Search Documents

  • SAIMM
    At the cocktail party after the A.G.M.....

    All photographs by Carlos Pais Pictures only.... no script.

    Jan 1, 1985

  • AUSIMM
    The Stabilization of Arsenic by Its Incorporation Into Lead-Zinc Smelter Slag

    By Lawson F

    Arsenic-containing waste was dissolved into molten slags and the leaching behaviour of the quenched arsenic-doped slags (containing up to 2.3 wt per cent arsenic) was ascertained to evaluate the poten

    Jan 1, 1996

  • AIME
    Foreign Production - Review of Petroleum Production in Countries Other than United States, Russia, Mexico, Venezuela, Colombia and Peru (with Discussion)

    By J. T. Duce

    In viewing the petroleum world as a whole certain tendencies arc to he noted. The first of these is of a legal and political nature. It involves the nationalization of the oil industry; in some instan

    Jan 1, 1928

  • RMCMI
    In Loving Remembrance (698b8ca6-dc7c-42b1-98fc-8ce503a4f240)

    of our good friends and fellow members: W. S. Worthington H. W. Bullock who left the world better for their having lived in it.

    Jan 1, 1932

  • AIME
    Report of the Membership Committee

    The name of this Committee, which was formerly known as the Committee on Increase of Membership, was changed in the revised Constitution adopted last year. At the same time, the form of organization a

    Jan 1, 1929

  • SME
    Stochastic Approaches To The Characterization Of Rock Mass Properties

    By K. Kim, H. Gao

    A site-characterization strategy formulated for the probabilistic assessment of rock mass properties is presented. The strategy, which takes into account the variability of rock properties and the sto

    Jan 1, 1997

  • SME
    Design Considerations for Top-Down Wall Construction in Carbonate Rock for Ohio River Bridges—East End Crossing Tunnels

    By Charles A. Stone, Eric C. Wang

    "Top-down wall construction was selected to excavate the tunnel portal headwall areas of the ORB East End Crossing tunnel. Benefits included an expedited construction schedule realized by staging exca

    Jan 1, 2016

  • AUSIMM
    Structural Geology as a Tool to Reduce Geological Risks at the Mt Whaleback Mine, Western Australia

    Structural geological information is widely used at the Mt Whaleback Mine, Newman, WA. Recent improvements in the structural understanding of Mt Whaleback are providing a very cost-effective way of

    Jan 1, 1994

  • AIME
    Louis Davidson Ricketts, President

    The following record of the important responsibilities already shouldered by Dr. Ricketts will give some indication of the trust and confidence reposed in him by his colleagues. The Institute is to be

    Jan 3, 1916

  • NIOSH
    Machine Injury Prediction by Simulation Using Human Models (0111a15c-4251-44e2-bc90-9d29854de8ad)

    By Dean H. Ambrose

    This paper presents the results of a study using computer human modeling to examine machine appendage speed. The objective was to determine the impact of roof bolter machine appendage speed on the li

    Jan 1, 2003

  • SAIMM
    The Development Of A Metallurgical Flowsheet To Treat Tails

    By H. Jeram

    The ilmenite, rutile and zircon processes of the mineral separation plant generate tailing streams, which still contain valuable mineral. This is due to a combination of factors, which include separat

    Jan 1, 2007

  • NIOSH
    RI 8725 Laboratory Studies on the Treatment of Ferric Chloride Stripping Liquor From a Clay-Hydrochloric Acid Leaching Process

    By Robert M. Doerr

    In a process being investigated by the Bureau of Mines for recovering alumina from domestic nonbauxitic resources, calcined kaolinitic clay is leached with hydrochloric acid. Iron impurity in the clay

    Jan 1, 1982

  • ISEE
    The Waiting Time Recovery Test

    By John T. Aler

    The U.S. Bureau of Mines has been studying the problem of why explosives detonate weakly or misfire during blasting in underground coal mines. Cross-borehole shock wave interaction has been identified

    Jan 1, 1991

  • DFI
    Non-Linear Analysis Of Large Pile Groups For The New Wembley Stadium

    By S. Hardy

    The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu

    Jan 1, 2006

  • AIME
    Increasing The Efficiency Of Macdougall Roasters At The Great Falls Smelter Of The Anaconda Copper Mining Co. (514834fb-6e50-43c7-b592-9a3e5ae4fb1c)

    By Frank Corwin

    I. INTRODUCTION. SINCE the first installation of MacDougall roasters at the Great Falls smelter of the Anaconda Copper Mining Co., the capacity of the furnaces has been more than doubled. During the

    Jan 7, 1913

  • AUSIMM
    The golden thread of waste characterisation from exploration drilling to waste rock placement

    By M Bettison, R Marton, R Wright, M Lowry

    Depending on the geological setting, waste rock from mining can present risks to achieving acceptable closure outcomes. In the Pilbara iron ore mines, the majority of waste rock is geochemically inert

    Jul 25, 2018

  • AUSIMM
    Screening Process: Modelling and Application of the Model to Sizing of Screens

    By Rubisov DH

    This paper is related to the problems of the mathematical modelling of vibrating screening process and to predicting the screening operation results. The authors propose a model of screening based o

    Jan 1, 1993

  • SME
    The International Economics of Molybdenum

    By Charles E. Scott

    The molybdenum industry has been in a depression since the beginning of the decade. Real molybdenum prices are significantly reduced from 1979-1980 levels when there was a perceived capacity shortage

    Jan 1, 1986

  • CIM
    The Impact of Heap Operational Changes on the Copper Production at Zaldivar

    By S. C. Bouffard

    Barrick's Zaldivar operation in Chile produces copper by heap leaching, solvent extraction, and electrowinning. The heap consists of a dynamic pad, and its stacking and operating conditions have

    Jan 1, 2007

  • SME-ICGCM
    The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)

    By Thomas Barczak

    Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to

    Jan 1, 2002