Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Heap Leaching with Fine Grinding and Agglomeration at Potosi - BoliviaBy Equivar J, Mirabal C, Pyper R
In 1984, work was started to determine the viability of heap leaching silver-containing waste dumps from Cerro Rico near Potosi - Bolivia, at an elevation of 4300 meters (14 100 ft.). The result tod
Jan 1, 1991
-
Process Development For A Gold/Silver Mining-Milling ProjectBy Robert J. Brison
On the basis of experience accumulated during the completion of some 150 gold/silver process development projects, general guidelines are presented for developing the most cost effective process for a
Jan 1, 1984
-
Economics – Price Forecasting and Sensitivity Analysis for Economic Analysis of Final Pit LimitBy Alan C. Noble
INTRODUCTION Forecasting of metal and mineral prices is a complex and hazardous undertaking. In order to accurately forecast prices, the complexities of both marketing and production must be modeled
Jan 1, 1979
-
Optimizing Roof Truss Installations With Body-Loaded Photoelastic ModelsBy Christopher Haycocks, Lawrence P. Johnson, George M. Neall, James M. Townsend
No method of roof control yet devised has proven to be universally acceptable for the wide range of strata conditions experienced in U. S. coal mines. However, a relatively new innovation, the roof tr
Jan 6, 1978
-
Heap Leaching With Fine Grinding And Agglomeration At Potosi - Bolivia (b05d4e28-14f2-47a0-a263-f92299ff2aa4)By W. Robert Rose, Randall Pyper, Carlos Mirabal, Jaime Eguivar
In 1984, work was started to determine the viability of heap leaching silver-containing waste dumps from Cerro Rico near Potosi - Bolivia, at an elevation of 4300 meters (14 100 it.). The result today
Jan 1, 1990
-
Silanes and Other Silane-like Surface Treatments for Inorganic FillersBy J. J. Kellar, W. M. Cross, H. Du, C. D. Struckman, D. A. Boyles
Silane coupling agents have been used in the filler industry for years. One particularly unique feature is the ability of the coupling agents to enhance the adhesion between filler and polymer matrice
Jan 1, 2003
-
Design and Construction of Gold Hill Tailings ImpoundmentsBy Gordon I. McPhail, John D. Nelson
Tailings management represents a major portion of the cost associated with extraction of gold. For each gram of gold extracted, 150 to 200 kg of waste material is produced. Because of environmental co
Jan 1, 1987
-
Vibration Effects on Historic StructuresBy Randy Wheeler
One of the more difficult topics to address concerns the effects of vibration on historic structures. Not only blast induced vibration, but also vibration from other transient and semi-continuous sour
Jan 1, 2004
-
Development of a Dynamic Blasting SimulationBlasting, particularly bench blasting, uses finite length cylinders of explosive close to two free faces. The rock to be blasted is usually intersected by a complex 3-D system of joints. To fully si
Jan 1, 1990
-
Electronic Detonators - Do They Add Value?By TA Louw, Dr CM Lownds
In an era where profits are constantly being eroded, mines are looking towards technology developments to assist them in solving mining problems and reducing mining costs. An emerging technology that
Jan 1, 2004
-
Computer Scheduling Of Furnace Product Withdrawal And Servicing OperationsBy S. F. Turcotte, B. J. Grierson
At the Q. I. T. ilmenite smelter, nine electric furnaces produce titania slag and iron At high power levels, a furnace requires either a slag or an iron tap approximately once an hour, using rail cars
Jan 1, 1969
-
Groundwater Evaluation and Control for Gold Mining ProjectsBy Adrian Brown
Groundwater inflow and impacts have become major aspects in the permitting and operation of many gold mines. First, the hydrothermal or placer genesis of many of the orebodies being investigated or pr
Jan 1, 1988
-
Some Problems Encountered During Pile Installation - SynopsisBy [D. N. ] Naresh
During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som
Jan 1, 1996
-
Some Characteristics of Low-carbon Manganese SteelBy V. N. Krivobok
THE study and use of low-carbon manganese steels have been curiously neglected in the general history of developments in alloy steels. Hadfield1 made an extensive study of manganese-iron-carbon alloys
Jan 1, 1927
-
RI 9552 - Timing and Duration of Subsidence Due to Longwall MiningBy Jeran Paul W., Michael A. Trevits
Subsidence data gathered by the U.S. Bureau of Mines over a series of longwall panels in the Pittsburgh Coalbed were studied to obtain insight as to the role of time in the subsidence process. It was
Jan 1, 1995
-
Reservoir Engineering-General - Physical Properties of Carbonated OilsBy D. D. Dunlop, J. R. Welker
The growing interest in the use of CO, in crude oil recovery increases the need for data on the effect of CO, on hydrocarbon physical properties. Data are presented on the solubility of CO, in various
-
Relation Of Gypsum Supplies To MiningBy D. H. Newland
CERTAIN observations from the field and laboratory suggest the need for recasting some of our ideas about gypsum as a rock-forming mineral and in relation to supplies for industrial use. Until about 2
Jan 9, 1921
-
Separation of Bitumen from Utah Tar Sands by a Hot Water Digestion- Flotation TechniqueBy J. F. Sepulveda, J. D. Miller
Tar sand deposits in the state of Utah contain more than 25 billion bbl of in-place bitumen. Although 30 times smaller than the well-known Athabasca tar sands, Utah tar sands do represent a significan
Jan 9, 1978
-
Major Inco Project Improves Sudbury OperationsIn late 1993, Inco Ltd. completed a $600-million environmental improvement project at its Sudbury, Ontario operations -the largest single environmental project ever undertaken by a Canadian corporatio
Jan 1, 1994
-
Coal Handling At ParadiseBy Stanley Kesler
The first of two initial 650-mw units of the Paradise Steam Station, located on the banks of the Green River in the south-central portion of the western Kentucky coal basin, is scheduled for operation
Jan 10, 1962