    Replacement of Diatomaceous Earth Filter Aid with Alpha-Cellulose at the Laronde Refinery

    By François Robichaud

    "The Laronde mill has been in operation since 1988. Actual milling rate ranges from 7,000 to 8,500 mtpd. Laronde uses SAG/ball mill grinding followed by copper and zinc flotation circuits. A cyanidati

    Jan 1, 2007

  • SME
    Chambers Creek Interceptor Sewer Tunnel

    By J. Jeffrey Wagner, Michael J. Bailey, Peter M. Douglass

    The Chambers Creek Interceptor Sewer Tunnel project consisted of 2-1/2 miles (4 kilometres) of nominal 9-foot (2.7-metre) O.D. tunnel driven through predominantly glacially overridden soils. Mole-Coll

    Jan 1, 1985

  • TMS
    Simulation of The Moulds Filling by the Finite Elements / Control Volume Method During RTM Process

    By J. Samir

    The objective of this study is to simulate the isothermal filling up of moulds by a RTM process when adopting CV/FEM and VOF method and when also taking into account the presence of obstacles coupled

    Jan 1, 2009

  • SME
    APM Tunnels at Phoenix Sky Harbor International Airport

    By David M. Jurich, Randy J. Essex, Alex de Aboitiz

    An Automated People Mover (APM) transit system is planned for the growing Phoenix Sky Harbor International Airport. The APM will improve passenger movements between the terminals, and provide a link t

    Jan 1, 2005

  • TMS
    Recovery of Nickel and Cobalt by Pyrometallurgical Process of Waste from Producing Program of Nickel Metal Hydride Batteries

    By Hui Wang

    With the great increasing use of nickel metal hydride batteries recently, the waste of this kind batteries have been paid for close consideration. For the main reason that the waste of the batteries c

    Jan 1, 2009

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001

  • CIM
    Environmental Law and Regulation Challenges for the Mining Industry

    By R. Cotton

    "1. INTRODUCTIONTo say that the environment will be a dominant issue in the 1990' s is an understatement. A world-wide ""green revolution"" is taking place not only with the general public and politic

    Jan 1, 1991

  • SME
    A Structural Interpretation Of The Garlock Fault Zone At The Tehachapi Crossing

    By Chester M. F. Peters

    The opportunity to make a close study of the available geologic data existing along the line of the California Aqueduct crossing of the Garlock fault in the Tehachapi Mountains was brought about first

    Jan 1, 1997

  • CIM
    Updating the Lucky Friday Mill – Experiences in Revamping a Historic Milling Operation

    By Dale Dean, Bill Hancock, Raul Mondragon, Carlos Aguilar, Chris Martin

    "In 1942, commercial mining operations began in what is now the Lucky Friday Ag/Pb/Zn mine in Idaho’s Silver Valley. Wholly owned since 1962 by Hecla Mining Company, the mine has produced more than 14

    Jan 1, 2011

  • SAIMM
    Application Of Ecosystem Function Analysis (EFA) In Assessing Mine Tailings Rehabilitation: An Example From The Mhangura Copper Mine Tailings, Zimbabwe

    By G. M. Dowo

    The widespread environmental damage caused by slimes dam construction requires rehabilitation as one of the key management strategies towards land restoration. From the time when Mhangura Copper Mine

    Dec 1, 2013

  • SME-ICGCM
    Sub-Surface Ground Movements Associated With Longwall Mining

    By P. Gaskell

    The paper examines the development of rock movement between a longwall extraction horizon and the surface for a fully caved mining situation. Physical modelling has been used to examine the mechanics

    Jan 1, 1988

  • SME
    Suggested and Prescriptive Means and Methods—Are They Really in the Owner’s Interest?

    By Gary Almeraris, Vincent Jr Tirolo

    Traditionally, “Means and Methods” were the sole responsibility of Contractors. However, because of a number of litigious projects in the 1970s, Owners and their Engineers began including Suggested Me

    Jan 1, 2005

  • AUSIMM
    Potassium-Bentonite from Mount Kaputar, New South Wales

    Devitrification of a glassy volcanic ash equivalent to an alkaline trachyte in composition has resulted in the formation of an interstratified illite-montmorillonite with an 1:1\1 content of 1:4 as th

    Jan 1, 1967

  • SME
    Proactive Approach To Addressing Environmental Concerns For Tunneling Under Austin

    By Ray Brainard

    The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot

    Jan 1, 2012

  • NIOSH
    IC 9486 - Handbook for Methane Control in Mining - About This Handbook

    By Fred N. Kissell

    This handbook describes effective methods for the control of methane gas in mines and tunnels. It assumes the reader is familiar with mining. The first chapter covers facts about methane important to

    Jan 1, 2006

  • SME
    Equipment adds efficiency, safety to cross passage work

    From a vast army of workers to gargantuan machines to immense volumes of material being moved, almost everything about the Port of Miami Tunnel (POMT) project points to tunneling on a massive scale. A

    Sep 1, 2013

  • SAIMM
    Theory And Application Of Magnesia Ramming Material In Ferroalloy Refining Furnaces

    By Y. Jin

    Magnesia ramming materials have been widely used in China instead of magnesia bricks as furnace lining materials of ferroalloy refining furnace. The paper introduces the development of the ramming mat

    Jan 1, 2004

  • CIM
    Optimizing performance of AG/SAG mills – A design approach

    By Sanjeeva Latchireddi, Travis Orser

    "Today’s high capacity semiautogenous grinding (SAG) mills expend vast amounts of energy and in doing so consume tons of shell liners and steel balls, while processing ore. The energy efficiency of th

    Jan 1, 2005

  • AUSIMM
    The Rainfall Simulator for Hydrolic and Erosion Experiments on Mines, with an Example of its Application at Ranger Uranium Mine, Northern Territory, Australia

    By F Hancock

    A rainfall simulator was developed to assist with hydrogeomorphic research into the stability of engineered landforms associated with rehabilitated uranium mines in the Top End of Australia. It can be

    Jan 1, 1997

  • DFI
    A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil

    By W. Tom Witherspoon

    Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric

    Jan 1, 2009