Search Documents

  • NIOSH
    IC 8204 Mining Methods And Costs, Mouat Mine, American Chrome Co., Still Water County, Mont. (92c1131e-e784-4994-8b74-2febee9dafcb)

    By Paul M. Price

    The Mouat mine, Nye, Mont., was reopened in 1953 by the American Chrome Co. under a Defense Minerals Production Administration contract. Operations were terminated in 1961 after completion of the cont

    Jan 1, 1963

  • DFI
    Pneumatic Sinking 2.0: A World Record Caisson Project By Large Scale Innovations Evolution In Theory And Revolution In Practice

    By Bartho J. Admiraal, Antoine Feddema

    Pneumatic sinking of caissons has been established from mid-19th century. The technique of pneumatic sinking has been applied on many projects for underground construction up to depths over 20m below

    May 1, 2022

  • CIM
    Duckbill Mining at Franklin Mine

    By David Burchell

    Duckbill mining is probably the simplest method of loading coal mechanically at the face in underground mines. It is a means of reducing the amount of physical labour required to produce a ton of coal

    Jan 1, 1947

  • NIOSH
    IC 6562 Abrasive and Industrial Diamonds

    By Paul M. Tyler

    "In preparing this paper the writer has perforce depended mainly upon published information, including the catalogs and pamphlets issued by importers and dealers such as the Diamond Drill Carbon Co. a

    Mar 1, 1932

  • SME
    Markets And Distribution Of Canadian Potash Offshore

    By Rod Heath

    The Saskatchewan industry has the advantages of an ore body of a size and consistency unmatched anywhere else in the world, and large, efficient mines with production costs that compare favourably wit

    Jan 1, 1985

  • SME-ICGCM
    Catastrophic Collapse Of Highwall Web Pillars And Preventative Design Measures

    By Karl Zipf

    In highwall mining, once a sufficient number of web pillars are developed, they can fail catastrophically in a domino-type failure, posing a safety hazard to highwall miners and sterilizing mineable r

    Jan 1, 1999

  • SME
    International Standards for Tailings Management - SME Annual Meeting 2025

    By Charles Dumaresq

    The management of mine tailings poses a complex range of potential risks, including physical risks, such as the risk of catastrophic failure of a tailings facility and chemical risks such as the risk

    Feb 1, 2025

  • CIM
    The Re-emergence of Resin in Pulp with Strong Base Resins as a Low Cost, Technically Viable Process for the Recovery of Uranium

    By Chris Fleming, John R. Goode, James Brown

    "Data will be produced from two uranium feasibility studies that were conducted in 2008, both involving uranium recovery from leached slurry by resin-in-pulp (RIP) with strong base resins. Excellent m

    Jan 1, 2010

  • ISEE
    Assessment of Perimiter Blasting at the Homestake Mine

    By J Deen, P Sterk, W Forsyth

    Homestake Mining Company has made a firm commitment to develop a functional and cost effective perimeter blasting program. The goal of the program is to develop smooth, sound walls in all development

    Jan 1, 1997

  • NIOSH
    RI 3949 Exploration of the Gold, Silver, Lead, and Zinc Properties, Eureka Corporation Eureka County, Nevada

    By E. O. Binyone

    "https://www.youtube.com/watch?v=PBPyGXjlBHIhttps://www.youtube.com/watch?v=3AbtiKOYg7Y&feature=push-fr&attr_tag=uKtVW3yq2ZngptnE%3A6https://www.youtube.com/watch?v=PR2THayf-N8https://www.youtube.com/

    Dec 1, 1946

  • AIME
  • AUSIMM
    Cost Effective Concentrator Design

    By G Lane

    This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati

    Aug 8, 2011

  • CIM
    United Keno Hill Mines

    By Jr. Carmichael

    "THE MAYO AREA was prospected as early as 1887. The first major activity started in 1898, when the Stewart River and its tributaries were examined for placer deposits, and in succeeding years the dist

    Jan 1, 1949

  • AUSIMM
    Recovery of Sulphur from Smelter Gases at Kalgoorlie

    Some design and feasibility studies have been made into possible methods of economic recovery of sulphur from smelter gases emitted at Western Mining Corporation's Nickel smelter at KalgoorIie in

    Jan 1, 1983

  • AIME
    Recent Improvements in Concentration and Amalgamation

    By John A. E. M. Church

    THE prospector's pan was the first implement used for saving gold, and its action is so effective that it has never been equalled for thorough work. Copper plates, blankets, sluices, and amalgama

    Jan 1, 1880

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990

  • CIM
    Some Geochemical Considerations for Platinum-Group-Element Exploration in Layered Intrusions (538dc986-ca54-4e8c-8b54-af3cdab56d86)

    By A. E. Boudreau

    It has long been recognized that platinum-group-element (PGE) deposits in layered intrusions preferentially occur in intrusions that crystallized from high-Mg parent magmas. Recent studies suggest tha

    Jan 1, 1995

  • SAIMM
    Improved Technologies In Longhole Blast Hole Drilling, Applied To Drop Raising And Longhole Stoping As Well As The Application Of A Small Twin Boom Mechanized Drillrig

    ?Longhole blast hole drilling? techniques are not new to the mining industry. Appropriate mechanization and improvement of the techniques and application has evolved from the industry requirements. T

    Jan 1, 2003

  • SME
    New Sulfur Based Collector System For Increased Recoveries Of Molybdenum And Copper

    By L. MacHue

    Sulfur containing collectors have been shown over the years to function as strong, selective and non-selective sulfide mineral collectors. Unfortunately, the majority of the widely known sulfur based

    Jan 1, 2010

  • DFI
    Performance Of A Large Diameter Drilled Pier

    By A. J. Partos

    One Liberty Place, at 315 m is the tallest building in Philadelphia, PA USA. It is supported on drilled piers socketed in heterogeneous rock. 3832 kN/m2 end bearing and 383 to 766 kN/m2 shaft resistan

    Jan 1, 1989