Search Documents

  • TMS
    Copper Electrowinning at INCO's Copper Refinery

    By P. M. Tyroler

    Inco operates a hydrometallurgical plant to treat the residue from the pressure carbonylation process. The main constituent in the residue is cop¬per. The residue is leached under pressure in an acid

    Jan 1, 1987

  • AUSIMM
    The Geology of the Eloise Copper-Gold, Deposit, NW Queensland, Australia

    By T. Baker

    The Eloise Cu-Au deposit is 60 km SE of Cloncurry in NW Queensland and has a current indicated reserve of 3.2 Mt @ 5.8 per cent Cu, 1.5gA Au and I9g/t Ag. It is hosted by metasediments and metabasic

    Jan 1, 1994

  • AUSIMM
    A Chloride Process for Recovery of Metallic Tin From Low Grade Concentrates

    Results obtained from small scale tests using Australian tin concentrates indicate that metallic tin containing less than 0·1 per cent iron can be recovered by a two-stage process using hydrogen

    Jan 1, 1974

  • IMPC
    Maximising the Value of ‘A Wealth of Information’ (1e5cd2ab-37d3-481c-b69f-500fafd475e7)

    By Rob Morrison, Andrew Scott

    "Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data – especially with semi-automated data acquisi

    Jan 1, 2003

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • AUSIMM
    A mobile laboratory for nickel prospecting and drilling operations

    This paper describes a mobile laboratory developed specifically for nickel prospecting, and which was designed to be operated by sub-professional staff in remote areas independently of established lab

    Jan 1, 1970

  • TMS
    3-D Weld Pool Convection - A Dimensionless Presentation

    By Y. H. Wang, S. Kou

    "Three-dimensional weld pool convection was computer simulated using dimensionless variables. The electromagnetic force, the buoyancy force and the surface tension gradient on the pool surface were tr

    Jan 1, 1986

  • AUSIMM
    Technical Note-A problem with ventilation network analysis

    This technical note describes a problem with WANG82, a ventilation network analysis programme. The problem was highlighted by Renison Ltd when using the programme on large, complex networks. Under cer

    Jan 1, 1986

  • CIM
    Characterization of Nanometer and Ultrafine Diesel Aerosols in the Underground Mining Environment

    By Aleksandar D. Bugarski

    Despite extensive research efforts conducted in the past decades, occupational health risks associated with exposure to nano and ultrafine aerosols emitted by diesel power equipment are still not comp

    May 1, 2007

  • CIM
    Canada Tungsten ? Change to Underground Mining & Description of Mine-Mill Procedures

    By W. W. Cummings

    Canada's only current tungsten producer started up in 1962 with a small open-pit mine on the Flat River , 180 air miles north of Watson Lake, Yukon Territory. The orebody was in a contact-metamor

    Jan 1, 1977

  • NIOSH
    RI 4393 Investigation Of Limestone Deposits Near Arlington, Snohomish County, Wash.

    By Constantine C. Popoff

    Several limestone deposits in western Washington were examined by the Bureau of Mines in 1946. This report presents data obtained from the investigation of limestone deposits in the vicinity of Arlin

    Jan 1, 1949

  • NIOSH
    IC 6553 Crushing And Grinding Limestone At The Howes Cave (N. Y.) Plant Of The North American Cement Corporation ? Introduction

    By W. J. Fullerton

    This paper is one of a series prepared for the United States Bureau of Mines discussing the methods used in crushing and grinding materials for cement manufacture, and deal particularly with the metho

    Jan 1, 1932

  • NIOSH
    IC 8346 Bibliography Of Investment And Operating Costs For Chemical And Petroleum Plants, January-December 1966 ? Introduction

    By Sidney Katell

    This report, covering the period January 1966 through December 1966, is a continuation of a series that began with the publication of Information Circular 7516 in October 1944. It is the eighth in a s

    Jan 1, 1967

  • CIM
    Regional Discussion of the Cardium Formation

    By S. R. L. Harding

    "Introduction0N MAY 2th, 1953, Socony Seaboard Pembina No. 1 well, located 70 miles west-southwest of Edmonton, was completed as a producer of high-gravity oil from the Cretaceous Cardinm sand. This e

    Jan 1, 1955

  • SME
    Fluid Coupling Setup on a Multiple Motor Conveyor Drive

    By R. Parkins

    This paper will discuss a method used to refine the fill level, and orifice size for a dual motor conveyor drive with extended delay chamber fluid couplings. The subject conveyor is located on the sur

    Jan 1, 1996

  • DFI
    Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a Seawall

    By Paul J. Sabatini, Yazen A. Khasawneh

    "A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse

    Jan 1, 2017

  • TMS
    Horizontal Mould Filling of a Tidn Wall Aluminium Casting

    By L. Katgerman, R. Van Toi, H. E. A. Van den Akker

    "Mould filling simulations are powerful tools for optimizing the characteristics of castings. The robustness of calculational methods for mould filling simulations is generally tested in simple geomet

    Jan 1, 1999

  • CIM
    Application of Air to Asbestos Milling at the New Jeffrey Mill of the Canadian Johns Manville Company, Limited, Asbestos, Que.

    By H. Rozovsky

    "AbstractThis paper discusses the methods of handling air in a large asbestos mill presently being completed at the Jeffrey mine of the Canadian Johns-Manville Company in Asbestos, Quebec.The mill, be

    Jan 1, 1955

  • SME
    Sales Comparison Valuation Of Development And Operating Stage Mineral Properties (35d10c9f-1d98-4437-8650-1c6154123f45)

    By T. R. Ellis

    Minerals Appraisers/Valuers often find great difficulty or failure in attempting to employ the Sales Comparison Approach to the Market Value Appraisal of development and operating stage mineral proper

    Jan 1, 2011

  • AUSIMM
    Environmental Planning for Mining of Cable Sands' Minninup Deposit, Western Australia

    By Martinick WG

    In July 1986, Cable Sands (W.A.) Pty Ltd commenced mining for mineral sands at Minninup, approximately 16 km south of Bunbury, Western Australia.The area being mined is from the heel of the foredune t

    Jan 1, 1986