Search Documents

  • NIOSH
    Operation Of Electrolytic Manganese Pilot Plant, Boulder City, Nev. - Part I. Pilot-Plant Operation - Introduction

    By J. H. Jacobs

    This report records a chapter in the history of the development of an electrolytic manganese industry in the United States. Nearly all the manganese requirements of the United States have been import

    Jan 1, 1946

  • NIOSH
    RI 5215 Removal Of Moisture From Lignite In Inert-Gas Atmospheres ? Introduction

    By J. J. Hoeppner

    Accurate determination of moisture in coals of various ranks has long been a subject of intensive investigation. Excellent reviews of methods developed over many years are given by Brown (9)4/ and, wi

    Jan 1, 1956

  • NIOSH
    IC 8252 Mercury Potential Of The United States

    Mercury has been used by mankind since prehistoric times. It has been, and is now, widely used in industry and medicine and has unique properties which make direct substitution difficult or impossible

    Jan 1, 1965

  • NIOSH
    IC 8252 Mercury Potential Of The United States (2e1e0ae5-044d-4045-9121-a51137be1af6)

    Mercury has been used by mankind since prehistoric times. It has been, and is now, widely used in industry and medicine and has unique properties which make direct substitution difficult or impossible

    Jan 1, 1965

  • NIOSH
    RI 5095 Sulfidization Of Tin Oxide And Volatilization Of Tin Sulfide ? Summary

    By H. W. St. Clair

    This study was undertaken to provide a more adequate knowledge of the chemistry of the sulfide volatilization process for recovery of tin from low-grade Bolivian ores. The investigation was partly sup

    Jan 1, 1954

  • NIOSH
    IC 8432 Applying Marx And Langenheim Calculations To The Prediction Of Oil Recovery By Steamflooding In Venango Sands

    By Avis W. Effinger

    In conjunction with pilot steamflood tests in the Venango sands of Warren and Venango Counties, Pa., the Marx and Langenheim (4)3 calculations were adapted and programed for digital computer solution

    Jan 1, 1969

  • NIOSH
    IC 9414 Thermal Characteristics Of Reeled Trailing Cables For Shuttle Cars

    By P. G. Kovalchik

    Safe electrical operation of shuttle cars depends upon maintaining the trailing cable's conductor temperature below 90° C. However, trailing cables are wound on and off reels, which changes the h

    Jan 1, 1994

  • CIM
    No. 8 Shaft, Britannia Mines

    By Paul W. Billwiller

    Introduction In 1937, the Britannia Mining and Smelting Company, Limited, was carrying on an extensive exploratory diamond-drilling programme. Most of this drilling was done on the 4100 level, the

    Jan 1, 1946

  • NIOSH
    RI 3428 Carbonizing Properties Of A Subbituminous Coal From Puritan Mine, Dacono, Weld County, Colo. ? Introduction

    By J. D. Davis

    On May 15, 1936, Congress authorized the Bureau of Mines to conduct certain studies, experiments, and investigations of subbituminous coal and lignite .4/ Appropriations were made in July 1937, and si

    Jan 1, 1939

  • TMS
    Degradation of Plastics to Liberate Metals From Electronic Waste

    By Anne Kvithydl

    Printed circuited boards contain considerable quantities of valuable metal, while also containing many environmental pollutants making them unsuitable for landfill. In this study the decomposition of

    Jan 1, 2008

  • NIOSH
    RI 8448 Experiments in Hot-Rolling and Forging of Ductile Cast Iron

    By L. A. Neumeier

    The Bureau of Mines investigated hot-rolling and forging characteristics of experimental ductile iron castings, both sand and permanent-mold, made with charges containing up to 70 pct foundry pig iron

    Jan 1, 1980

  • CIM
    Use of Photogrammetry to Estimate Mine Pillar Damage and Strength

    By H. McIntire, R. Preston, D. Roberts

    "Repeated 3D terrestrial digital photogrammetric surveys were conducted on hard rock mine pillars to characterize damage during secondary mining. Damage was quantified by measuring Depth of Failure, D

    Jan 1, 2015

  • ISEE
    Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions

    By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill

    This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an

    Jan 1, 2017

  • CIM
    History and Development of Mount Wright

    By P. J. Bourassa

    Incorporated in 1957 under the laws of the Province of Quebec, Quebec Cartier Mining Co. undertook the development of its low-grade iron ore reserves located at Lac Jeannine in the southwest extremity

    Jan 1, 1977

  • SME-ICGCM
    New Developments in Self Drilling Rock Bolt Technology

    By Stephen C. Tadolini, Peter A. Gray, Robert Hawker, Andrew Sykes

    "Self-drilling rock bolts (SDRBs) that use pumpable cement grout to anchor bolts have been used successfully in the tunnelling and civil engineering industries for many years. Pumpable cement grout of

    Jan 1, 2010

  • SME
    Process Development Testing for Comminution Circuit Design

    "Metallurgical process development in greenfield projects must define the comminution flowsheet and establish the equipment sizes that are required to deliver the project design criteria. These are cr

    Jan 1, 2016

  • AUSIMM
    Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle Mine

    By R Lachenicht, J Player, A Thompson, E Villaescusa

    Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e

    Jan 1, 2008

  • CIM
    A Progress Report on the Coal Valley Mining Project

    By D. N. Thurston

    Luscar Stereo commenced construction of the mine at Coal Valley, Alberta, in August, 1976. It is designed to produce approximately 2.5 million clean short tons of steam coal annually - 2.0 million ton

    Jan 1, 1978

  • DFI
    Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)

    By John C. Niedzielski, A. Frances Ackerman

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l

    Jan 1, 2017

  • AUSIMM
    Measuring the Effectiveness of Change through Best Practice Reconciliation

    By G Pattenden, R Hargreaves, P Pettit

    "Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera

    Nov 15, 2016