Search Documents

  • SME
    Experimental Study Of Improving A Mine Ventilation Network Model Using Continuously Monitored Airflow

    By RICHARD A. THOMAS, Liming Yuan, Lihong Zhou, DAVOOD BAHRAMI

    Mine ventilation simulation software has become an essential tool for the mining industry to design and manage mine ventilation operations. Building a well-calibrated mine ventilation network is time

    Aug 1, 2022

  • TMS
    Microstructural Control and Magnetic Properties of Nd-Fe-B Permanent Magnets

    By Toshiro Kuji, Masakazu Fujita, Tetsuji Saito

    "The magnetic properties of the magnetic materials were deeply dependent on the microstructures. In this study, the novel technique to produce the desired microstructures in a controlled manner was pr

    Jan 1, 1998

  • CIM
    Effect of Si Content on Thermal Shock Resistance of Al-Si-Cu Alloys

    By E. Nejati, S. Khoshkooei, V. Firouzdor, M. Akbari, F. Khomamizadeh

    In this study the effects of Si content on mechanical and thermal fatigue properties of Al-Si casting alloys were investigated. Repeated heating and cooling cycles were applied on the samples at 230°C

    Jan 1, 2006

  • ISEE
    "Journal: 100 Years / MILITARY ENGINEERING (Part IV) Mining and Demolitions General Staff, Ware Office, 1910 London"

    By Robert Hopler

    209. Nitro-glycerine is produced by the action of nitric and sulphuric acids on glycerine, and is a heavy liquid of oily appearance, of specific gravity about 1•6, varying from colourless when quite p

    Jan 1, 2011

  • SME
    By-Product Molybdenite Recovery In Chile Chemical Factors In The Selective Flotation Of Molybdenite

    By H. S. Castro

    The by-product molybdenite technology in Chile is reviewed. Flowsheets, reagents and some operation features for the actual six Chilean moly plants(Chuquicamata, El Teniente, El Salvador, Andina, Las

    Jan 1, 1998

  • TMS
    Interfacial Phenomena in Metals Processing with High Energy Density Beams

    By T. DebRoy

    In recent years rapid technological advances have been achieved in the application of high energy density heat sources such as lasers and electron beams in diverse metals processing operations such as

    Jan 1, 1993

  • SME
    Heap Leach Solution Management At Coeur-Rochester, Inc.

    By P. A. Anderson

    Innovative solution management is being used at Coeur-Rochester, Inc. to increase bullion production and decrease overall costs. New operating programs call for reduced solution application rates to t

    Jan 1, 1989

  • SME
    Excess Spoil Minimization And Fill Stability

    By M. Superfesky, P. Michael

    Introduction The US Office of Surface Mining (OSM) is proposing changes to the Code of Federal Regulations in the interest of minimizing the adverse effects of excess-spoil-fill construction on the

    Jan 1, 2007

  • AIME
    Edgar Hutton Dix, Jr. - Chairman, Institute of Metals Division

    By AIME AIME

    ED DIX, after studying both mechanical and electrical engineering at Cornell, started out to be an electrical engineer, then taught material testing at Cornell, and decided to become a metallurgist. H

    Jan 1, 1936

  • AIME
    Economics of Geothermal Heat as an Alternate Fuel

    By Donald Towse

    Geothermal energy can substitute for and compete with other fuels, but until now it has been used only in special situations where it costs much less than alternate fuels. Geothermal heat is expected

    Jan 1, 1977

  • AIME
    Heat and Entropy of Adsorption and Association of Long-Chain Surfactants at the Alumina-Aqueous Solution Interface

    By P. Somasundaran, D. W. Fuerstenau

    Adsorption isotherms for dodecyl sulfonate on alumina were determined at 45°C and 25°C and the data was used for calculating the partial molar heat and entropy of adsorbed ions under various concentra

    Jan 1, 1973

  • CIM
    Magnesium derived foams for hydrogen storage

    By J. O. G. Posada

    Magnesium derived foams were prepared by using the so-called baking of powder blended precursor material method. This method comprises mixing magnesium powder with a small fraction of blowing agent (Z

    Jan 1, 2005

  • SME-ICGCM
    In-Situ Coal Strength Determination - Case Studies

    By Kot F. Unrug

    Strength of coal is one of the governing factors in size determination of mine pillars, and therefore affects the percentage of extraction and thus, utilization of reserves. Coal strength is also impo

    Jan 1, 1995

  • TMS
    Gold, Base Metals, and Alteration as Indicators of Ore at Depth; A Case History of Recsk, Hungary

    By Geza Kisvarsanyi

    Ore deposits composed of enargite, tennantite, gold, and pyrite have been mined in volcanic rocks of Oligocene age (35 m.y.) at Recsk, Hungary. Vertical and horizontal zoning of the alunitic-argillic

    Jan 1, 1987

  • SME
    Mass Balances On A Spreadsheet

    By R. J. Roman

    The "mass balance" is unquestionably the most common class of problems for the process engineer'. Closely related, mathematically, is the "heat balance". Every laboratory test requires a mass bal

    Jan 1, 1992

  • CIM
    The Production of High-Purity Niobium Oxide from Pyrochlore-Perovskite Concentrate

    By F J. Kelly

    A chemical process, based on laboratory investigations, is proposed for the production of high-purity niobium oxide from a pyrochlore-perovsk1te flotation concentrate produced from ore obtained at the

    Jan 1, 1965

  • ABM
    Avaliação De Modelos De Predição De Propriedades Mecânicas Em Juntas Soldadas De Aço Sae 1045 Por Meio De Ensaios Mecânicos E Microscopia

    By João Paulo Meneguelli Campos

    O objetivo deste trabalho foi validar o modelo proposto por Kasuya et al para prever as durezas máximas da zona termicamente afetada (ZTA) em juntas soldadas de um aço com médio teor de carbono atravé

    Aug 17, 2017

  • TMS
    Tar Removal from Hot Coke Oven Gas for H2 Amplification with in Situ CO2 Capture

    By Huaqing Xie, Qingbo Yu, Qin Qin

    A novel sorption-enhanced steam reforming (SESR) process of hot coke oven gas (HCOG) was proposed for tar removal and H2 amplification, and was studied with the comparison of conventional steam reform

    Mar 1, 2018

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • CIM
    Effective Integration of Environmental Leadership and Environmental Management Systems within Cameco?s Mining Division

    By K. Nagy

    To support the implementation of its integrated SHEQ Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducin

    Aug 1, 2010