Search Documents

  • SME
    Industrial Engineering Surface Mining Management Tool

    By J. A. Bowersmith

    The environment in which the surface mining industry operates today is considerably different than that of a few years ago. Increased pressure from the public, government, labor and internal industry

    Jan 1, 1976

  • SME
    Scale-Dependence And The Hydrologic Design Of In Situ Copper Leaching Operations

    By M. J. Friedel

    The scale-dependent hydraulic properties in a fractured porphyry copper oxide deposit are investigated for relevance to In Situ Leach Mining (ISLM) design. In most well field designs, mine operators a

    Jan 1, 1994

  • SME
    Safeguards To Prevent Airflow Reversal From Ventilation Changes

    By R. D. Peterson

    As underground mine operations expand, the ventilation systems supporting them become complex. Complexity increases with periodic ventilation changes. New diagonal connections require a rebalance of

    Jan 1, 2012

  • SME
    Use Of Lightweight Flyash Blocks To Construct Fills On Sensitive Soils

    By E. B. Kroeger

    One of the problems encountered when constructing a roadway is the planned route often needs to cross soils that are soft and highly compressible. An approach to dealing with soft and compressible so

    Jan 1, 2003

  • CIM
    Structure of Mineralized Zone, Kam Kotia Mine

    By Stewart A. Ferguson

    Location.-The property consists of eight claims (P-12339 to 12343, 12403 to 12405) in Robb township, adjoining Jamieson township on the west. A mocor road extends twenty-two miles northwest from Timmi

    Jan 1, 1945

  • ISEE
    Improve Milling Through Better Powder Distribution

    By Jack Eloranta

    Optimization of blasting requires the comprehension of processes including drilling through milling. The author has previously considered the role of powder factor in relationship to downstream proces

    Jan 1, 2001

  • IMPC
    Gold Leaching by Thiosulfate Solution and Recovery

    By Atsushi Shibayama, Toyohisa Fujita, Wan-Tai Yen, Ke-jun Liu

    "A gold has been leached with ammonium thiosulfate solution and several leaching conditions have been studied. The leached solution has been recovered by solvent extraction and the optimum conditions

    Jan 1, 2003

  • ISEE
    Modeling of Explosive Loading of Sand with a Coupled Euler-Lagrange Code

    By Leslie C. Taylor, Anthony L. Kee

    Computational modeling of explosively loaded saturated sand on a suspended plate is an inherently complex problem. In this study a computational method is used to predict the dynamic pressure load/imp

    Jan 1, 2005

  • IIMP
    Exploración geoestructural de estructuras anastomasadas en el corredor del sistema de fallas Ilo-Islay en el Batolito de Ilo con evidencias en el proyecto pórfido Cu-Au Kajol, Arequipa, Perú

    By W. Zezenarro, J. Medina

    El proyecto Kajol se encuentra a 154 Km al SW de Arequipa, en la Cordillera de la Costa (desierto de Clemesi) en la franja de pórfidos Tia María, La Tapada y Cruz de Mayo. El proyecto consta de rocas

    May 1, 2008

  • IMPC
    Extra-terrestrial Mineral Production: Multiple Aspects of Sustainability

    By L. S. Gertsch

    The production of minerals for human use at locations other than the Earth is expected to ?advance ? human prosperity in ? ways that [do] not compromise the potential prosperity and quality of life of

    Jan 1, 2014

  • AUSIMM
    Ultrastand - An Innovative Cable Bolt

    Cable bolts are being used more extensively by the mining industry for many different rock reinforcement applications. The configuration of these bolts has evolved over the last 20 years to meet the i

    Jan 1, 1992

  • NIOSH
    Ground Fall Injuries In Underground Stone Mines – Summary

    Workers in underground stone mines have a high fatality rate caused by falls of ground from the mine roof or rib. NIOSH recommendations to reduce ground fall injuries and deaths address baskets, mecha

    Jan 11, 2003

  • AIME
    Discussions - Iron and Steel Division

    E. A. Loria (Product Metallurgical Engineer, Crucible Steel Co. of America, Pittsburgh)—In this interesting paper, our introductory work was quoted. We would like to call attention to our sequel paper

    Jan 1, 1960

  • SME
    New Diversion Hydropower Plant—Nedre Fiskumfoss - RETC2023

    By Mads Aniksdal

    New Nedre Fiskumfoss is a construction project in North Trøndelag, Namsen River. The purpose of the contract is construction of a new hydropower plant, that will phase out the existing power plant in

    Jun 13, 2023

  • CIM
    An Overview of Corporate Social Responsibility in the Canadian Mining Industry

    By Dara L. Hrytzak-Lieffers

    Canada has long since been a place that has led the world in mining development, in a safe, clean, and sustainable manner. This has led to the integration of corporate social responsibility (CSR) phil

    May 1, 2011

  • CIM
    "Aluminium Smelter Plants - Concrete Pre-Fabricated Elements"

    By R. Carrier

    "There has been a continuous evolution with the use of pre-cast concrete elements in the construction of aluminum smelters. In 1990, Phase I of Alouette was built using cast-in-place concrete exclusiv

    Jan 1, 2006

  • AIME
    Risk Capital: Financing Junior Mining Companies

    By Murray Pezim

    In the good old days of the folklore of the mining industry, grizzled prospectors obtained a few loose dollars from friends and neighbours then wandered off to eventually return with the great discove

    Jan 1, 1985

  • NIOSH
    Final Report Of Investigation To The Diesel Emissions Evaluation Program (Deep) - Noranda Inc. - Brunswick Mine - Diesel Particulate Filter (DPF) Field Study ? Executive Summary ? About the Project

    By S. McGinn

    The Brunswick Mine Diesel Particulate Filter Study was one of several research projects initiated by the Diesel Emissions Evaluation Program (DEEP). The study was carried out at Noranda?s Brunswick Mi

    Jan 1, 2004

  • ISEE
    Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge (aa576ad1-736a-4e7e-9977-8fe1a93c21b3)

    By Jason M. Ryan, T Michael LeBlanc, John H. Heiiig

    Drill trajectory deviation is a recurring problem in the Mining Industry retreat stoping operations. As a result of this deviation, it is quite concevable that 60 kg (165 mm 0) and 103 kg (203 mm 0) e

    Jan 1, 1995

  • AIME
    Ground Movement Adjacent To A Caving Block In The Climax Molybdenum Mine

    By John W. Vanderwilt

    THE unpredictable behavior of ground movement and subsidence has complicated the problems that attend the extraction of large quantities of ore. Special studies, particularly relating to coal mining,

    Jan 1, 1946