Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Advanced Waste Water Treatment Of Leach Waters And In-Process Chemical Stabilization Of Precipitation By-ProductsBy D. McCarthy
This paper discusses the process involved in developing an optimum method of treating and removing heavy metals from water that have leached out from the native rock -prior to discharge back into the
Jan 1, 1992
-
The Ecstall Story: The Maintenance DepartmentBy O'Halloran. Gerard F.
"ECSTALL MINING has installed in their plants the most modern equipment in the mining industry. At the minesite, digital blocked frequency controls are used to monitor all crushers, conveyors, ventila
Jan 1, 1974
-
IC 8061 Coke Plants In The United States On December 31, 1960 ? Summary And IntroductionBy Joseph A. DeCarlo
This information circular presents data for 1960 on individual coke plants in the United States. All oven-coke plants in existence, whether active or idle at the close of the year, are listed in this
Jan 1, 1961
-
The Storage Of Anthracite Coal.By R. V. Norris
1. INTRODUCTION. THE anthracite coal trade, with a shipment averaging about 70,000,000 tons per year, differs essentially from other coal business, in the fact that the larger sizes, comprising about
Jun 1, 1911
-
IC 8640 Ash Utilization - Proceedings: Third International Ash Utilization Symposium. Sponsored By National Coal Association, Edison Electric InstituteMore than 400 academic, Government, and industry representatives attended the third symposium on ash utilization and technology held in Pittsburgh, Pa., March 13-14, 1973. Sponsored by the American Pu
Jan 1, 1974
-
Bulletin 82 International Conference of Mine Experiment Stations, Pittsburgh, Pa., September 14-21, 1912By George S. Rice
In 1911 the Director of the United States Bureau of Mines instructed the chief mining engineer of the bureau , during an investigation of coal-mine safety conditions in Europe, to ask the directors of
Jan 1, 1914
-
A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate PerspectiveBy A E. A Northcote
The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou
Mar 21, 2011
-
A Standard Classification For Uranium ResourcesBy P. M. Krishna
A five-year effort by the ASTM subcommittee E10.14 on Uranium Resource Evaluation has culminated in the approval of E901-82, Classification System for Uranium Resources. The standard classification wa
Jan 1, 1983
-
Flanders Completes First North American Dc To Ac Dragline UpgradeBy Michael Casson
With the mining industry changing rapidly due to mergers, acquisitions and fluctuating market pricing, today?s market for coal, minerals, ores and aggregates demands electrical apparatus that perform
Jan 1, 2013
-
RI 3151 Use Of Micropyrometer For High-Temperature Melting-Point Investigations (5154fa11-9a46-44db-af71-95b4d00428da)By G. R. Fitterer
In the manufacture of steel by any process the refining period involves the partial elimination of the metalloids carbon, manganese, phosphorus, and silicon, by virtue of their reactions with ferrous
Jan 1, 1932
-
Report on a Standard Wire Gauge(Read at the Amenia Meeting, October, 1877.) THE Committee on a Standard Gauge have been constantly engaged, since their appointment, in the duties assigned to them.§ They have corresponded with diff
Jan 1, 1878
-
New Reactor Concepts For Direct Coal-Based Continuous Steelmaking (Invited) (ce3e9dcc-7e0b-463e-84cb-3fe27dbbc898)By Noel A. Warner
Modern steelmaking is based on direct use of oxygen in high intensity batch reactors. A totally new approach is proposed in this paper, based on the view that pursuit of high intensity is unlikely to
Jan 1, 2003
-
New Reactor Concepts For Direct Coal-Based Continuous Steelmaking (Invited)By Noel A. Warner
Modern steelmaking is based on direct use of oxygen in high intensity batch reactors. A totally new approach is proposed in this paper, based on the view that pursuit of high intensity is unlikely to
Jan 1, 2003
-
Production of Ultra-low-moisture Ore Concentrate Using Thermocompression-filtration TechnologyBy M. Y. Zhou
The paper elaborates on the significance of producing ultra-low-moisture ore concentrate, the operating principle and technical features of thermocompression- filtration process, the kinetics involved
Jan 1, 2014
-
The Petroleum Industry ? Development of Reserves Trails New Discoveries; Older Fields Required to Produce Beyond Maximum Efficient RatesBy W. S. Morris
PETROLEUM'S importance in World War II can perhaps be better realized by the recitation of a few facts and figures: Gasoline needs in this war are already eighty times greater than in the last w
Jan 1, 1945
-
OFR-38-76 The Feasibility Of Low Current Fault Detection By Differential Current Measurement ? 1.0 IntroductionBy Robert R. Perron
The U.S. Bureau of Mines is engaged in many diverse programs for improving mine safety. Of particular interest to the Bureau are new and improved means for minimizing the hazard of fire which can be i
Jan 1, 1974
-
Lr Process Expert - Cost-efficient And Modular Process Automation Expert Class System For Long Rolling PlantsBy Paul Riches
LR Process Expert is a cost-efficient process automation system for all types of long rolling mills, including, rod, bar, section, rail, reversing mills, and flat blocks. The system performs a wide ra
Aug 16, 2017
-
Application of Leading Practice Spontaneous Combustion Assessment to Exploration at the Doyles Creek ProjectBy J Edman, RáBeamish, G Cambourn, B Beamish
Moist Adiabatic Benchmark (MAB) and R70 testing have been applied to core samples of a multiple seam sequence from a borehole at the Doyles Creek Project. The coal samples range in rank from high vola
Jul 1, 2013
-
London One New Change - Energy Piles® And Open Loop Wells Used For Ground Source Heating And CoolingBy Peter Smith
One New Change is a landmark retail / commercial development in the City of London. Integral to the structure is the three double storey basement from which the building is serviced. The building cons
Jan 1, 2010
-
Project and Mining GeologyBy Donald A. Ranta
Every mineral project or mine is based on a geologic entity-an ore (mineral) deposit. A well-defined mineral deposit and its associated geologic characteristics are the only aspects of a project that
Jan 1, 2008