53af-4309-9891-56c9a04e4d48)

    By A. A. Brant

    Self-potential methods are based ?on measurements on the surface of voltage distributions caused by natural sub-surface oxidation phenomena. The attempt is made to. correlate voltage minima or maxima

    Jan 1, 1942

  • TMS
    Tin Recovery from Waste Tinplates (presented at the 1999 Annual Meeting)

    By Ilija Ilic

    Recovery of tin from tinplate and production of good-quality detinned-plate for further processing in ironworks has been the subject of interest for many years. Tinplates are mostly used for productio

    Jan 1, 2000

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • SME
    Removing Diesel Particulate from Underground Mining; A View from the Frontlines

    By Stuart Lister

    "When MacLean Engineering chairman and founder Don MacLean got the first question from a minesite about the possibility of addressing ventilation limits through incremental fleet electrification, he w

    Jan 10, 2018

  • SME
    In The Future Maintaining And Proving Reserves Will Be More Difficult. - Introduction - Preprint 09-034

    By F. Heivilin

    If the past is the key to the future, we will have ?tough? times maintaining Industrial Mineral reserves we have and proving new reserves around our plants and in new locations. The tough times will c

    Jan 1, 2009

  • NIOSH
    IC 6832 Maintaining The Permissibility Of Electric Cap Lamps ? Introduction

    By D. H. Zellers

    Since its inception the United States Bureau of Mines has fostered the development of portable mine lamps. Although there is still much to be desired with respect to illumination in coal and metal min

    Jan 1, 1935

  • TMS
    The Solvent Extraction of Nickel, Cobalt and Their Associated Metals

    By Renato G. Bautista

    The solvent extraction separation of nickel, cobalt and their associated metals have been considered for industrial application since the early 1960's. This review of the solvent extraction proce

    Jan 1, 1993

  • NIOSH
    OFR-6-88 Coal Interface Detector Investigation

    By Richard P. Cislo

    The evaluation of the effectiveness of the time domain Coal Interface Detector developed by the General Electric Company under contract H0155120 is the subject of this report. The sensor utilizes diff

    Jan 1, 1987

  • DFI
    A New Method Of Analysis Of Pile Displacement In Soil With Respect To Time

    By M. England

    A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri

    Jan 1, 1993