Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
SmartFloat™: Bringing Artificial Intelligence to the Flotation Reagent WorldBy J. P. Garnier, T. Bhambhani, J. A. Garcia, N. Renaud
Most flotation plants use a static reagent scheme, i.e., a set combination of collectors, frothers, and modifiers. This scheme is usually developed and refined over time to deliver optimal (not necess
Jan 1, 2023
-
A Computer Application For Truck Allocation With Shovel, Crusher And Quality ConstraintsBy Boris J. Kochanowsky, Burke O. Trafton
Because of the strict requirements on the quality of limestone that are dictated by the users, the operator was compelled to find new approaches to produce a product of uniform and acceptable quality.
Jan 1, 1969
-
Tailings Disposal, Generation of Acidity from Pyrrhotite and Limestone Neutralization of Wastewater at Falconbridge's Onaping MinesBy L. S. Rivett, U. M. Oko
The Strathcona mine, with a large new underground operation and concentrator, was recently brought into\ production by Falconbridge Nickel Mines Ltd. The tailings disposal and water utilization proble
Jan 1, 1971
-
Risk analysis design applications in mining geomechanicsBy R. J. Pine
Procedures are described for the application of risk analysis or probabilistic methods to mining geomechanics. The methods are widely applicable to existing mine design models. Detailed examples are g
Jan 12, 1992
-
Integrating a Drill Rig into the Digital Mine 4.0 Ecosystem - SME Annual Meeting 2025By Max Friedemann, Alexandros Bousdekis, Anna Gustafson, Helmut Mischo, Håkan Schunnesson
Many devices used in mining are not monitored by sensors or do not have their own intelligence. By retrofitting sensors and real-time data processing, machines can be integrated into an existing digit
Feb 1, 2025
-
Design of Segmental Lining for Waterview Project, Auckland, New?ZealandBy S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
RI 2752 Methods Of Testing High-Pressure Natural-Gas Lines For Leakage Losses ? IntroductionBy E. L. Rawlins
The Bureau of Mines, with the cooperation of the Natural Gas Association of America, has conducted a study of leakage losses from natural-gas transmission lines. This study has shorn that surveys to d
Jan 1, 1926
-
Sampling Sand and Gravel Deposits for Backfill at HollingerBy M. D. Quinn
THE sand and gravel used for backfilling at the Hollinger mine is obtained from deposits in a low range of hills some three miles north of the mine, where the Company owns a number of claims. The mate
Jan 1, 1944
-
IC 8914 The Florida Phosphate Industry's Technological And Environmental Problems, A ReviewThe Florida phosphate industry currently produces more than 80 pct of the total U.S. marketable output of phosphate rock. Because phosphate is one of three principal nutrients used in formulating a co
Jan 1, 1983
-
IC 6623 Procedure Of The Purchasing And Supply Departments Of The Miami Copper Co., Miami, Ariz. ? IntroductionBy Fred L. Bishop
This paper describing the methods employed in the purchasing and supply departments of the Miami Copper Co., Miami, Ariz., is one of a series being prepared for and published by the United States Bure
Jan 1, 1932
-
The human factors in the success of mineral processing projectsBy M. P. Smith, C. Hughes-Narborough, Y. T. Man
"Money and reputations can be lost in bad projects. Causes of bad mineral processing projects include poor contract definition and purchase of equipment without adequate test work. However, the root c
Aug 1, 2016
-
The Present Status of Geophysics in Canada (ca0eafb9-53af-4309-9891-56c9a04e4d48)By A. A. Brant
Self-potential methods are based ?on measurements on the surface of voltage distributions caused by natural sub-surface oxidation phenomena. The attempt is made to. correlate voltage minima or maxima
Jan 1, 1942
-
Tin Recovery from Waste Tinplates (presented at the 1999 Annual Meeting)By Ilija Ilic
Recovery of tin from tinplate and production of good-quality detinned-plate for further processing in ironworks has been the subject of interest for many years. Tinplates are mostly used for productio
Jan 1, 2000
-
The North Strathfield Rail Underpass – Driven Tunnel Design and ConstructionBy E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares
The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,
Sep 17, 2014
-
Removing Diesel Particulate from Underground Mining; A View from the FrontlinesBy Stuart Lister
"When MacLean Engineering chairman and founder Don MacLean got the first question from a minesite about the possibility of addressing ventilation limits through incremental fleet electrification, he w
Jan 10, 2018
-
In The Future Maintaining And Proving Reserves Will Be More Difficult. - Introduction - Preprint 09-034By F. Heivilin
If the past is the key to the future, we will have ?tough? times maintaining Industrial Mineral reserves we have and proving new reserves around our plants and in new locations. The tough times will c
Jan 1, 2009
-
IC 6832 Maintaining The Permissibility Of Electric Cap Lamps ? IntroductionBy D. H. Zellers
Since its inception the United States Bureau of Mines has fostered the development of portable mine lamps. Although there is still much to be desired with respect to illumination in coal and metal min
Jan 1, 1935
-
The Solvent Extraction of Nickel, Cobalt and Their Associated MetalsBy Renato G. Bautista
The solvent extraction separation of nickel, cobalt and their associated metals have been considered for industrial application since the early 1960's. This review of the solvent extraction proce
Jan 1, 1993
-
OFR-6-88 Coal Interface Detector InvestigationBy Richard P. Cislo
The evaluation of the effectiveness of the time domain Coal Interface Detector developed by the General Electric Company under contract H0155120 is the subject of this report. The sensor utilizes diff
Jan 1, 1987
-
A New Method Of Analysis Of Pile Displacement In Soil With Respect To TimeBy M. England
A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri
Jan 1, 1993