Search Documents

  • IOM3
    Comparative analysis of toppling behaviour at Chuquicamata open-pit mine, Chile

    By P. Varona, L. Lorig, M. Board, E. Chacon

    Geomechanical factors at the mine are important and will become even more relevant as the pit expands and deepens. To address these demands a team was assembled to collect geomechanical information an

    Apr 1, 1996

  • NIOSH
    IC 6501 Essential Factors Influencing Subsidence And Ground Movement - Introduction

    By W. R. Crane

    Subsidence and ground movement are phenomena common to and attendant upon practically all large-scale mining operations, and under certain conditions may occur in all workings, large and small. The

    Jan 1, 1931

  • SME
    Electrostatic Fogging Suppresses Respirable Rock Crucher Dust

    Electrostatically charged water droplets efficiently suppress breathable dust produced during open air rock crushing operations, according to recently completed independent tests conducted for the Env

    Jan 6, 1981

  • SME-ICGCM
    Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)

    By Frank E. Chase

    The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar

    Jan 1, 2005

  • SME
    Numerical Simulation Of Yield Pillar Behavior With Creep Material Model (e3731e33-0b34-4fad-9202-9242771c3a27)

    By C. Sun

    In this study, numerical simulations of yield pillars employing the finite element method with time-dependent Drucker-Prager material model are conducted. The stress control mechanism of yield pillars

    Jan 1, 1999

  • CIM
    Isasmelt™ - Smelting more with Less

    By Biplop Das, E. Herrera, A. Burrows, P. J. Mackey, G. R. F. Alvear Flores

    Since the first commercial plant was built at Mount Isa, another twenty ISASMELT™ furnaces have come into commercial operation, and construction of new plants continues. The primary copper ISASMELT™ t

    Jan 1, 2015

  • CIM
    The measurement of radon emanation rates in a Canadian cut-and-fill uranium mine

    By J. W. M. Porritt, K. C. Cheng

    Knowledge of radon emanation rates from uranium-bearing rocks is essential to the design of mine ventilation systems for uranium mines. Measurements of equilibrium ratio between radon and its daughter

    Jan 1, 1981

  • AIME
    Institute of Metals Division - Comments on the Determination, Analysis and Representation of Preferred Orientation (TN)

    By R. O. Williams

    A recent article by Chernock, Singer, Mueller, and Beck 1 which supports the use of the integral of I sin $ d$ for comparing fiber texture data does not settle what happens to I sin ø as ø approach

    Jan 1, 1960

  • AIME
    New York Paper - Ae 1, the Equilibrium Temperature for A 1 in Carbon Steel

    By Henry M. Howe

    COLUMBIA UNIVERSITY The Equilibrium Position of A 1.—Some of the most important data on this subject are collected in Table I. Definition of Ae 1.—-Just as we call A 1 of rising temperature Ac 1

    Jan 1, 1914

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • SME
    Computerization In Planning Of Mining Operations At Deep Mines - Development Of The Scientific Method

    By A. S. Astakhov

    Working out of the production calendar plans (schedules) at deep mines which provide for the interaction of all kinds of mining operations determining coal output growth and mining and technical indic

    Jan 1, 1979

  • SAIMM
    Ilmenite Smelting At Ticor SA (c5ed7b50-45b1-4be9-8346-a5752e8bd56e)

    By H. Kotzé

    Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and mineral separation plant were approved in 2000. The smelter, just outsid

    Jan 1, 2006

  • NIOSH
    IC 8396 Prospecting And Exploring For Radioactive Minerals: Supplement To Facts Concerning Uranium Exploration And Production

    This report includes a short history of uranium and its uses, mineralogy of common uranium minerals, and information on the use of electronic prospecting equipment and tests for detecting the presence

    Jan 1, 1968

  • SME
    An Approach to the Classification of Weak Rock for Tunnel Projects

    By Steve Klein

    Weak rock is an important consideration in tunnel design and construction due to the difficult ground conditions that are often encountered. Nevertheless, when conditions are favorable high advance ra

    Jan 1, 2001

  • NIOSH
    Quick-Opening Port For Permissible Enclosures - Objective:

    To provide a faster means to open and close permissible electrical enclosures. Approach: An inspection and repair port with a multiple start thread which provides a permissible joint has been

    Jan 1, 1976

  • NIOSH
    OFR-117-80 Heap Leaching Studies On Uranium Ore - Phase VI: Field-Scale Heap Leaching Test Program

    By Robert Merritt

    Approximately 2,500 tons of low-grade uranium ore were used to conduct a field-scale heap leaching test as well as throe column leach tests. The ore used to construct the field-scale heap leaching tes

    Jan 1, 1980

  • AIME
    Institute of Metals Division - Thermodynamic Properties of Solid Fe-Au Alloys

    By L. L. Seigle

    Free energies, heats, and entropies of mixing of solid Fe-Au alloys have been measured by the galvanic cell method between 800° and 900°C. A positive deviation from Raoult's law and a large exces

    Jan 1, 1957

  • SAIMM
    Letter - Delfos &Atlas Copco Travel Grant

    By M. J. Deats

    Your article on page 202 of the August 1993 Journal refers. I was surprised to read that this grant was first introduced in 1984 as it was awarded to me (albeit under the auspices of The Institution o

    Jan 1, 1993

  • AUSIMM
    On-Stream Shale Detector for Sedimentary Iron Ores

    By Holmes R. J, Miles J. G

    An on-stream shale detector has been developed that is suitable for use on conveyor belts carrying iron ore of up to 200 mm particle size. The shale is distinguished from high-grade iron ore by means

    Jan 1, 1981

  • AUSIMM
    Separation of ultra-fine particles using the REFLUX™ Graviton

    By J L. Carpenter, S M. Iveson, K P. Galvin

    Wet beneficiation of iron ore fines less than 1 mm typically involves a desliming stage ahead of the fine gravity separation such as spirals. The desliming is achieved using a bank of cyclones. The re

    Jul 24, 2017