Search Documents

  • NIOSH
    RI 3869 Recovery & Utilization of Oil From Oil Field Waste Emulsion

    By J. Wade Watkins, Joseph W. Horne, Arthur Matzick

    "A successful procedure for the recovery of a valuable product from weathered tank-bottom settlings has been developed in the laboratories of the Bureau of lines and used in a field pilot plant. These

    Mar 1, 1946

  • NIOSH
    OFR-43-75 Mine Air Monitor - Introduction

    By Arnold F. Stalder

    The measurement of various gas concentrations in the atmosphere at a particular location has become a problem of considerable importance. Levels that need to be monitored vary from the range of percen

    Jan 1, 1974

  • AUSIMM
    Climate Related Adaptation from Terrain Evaluation Results (CRATER) - Interpretation of Pre-existing Data for Mine Site Flood Vulnerability and Management

    By M Grigorescu, J H. Hodgkinson, H Alehossein

    A new framework that collates and interprets pre-existing data to assess vulnerability and ultimately plan to avoid or minimise flood-related risk to infrastructure, people, downtime, environment and

    Nov 26, 2013

  • SME
    From Sampling To Simulation: The BRGM Range Of Software For Process Analysis

    Since the beginning of the computing age, technical software packages have not been developed to address only programming specialists but have been dedicated to process engineers. For process analys

    Jan 1, 1997

  • IMPC
    Mathematical Modelling of Attraction Forces of Metal Magnetic Liners in Ball Mills

    By J. Zou

    With the increasing applications of the Chinese metal magnetic liners, the requirement for their technical specifications has become stricter and stricter. It is necessary to deeply analyse the metal

    Jan 1, 2014

  • AUSIMM
    Calculating the Value of Iron Ores in Ironmaking and Steelmaking

    By T Honeyands

    At present we are witnessing large investments in the iron ore industry, fuelled by demand from Asia. At the same time, there is a changing landscape in pricing of iron ores, with the recent demise of

    Jul 11, 2011

  • TMS
    Heat Recovery From High Temperature Slags: Chemical Methods

    By Yongqi Sun, Zuotai Zhang

    Hot slags, at the temperatures of 1450-1650 oC, carry a substantial amount of high quality thermal energy, which represents the largest undeveloped energy source in the steel industry. However, the wa

    Jan 1, 2016

  • AUSIMM
    Blue Mining, a holistic approach that integrates circular economy

    By S Nowosad, A Binder, O Langefeld, M Bothe-Fiekert, F Apollo

    The mining industry faces complex and urgent challenges driven by an increasing demand for raw materials, and a socially demanding globalised world. The extraction of primary raw materials is today mo

    Sep 1, 2024

  • NIOSH
    RI 4664 National Annual Survey Of Commercial Aviation Gasoline October 1949 Production

    By Blade O. C.

    This report is one of a series made by the Bureau of Mines under a cooperative agreement with the Coordinating Fuel and Equipment Research Committee of the Coordinating Research Council, Inc., on the

    Jan 1, 1950

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • IMPC
    Technology for gold recovery from poor argillaceous oxidized ores by a combined method

    By Arkady Senchenko, Andrey Vasiliev, Alexander Aksenov, Metodi Zlatev

    "This paper considers the issue of treating argillaceous oxidized ores with low gold grade (around 1.0 g/t). These ores according to their gold recovery level can be treated by heap leaching and agita

    Jan 1, 2014

  • CIM
    Safety Perception and its Effects on Safety Climate in Industrial Construction

    By G. Eaton

    Safety management is an important mortal and business function in construction. Contractors have traditionally tracked and reported lagging indicators, e.g. fatalities and lost-time accident rates, to

    Aug 1, 2013

  • SAIMM
    Reconciliation along the Mining Value Chain

    By A. S. Macfarlane

    "SynopsisMetal accounting and reconciliation is an increasingly important governance issue in all mining operations, in that it is required, from a risk management perspective, that the company is in

    Jan 1, 2015

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Comparison of Experiment and Simulation of Blast Loading on the Steel Beam

    By A Hosseinzadeh Barforoosh, A Abedi, M Taji

    The effect of blast loads on beams is one of the main issues in the analysis of steel structure. In this study, experimental tests on steel beam under blast loading, and also numerical simulation by t

    Aug 24, 2015

  • SAIMM
    A Test of the Appropriateness of the LUC Technique in High-Nugget Birimianstyle Gold Deposits

    By E. Maritz

    "The localized uniform conditioning (LUC) technique was proposed by Marat Abzalov in 2006. The technique converts conventional uniform conditioning (UC) grade-tonnage curves into single grade values a

    Jan 1, 2016

  • SME
    Verification of 3D Numerical Modeling Approach for Longwall Mines with a Case Study Mine from the Northern Appalachian Coal Fields "Mining, Metallurgy & Exploration (2021)"

    By Ihsan Berk Tulu, Ted Klemetti, Deniz Tuncay

    Accurately estimating load distributions and ground responses around underground openings plays a significant role in the safety of the operations in underground mines. Adequately designing pillars an

    Sep 23, 2020

  • ISEE
    Optimization of Up Raises from Blind-Hole to Multiple Blasting Events Methodology

    By S. Gajardo, E. Valdés Guerra

    Together with Sociedad Punta del Cobre S.A. (Pucobre) and Orica, we are carrying out a study of alternatives for methodology of excavation in Slot Up Raises from actually built with Blind Hole (BH) to

    Jan 1, 2024

  • DFI
    Embodied Carbon Assessment For A Multi-Phased Development Pile Testing Strategy

    By Jack Taggart, Chris Barker

    Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor

    May 1, 2022

  • AUSIMM
    Development of an acQuire Based Geotechnical Data Management System

    By V Pere

    A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio

    Aug 22, 2011