Search Documents

  • NIOSH
    RI 7431 Evaluation Of Chemical-Cartridge Respirator Face Fit

    By Harold A. Watson

    A method for measuring leakage of vapors into a chemical-cartridge half-mask facepiece during simulated use is described. The respirator, fitted with high efficiency cartridges, is worn in a dichlorod

    Jan 1, 1970

  • SME
    Fine Gravity Concentration Pushed To The Limit

    By R. H. Mozley

    It is not my intention in this paper to review recent developments in the mineral processing industry which might fall under the above heading, but to refer to some of the research that I have done ov

    Jan 1, 1984

  • AIME
    Easton Paper - A Modification of Coingt's Charger

    By Frank Firmstone

    In April, 1873, No. 2 furnace at the Glendon Iron Works being out of blast, it was decided to alter it from an open to a closed top. The three side flues, through which a part of the gas was formerly

  • IOM3
    Probabilistic risk analysis of slope stability

    By A. P. Whittlestone, J. D. Johnson, R. J. Pine, M. E. Rogers

    standpoint. The effect on efficiency of collisions

    Apr 1, 1995

  • SME
    Construction of a Mixed Face Reach Through Granitic Rocks and Conglomerate

    By John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler

    The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol

    Jan 1, 2007

  • CIM
    On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’

    By Phillip Cancilla, Daniel Roy, Frank Rosenblum

    "The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti

    Jan 1, 2001

  • SME
    Construction of the West Area CSO Tunnels and Pumping Station

    By Ray Hutton, Darrell Liebno, Taro Nonaka

    Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont

    Jan 1, 2007

  • SME
    Experimental Design And Implementation Of Soil Bioengineering Measures On AML Slopes

    By R. J. Sweigard

    Stabilization of slopes on abandoned mine land (AML) invariably involves some channelization to control surface drainage. Typically, these channels are lined with riprap or gabions, depending on gradi

    Jan 1, 1998

  • ABM
    Installation Of A 350 T Bof Converter At Arcelormittal Poland

    By Günther Staudinger

    Danieli Linz Technology has been honored at 4.1.2013 with the first contract for the exchange of a 350 t BOF converter for ArcelorMittal Poland Dabrowa Gornicza on a turnkey basis. This paper describe

    Jul 29, 2018

  • IMPC
    Effect of Physical Collector Sorption on Flotation Parameters

    By S. A. Kondratyev

    "The present research work aims at disclosing the dependence of flotation concentrate recovery and its grade on the physically adsorbed collecting reagent properties, viz., surface pressure in the rea

    Jan 1, 2018

  • CIM
    The JORC Code —Maintaining the standard (5ac53f1e-7e19-4af1-878c-db9069b75b44)

    By P. R. Stephenson

    "The Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC Code) has been operating successfully for 14 years, and has an ancestry dating back over 30 years. Together with comple

    Jan 1, 2004

  • NIOSH
    IC 7402 Industrial Uses of Limestone and Dolomite

    By Nan C. Jensen, Oliver Bowles

    "INTRODUCTION Limestone (which consists essentially of calcium carbonate) and dolomite (calcium magnesium carbonate) occur widely in the United States. Their presence is of vast economic importance, b

    May 1, 1947

  • AIME
    Extractive Metallurgy Division - Development of the Modern Zinc Retort in the United States

    By H. R. Page, A. E. Jr Lee

    From the inception of zinc retorting on a commercial scale in the United States in 1890,' the retort employed has undergone wide variations in its composition and manufacture, facilitating in par

    Jan 1, 1950

  • SAIMM
    Cut-off grade determination for the maximum value of a small Wits-type gold mining operation

    Work undertaken in the field of cut-off grade optimization has not advanced much beyond the work undertaken by Lane in 1988. His definitive work is based on the calculus of the Net Present Value crite

    Jan 1, 2003

  • CIM
    Parameters for Cyclone Selection

    By Norman A. Jull

    "Factors which affect the separation achieved in a hydrocyclone are discussed and illustrated with graphs of some mathematical relationships.Definitions of separation and sharpness include comment on

    Jan 1, 1972

  • ISEE
    Electronic Detonators on Crazy Horse Mountain: A Pre-Split Study

    By Douglas Bartley, Kevin Hachmeister, Rich Barry

    The use of explosive energy as a tool in mining and construction is the most effective way to move large amounts of rock that is otherwise unable to be efficiently excavated. Since the early days of e

    Jan 1, 2004

  • SME-ICGCM
    Design Optimization of Longwall Chain Pillars

    By Behdeen Oraee, Amirhossein Bangian, Kazem Oraee

    "Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple

    Jan 1, 2010

  • SME
    Metallurgical Development And Design For The Pascua Lama Project

    By R. A. Williams

    The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is

    Jan 1, 2001

  • ISEE
    The Assessment of Environmental Impacts of Blasting During The Construction of A Metro Tunnel

    By Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Kagan Ozdemir, Adiguzel Deniz

    This paper presents the results of ground vibration measurements induced by blasting during the construction of the Istanbul Kadiköy-Kartal metro tunnel which has been driven at a depth of approximate

    Jan 1, 2007

  • AIME
    Secondary Recovery and Pressure Maintenance - Waterflood Calculations for Multiple Sets of Producing Wells

    By S. A. Hovanessian

    The method of characteristics which reduces the Buckley-Leverett mnlineur, partial differential equation to two first-order, linear differential equations is applied to the solution of a waterffood re