Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
RI 8243 Methane Absorption in Oil Shale and Its Potential Mine Hazard (2ab8f622-8655-4e4e-84ca-70e53d16f7fd)By J. E. Matta
The Bureau of Mines made laboratory absorption measurements on oil shale samples, which showed that the amount of methane absorbed is proportional to pressure and oil yield, and can be much larger tha
Jan 1, 1977
-
Wet Shotcrete TrialBy A. D. Storrie
An underground wet shotcrete trial was completed last year to determine the effectiveness of wet shotcrete as an alternative support mechanism to dry shotcrete in the kimberlite environment. The wet s
Jan 1, 2001
-
RI 6027 Hydrogenation Of Coal To Gaseous Hydrocarbons ? SummaryBy Raymond W. Hiteshue
Experiments were conducted al temperatures of 480° to 800° C. and hydrogen pressure of 6,000 p.s.i.g. to determine the effect of coal residence time on the conversion of a high-volatile bituminous C c
Jan 1, 1962
-
Phosphorous Removal from Iron Ore with a Low Temperature Heat TreatmentBy R R. Lovel, G J. Sparrow
Currently there are large reserves of good quality iron ore near to existing infrastructure that are not being developed because the phosphorous levels are above acceptable market specifications. Sinc
Jan 1, 2009
-
RI 8792 - Corrosion of Selected Metals and a High-Temperature Thermoplastic in Hypersaline Geothermal BrineBy R. K. Conrad
The Bureau of Mines conducted corrosion research to determine suitable construction materials for geothermal resource recovery plants. Weight loss, pitting and crevice corrosion, U-bend stress corrosi
Jan 1, 1983
-
Dust Protection For Bag StackersBag stackers who use semi-automated palletizing machines and air slides may be exposed to high concentrations of dust. To reduce dust exposure, use an exhaust ventilation system in conjunction with an
Jan 7, 2001
-
Appendix III - Joint Venture Agreement Table of Contents, AnnotatedBy Karl J. C. Harries
"The Table of Contents that follows is only an example and is the Table of Contents from an actual negotiated agreement. It is merely intended to show how an agreement might be set out and the nature
Jan 1, 2003
-
Longwall Mining Under Linear Structures--A Case StudyBy W. M. Ma, W. L. Zhong, Syd S. Peng
In a longwall section that consisted of 7 longwall panels, there were two high pressure gas transmission pipelines across the panels burying from 3 to 10 ft. below the surface. One pipeline was 20 in.
Jan 1, 1986
-
Geometallurgy – Fifteen Years of Developments in Codelco: Pedro Carrasco ContributionsBy J Beniscelli
Some words to honour Pedro:Pedro was among the few persons with a very high level in geology modelling, resource and reserve estimation, geometallurgy development, sampling theory applications and a d
Sep 5, 2011
-
The Status Of Tunnel And Raise BoringBy Richard J. Robbins
Mechanical raise and tunnel boring are new techniques to most of the mining industry. Coal, salt and potash have been bored economically, but until recently boring machines were not designed specifica
Jan 1, 1964
-
IC 6730 Design, Equipment, And Construction Costs Of The Davis-Dunkirk Concentrator, Prescott, Ariz. ? IntroductionBy E. L. Sweeney
The mine and mill of the Davis-Dunkirk Lines, Inc., are about 16 miles by road south of Prescott, Ariz., which is the nearest railroad point for receiving mine and mill supplies and for shipping conce
Jan 1, 1933
-
Cleveland Meeting Huge SuccessBy AIME AIME
OUR own Institute of Metals and Iron and Steel divisions cooperated with the Iron and Steel Division of the American Society of Mechanical Engineers, the American Welding Society, and the American Soc
Jan 1, 1929
-
Aramid's Place in Underground Coal MiningBy Ronald P. Wright
ARAMIDS UNDERGROUND COAL MINING
Jan 1, 1993
-
Slurry Walls, Tiebacks, and Tiedowns: Maximizing the Efficiency of Underground Station SpaceBy James Parkes
"The proposed Baltimore Red Line light rail system includes a 3.4 mile downtown tunnel (DTT) with five underground stations. The design of the underground stations involved overcoming several challeng
Jan 1, 2016
-
Papers - Miscellaneous Heavy Metals and Alloys - Time-to-fracture Tests on Platinum, 10 Per Cent Iridium-platinum and 10 Per Cent: Rhodium-Platinum Alloys (Metals Technology, April 1943)By H. E. Strauss
The time-to-fracture test has been applied to pure platinum and to two alloys of platinum under the special conditions of small cross-sectional area of the specimens and of a test temperature above th
Jan 1, 1943
-
Papers - Miscellaneous Heavy Metals and Alloys - Time-to-fracture Tests on Platinum, 10 Per Cent Iridium-platinum and 10 Per Cent: Rhodium-Platinum Alloys (Metals Technology, April 1943)By H. E. Strauss
The time-to-fracture test has been applied to pure platinum and to two alloys of platinum under the special conditions of small cross-sectional area of the specimens and of a test temperature above th
Jan 1, 1943
-
Recommended Design Methods and Serviceability Limits for Permanent Rock BoltsBy D J Maconochie
The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with
Mar 8, 2011
-
IC 7026 A Technique For Use Of The Impinger Method ? IntroductionBy Carlton E. Brown
Inquiries and instructional work on the determination of the number concentration of dust in atmospheres known or suspected to contain pneumoconiosis (silicosis and asbestosis) - producing particulate
Jan 1, 1938
-
Management of Hydrogeological Risk in Tunnelling ProjectsA key driver to the success of a tunnelling project (the project) is the management of hydrogeological risk. The hydrogeological risk, if not managed, may cause significant impacts on the overall perf
Jan 1, 2008
-
Plant Operation and Control (7d40cad4-9719-4fe6-b060-dcbe0f67ce8e)By J. S. Johnson, W. C. McCulloch
All phases of plant operation must be synchronized so that the A number of interruptions in the flow of material may be reduced to a minimum. In the majority of plants operating under a labor agreemen
Jan 1, 1943