Search Documents

  • AIME
  • AIME
  • SME
    The necessity for improved hand and finger protection in mining

    By JOHN R. HEBERGER, MAHIYAR F. NASARWANJI, Jonisha P. Pollard, Lydia M. Kocher

    nt in the mining industry, and identifying factors associated with these injuries is critical for developing prevention efforts. This study identifies nonfatal injury incidence rates, nature of injury

  • CIM
    The Privateer Mine, Zeballos, B.C.

    By G. F. MacDonnell

    THE Privateer mine consists of a group of mineral claims situated in the Zeballos area, on the west coast of Vancouver island, approximately 180 miles north of Victoria. Although Zeballos is a compa

    Jan 1, 1939

  • SME
    Advanced Measurement And Monitoring Technologies For Environmental Problem Solving A Technology Review (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By F. B. Henderson III

    Since the "end" of the Cold War, revolutionary new research and commercial remote sensing capabilities are being developed that will dramatically change the way we map the earth and address its enviro

    Jan 1, 1999

  • AUSIMM
    A Review of ISO 5802:2001 Industrial Fans - Performance Testing In Situ

    By K J. Lownie, T Rafferty

    The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test

    Jul 1, 2013

  • CIM
    Three Dimensional Transient Analytical Modeling of Friction Stir Welding (FSW) Including Actual Affected Parameters

    By S. Rash Ahmadi

    Welding is highly reliable and efficient metal joining process. In welding the metal adjacent to the weld joint is subjected to severe thermal conditions. As a result, complex changes in metallurgical

    Oct 1, 2011

  • AIME
    Fuel Economy in the Lepol Kiln

    By R. A. Kinzie

    In a conventional cement plant, the drying and heating of the raw material takes place in the upper section of a cylindrical kiln where the heat exchange is poor. In a Lepol kiln this part of the proc

    Jan 1, 1950

  • SME
    Challenges in Metro Construction in India

    By Paul Nicholas, Raju Gottumukkala

    "India’s economy is expanding with rapid urbanization. Improvement in infrastructure is a keystone to the Indian government’s economic plans, including expansion of transit systems. Most of these syst

    Jan 1, 2016

  • ISEE
    Using An Anfo/coal Blended Blasting Mixture For Commercial Blasting Applications

    By Dennis Wilzbacher, John Wiegand

    In an effort to reduce the cost of bulk explosives, Vigo Coal Company found that the addition of coal mined at their Friendsville Mine, not only reduced explosive costs, but also appeared to actually

    Jan 1, 2007

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • CIM
    Reliability and maintainability models for mobile underground haulage equipment

    By L. K. Daneshmend

    "Competitive pressures dictate that the mining industry moves to larger mobile underground haulage equipment with more advanced equipment mechanization, higher levels of autonomous operation of machin

    Jan 1, 2003

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Mineralogical Quantification of Iron Ore Sinter

    By S Hapugoda, J Manuel, E Donskoi, L Lu

    Sinter can constitute up to 80–85 per cent of the total ferrous burden in modern blast furnace ironmaking operations. The mineralogy and microstructure of iron ore sinter play an important role in det

    Jul 13, 2015

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • CIM
    Suncor Energy Inc. - Oil Sands

    By Brad Bjornson, Geoff Stevens, Mike Ashar, Cliff Britch

    "LocationThe facilities are located 30 km north of Fort McMurray, Alberta (or 470 km northeast of Edmonton, Alberta).Brief Description of OperationThe operation includes the mining of oil sands, extra

    Jan 1, 2000

  • CIM
    Coal Mine Rock Dust Dispersibility Tests after Absorbing Moisture

    By R. C. Gilmore, J. F. Brune

    "Pulverized limestone rock dust used in United States underground coal mines to prevent and suppress coal dust explosions must easily disperse by forces of a methane or coal dust explosion. Moisture i

    Jan 1, 2019

  • IMPC
    Prediction Of Efficiency Of Flotation Collectors Based On Quantum Chemical Computations

    By Peter M. Solozhenkin

    Considering the main idea of the paper, namely that the interaction energy of reagents serves as a criterion used for their selection, as well as due to their insufficient study, the authors have ther

    Sep 1, 2012

  • CIM
    Advantages And Methods For The Real-Time Detection Of Hydrocyclone Operating Problems

    By M. Mai Manga, M. Renaud, A. Faucher, C. Bazin

    ABSTRACT Grinding circuits are operated in the presence of disturbances resulting from ore changes and equipment malfunctions, such as hydrocyclone overloading, worn or partly plugged apexes, surging,

    Jan 1, 2011

  • CIM
    New Developments in Ion Exchange Resins for the Recovery of Gold from Complex Ores

    By J. van Deventer

    Volatile gold prices in the face of rising costs for mining and refining is causing the mines to look for new ways to reduce costs and increase recoveries. This task is complicated by the fact that th

    Jan 1, 2014