Productivity Improvement in Large Stripping MachinesBy Tom Learmont
The emergence of the dragline as the dominant stripping tool is described and reasons for this are noted. Brief comparisons are made with stripping shovels and wheel excavators. Representative output
Jan 1, 1976
-
Drilling-Equipment, Methods and Materials - Mechanics of Static and Dynamic Filtration In the BoreholeBy H. D. Outmans
The mechanics of filtration are described by a theoretical-empirical nonlinear diffusion equation which, under certain circumstances, may,be linearized and then solved explicitly. For filtration un
-
A Generalisation of GyÆs Model for the Fundamental Sampling ErrorMany sampling standards arrive at a value for the prescribed sample mass by assuming a specific relation between the sample mass and the relative standard deviation of the fundamental error and assign
Jan 1, 2005
-
Dust Deposition In Coal Mine AirwaysBy Welby G. Courtney
The Bureau of Mines conducted an exploratory field survey to determine the amount of airborne coal dust, the size distribution of the dust, and the rate of dust deposition in coal mine airways. The su
Jan 1, 1982
-
Experimental and Theoretical Measurement of the Aerodynamic Diameter of Irregular Shaped Particles (cb2693b4-8374-45fe-879f-1cccfef59f02)By W. E. Wallace, P. Bolsaltis, M. J. Keane, B. L. Rauaboni
Thermal treatment of respirable size silica dust samples results in marked changes in their hemolytic activity. These changes can be correlated with changes in the characteristics of the particle surf
Jan 1, 1988
-
Implementation of Acoustic Arrays for Semi-autogenous Grinding Mill?OperationBy R Wynn, R A. Pax, S Mann, B Cornish
The semi-autogenous grinding (SAG) mill at the MMG Century operation has failing load cells that are essential to the control strategy used to stabilise the mill. Currently, mill-bearing pressure is u
Sep 1, 2014
-
Design Software for Electronic DetonatorsBy Kia Riihioja, Mike Higgins
A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh
Jan 1, 2004
-
Investigating Total Media WearBy Peter Radziszewski
"Comminition process costs, which typically represent an important contribution to mining operating costs, can themselves be divided roughly between energy and liner /charge wear. As such, developing
Jan 1, 2001
-
Biodegradable Starch/Copolyesters Film Reinforced With Silica Nanoparticles: Preparation And CharacterizationBy Esperidiana A. B. Moura, Célio H. Wataya, Roberta A. Lima, Rene R. Oliveira
Biodegradable starch/copolyesters/silica nanocomposite films were prepared by melt extrusion, using a twin screw extruder machine and blown extrusion process. The influence of the silica nanoparticle
Jan 1, 2015
-
A Computer Program For The Analysis Of Coal Preparation Plant EconomicsBy Richard D. Zigmond
In this paper, a computer program that has been developed for determining the capital and operating costs for coal preparation plants is described along with its applications. The logic of the compute
Jan 1, 1981
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Prediction of Ground Vibration Induced Due to Single Hole Blast Using Explicit Dynamics Mining, Metallurgy and ExplorationBy R. K. Sinha, B. S. Choudhary, Desh Deepak, A. K. Mishra, Hemant Agrawal, Shankar Kumar
There are several methods (empirical, statistical, and machine learning tools) to calculate blast-induced ground vibration. Still, due to complications in the blasting procedure, under varying blastin
-
Production of High Strength Pipe Steels by the CSP® Thin Slab TechnologyBy J. Kempken, R. Hagmann, C. -P. Reip, W. Hennig
The CSP technology symbolizes a highly productive process for the cost-effective production of steel grades with a range of sophisticated properties comprising both the inner quality of hot strip, its
Jan 1, 2005
-
Boddington Gold Mine Expansion Project Overland ConveyorBy T. Hollingsworth
The Boddington Gold Mine, located near Perth in Western Australia, has recently completed the construction of a new process plant. An overland conveyor system was installed to convey the ore from the
Jan 1, 2010
-
Non-Metallic Coatings for Corrosion ProtectionBy W. N. B. Armstrong
CORROSION of metals, for the purpose of this talk, may be divided into two general classes, namely, atmospheric and chemical. Atmospheric corrosion is caused by the natural agents -water, air, salt,
Jan 1, 1958
-
Mineral Particle Interactions in Gypsum-Supersaturated Process WaterBy R. M. Beauchamp
Base metal processing operations often treat process tailings and acid mine drainage using a high density sludge (HDS) water treatment process. Lime is used in this process, which reacts with existing
Jan 1, 2006
-
Energy Saving in Copper ElectrowinningBy C. Lupi
"The energy consumption of copper production by electrowinning, generally represents more than 1/4 of the total energy requirement in hydrometallurgical traditional process (roasting, leaching, purifi
Jan 1, 1997
-
Part V – May 1969 - Papers - The Effect of Fabrication Variables on the Creep-Rupture Properties of Molybdenum-Base AlloysBy R. L. Stephenson
The effect of fabrication variables on the creep-rupture properties of TZM (Mo-0.5 pct Ti-0.08 pct Zr-0.03 pct C), Cb-TZM [columbium-modified TZM (7140-1.5 pct Nb-0.5 pct Ti-0.8 pct Zr-0.05 pct C)], a
Jan 1, 1970
-
Optimisation of the Prominent Hill SAG MillBy Mark Weidenbach
OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a
Jan 1, 2012
-
Blasting In Close Proximity to Densely Populated CommunitiesBy Radhe Krishna, Mutale William Chanda, Timothy Mwale
Blasting as a process is the emplacement of industrial explosives into blast holes suitably located to a free surface and detonated. Every blast hole containing a certain amount of explosive charge un
Jan 1, 2015