Search Documents

  • NIOSH
    RI 5368 Turbidimetric Determination Of Naphthalene In Gas ? Summary

    By L. J. Kane

    While analyzing synthesis gas produced from coal, the Bureau of Mines found that conventional procedures for naphthalene determination were difficult and time consuming. The Bureau developed a rapid a

    Jan 1, 1957

  • DFI
    Field Testing of Energy Piles at Virginia Tech (eec8519c-b3f5-4281-8615-91be67ef6c77)

    By C. Guney Olgun, Charles Elks, Sherif L. Abdelaziz, James R. Martin, Christopher Fox, Pier Luigi Iovino, Fatih Catalbas, Pierre Gouvin

    "Energy piles are a new innovative renewable energy technology to access and exploit the relative constant temperature of the ground for efficient heating and cooling of buildings. Examples of energy

    Jan 1, 2017

  • NIOSH
    RI 6085 Design And Initial Operation Design And Initial Operation Gasification Pilot Plant ? Summary And Conclusions

    By G. H. Gronhovd

    This report describes the design and initial operation of a slagging gasification pilot plant installed by the Bureau of Mines at the Lignite Research Laboratory, Grand Forks, N. Dak., in 1958-59. The

    Jan 1, 1962

  • NIOSH
    OFR-40-72 Research In Advanced Power Systems For Mining Health And Safety

    By E. S. Chalpin

    On 25 August 1971, the U.S. Bureau of Mines contracted with the Aerojet Liquid Rocket Company to perform an engineering research program to be completed on 25 May 1972. The program objective was to ev

    Jan 1, 1972

  • SME
    Underground Mine Development

    By G. T. Lineberry

    Underground mine development begins with the positive investment decision to mine and ends with the inception of full-scale exploitation. It incorporates all activities, personnel, and equipment requi

    Jan 1, 2008

  • NIOSH
    OFR-34-79 Automatic Fire Sensing And Suppression Systems For Mobile Mining Equipment

    By Ralph B. Stevens

    The objective of the Automatic Fire Sensing and Suppression Systems for Mobile Mining Equipment program is to document the design, fabrication, factory testing, 11-month in-mine testing, and final dem

    Jan 1, 1978

  • NIOSH
    OFR-41-88 Measuring Critical Mine Health And Safety Skills

    By Henry P. Cole

    A series of studies are described that identify critical health and safety skills needed by underground coal miners for coping with mine emergencies. First aid and self-rescue and escape were selected

    Jan 1, 1988

  • NIOSH
    RI 3168 The Determination Of Volatile Matter In Low-Temperature Cokes, Chars, And Noncoking Coals

    By H. M. Cooper

    Many analysts have had difficulty in obtaining accurate and consistent determinations of the volatile matter in low-temperature coke when the usual standard method for coal was followed. The tendency

    Jan 1, 1932

  • NIOSH
    RI 6301 Electrodeposition of Zinc

    By Glen C. Ware

    The Bureau of Mines determined the factors involved in the corrosion of starting sheets used in the production of electrolytic zinc with the ultimate purpose of adapting zinc starting sheets to commer

    Jan 1, 1963

  • SME
    Environmental Health and Safety

    By Raja V. Ramani

    Discussion in this section of the Handbook is limited to the working environment of miners, the mine workers themselves, and the machines used in mining (Fig. 11.0.1). The contents emphasize personnel

    Jan 1, 2008

  • SME
    The Art Of Air Pollution Control As Viewed By TVA

    By C. Jack Powell

    TVA's involvement in air quality programs is perhaps a bit unique. The Tennessee Valley Authority was established in 1933 as a regional resource development agency and therefore must view clean a

    Jan 1, 1972

  • NIOSH
    OFR-91-82 Analysis Of Coal Mine Electrical Accidents

    By W. L. Cooley

    Electrical accidents occurring in coal mines from 1975 through 1979 were categorized and analyzed. The data was searched for common electrical hazards, common activities on the part of those injured,

    Jan 1, 1981

  • ABM
    Innovative Vacuum-tank Degassing Technologies: Well-established Metallurgical Performance Figures Achieved By Using Dry Mechanical Pumps

    By Franco Gandin

    With increasing demands for highly performing and at the same time efficient and running-costs saving vacuum-degassing equipment, dry mechanical pumps have been confirmed a proper choice to completely

    Aug 17, 2017

  • NIOSH
    IC 8227 American Standard Safety Rules For Installing And Using Electrical Equipment In And About Coal Mines (M2.1) (Revision Of American Standard Safety Code For Installing And Using Electrical Equipment In Coal Mines, M2.1, 1952) ? Introduction

    Safety rules for installing and using electrical equipment in and about coal mines covered in this information circular supersede those previously included in Bureau of Mines Bulletin 514, issued in 1

    Jan 1, 1964

  • NIOSH
    IC 8227 American Standard Safety Rules For Installing And Using Electrical Equipment In And About Coal Mines (M2.1) (Revision Of American Standard Safety Code For Installing And Using Electrical Equipment In Coal Mines, M2.1, 1952) - Introduction (5314e5b6

    Safety rules for installing and using electrical equipment in and about coal mines covered in this information circular supersede those previously included in Bureau of Mines Bulletin 514, issued in 1

    Jan 1, 1964

  • NIOSH
    Bulletin 201 Prospecting and Testing for Oil and Gas

    By R. E. Collom

    The commercial development of petroleum and natural gas fields has reached its present status within 60 years and is still considered by some operators to be "100 per cent wildcatting." 1 A tendency t

    Jan 1, 1922

  • AUSIMM
    Anatomy of a Heating and Assessment of Critical Self-Heating Parameters

    Numerical modelling is a valuable tool for simulating the fundamental processes that take place during a heating. The models presented in this paper have enabled a quantitative assessment of the effec

    Jan 1, 2005

  • ABM
    Regeneradores De Calor – Ultimos Desenvolvimentos, Avaliação E Extensão De Campanha

    By Eric Schaub

    Hot Blast Stove Systems are an important equipment of a Blast Furnace plant. During the last years, performance requirements and operation practice for the Hot Blast Systems have changed and have a bi

    Oct 30, 2017

  • CIM
    Simulation of Extrusion Processes of Aluminum Profiles with Modeling of Microstructure

    By A. Ockewitz, A. Trondl, D. -Z. Sun

    "Numerical simulation of extrusion processes offers an efficient method for tool design and optimization of geometries and properties of extruded parts. However, until now there are few systematic inv

    Jan 1, 2018

  • DFI