Search Documents

  • NIOSH
    IC 7939 Cost Of Tonnage Oxygen ? Summary And Conclusions

    By Sidney Katell

    Tonnage oxygen plants are or can be made available in sizes ranging from 150 to 1,000 tons per day. Capital requirements are estimated from $5,400 to $14,700 per daily ton, depending upon size of plan

    Jan 1, 1960

  • AUSIMM
    The Importance of Sampling in the Mineral Industry

    By R J. Holmes

    An accurate knowledge of the chemical, mineralogical and physical characteristics of ores and mineral products that are mined, processed and traded is crucial to effective resource utilisation, plant

    Jul 15, 2013

  • SME
    Planning Open Pit Mines Using Direct Block Scheduling Technology

    By Mauricio Brücher, Juan Camus

    This article deals with open pit mine planning and a computer technology known as Direct Block Scheduling, or “DBS”. This is an emerging technology for modeling mine exploitation strategies using mixe

    Jun 25, 2023

  • NIOSH
    Technology News - No. 534 - QuickFit Earplug Test Device

    To improve the level of hearing protection by providing workers with an inexpensive, easy-to-use device to check earplug fit. Background Approximately 30 million workers are exposed to hazardou

    Dec 1, 2008

  • IMPC
    Sustainable Mining in the European Union (EU)

    By S. Safak

    Europe retains a modest position in world mining activity in terms of scale of production and mineral reserves but maintains a non-negligible role in the world mining industry. The concept of sustain

    Jan 1, 2014

  • IMPC
    Development of a Sag Mill Model Based on the Sagdesign Test: Application to Plant Design and Optimization

    By M. Gonzalez Fernandez

    "Commercially introduced in 2004, the SAGDesign™ test has today proved its efficiency for sizing SAG mills for a wide variety of ores, from very soft to very hard ones. The interest of building a mode

    Jan 1, 2018

  • SME
    Rare Earth Elements and selected major elements distribution in the siliceous-clayey silts from the NE Pacific abyssal Basin (Clarion-Clipperton Fracture Zone)

    By Lukasz Maciag, Ryszard Andrzej Kotlinski, Ryszard Krzysztof Borówka, Dominik Zawadzki

    Concentration and composition of rare earth elements (REE) and major elements in the sediment samples from the IOM H11 Fe-Mn nodule deposit, eastern part of the Clarion-Clipperton nodule field (locate

    Sep 1, 2014

  • AIME
    Part VII – July 1969 - Papers - On The Temperature Dependence of the Flow Stress of Nickel-Base Alloys

    By R. G. Davies, P. Beardmore, T. L. Johnston

    The flow stress of a series of Ni-Cr-A1 alloys consisting of a dispersion of y' (based on Ni3Al) in a rnatrix of nickel-base solid solution y has been measured at temperatures up to 950°C as a fw

    Jan 1, 1970

  • IIMP
    Aplicación de ingeniería Industrial en las minas de Centromín Perú

    By Agustín Chang

    La aplicación de las técnicas de Ingenieria Industrial en las minas de Centro Min Perú son importantes para ayudar a las operaciones para mejorar la productividad y reducir los costos. Los resultados

    Nov 1, 1976

  • SME
    Laboratory Blasting Tests In Granite Blocks To Assess Permeability Enhancement For Modified In Situ Mining

    By S. A. Rholl

    This paper describes the Bureau of Mines experimental test program which evaluated the effectiveness of using high explosives to enhance orebody permeability. To determine the effect of stress on the

    Jan 1, 1991

  • IOM3
    Pilot-plant bio-oxidation of gold-bearing arsenopyrite concentrates

    By J. R. Budden, P. A. Spencer, J. Barrett

    The initially produced arsenic (III) is very toxic to the unconditioned culture but the mixed culture has the capacity to oxidise it to arsenic (V) in the presence of iron (III). It was possible to bu

    Apr 1, 1991

  • ISEE
    Super Accurate Detonators - A Rockblaster's Dream

    By Jan Westberg, Roger Holmberg, Bernt Larsson

    Over the last couple of decades there has been an increased demand from the market for precision detonators, partly because of a need for better blasting results and partly because of a need for bette

    Jan 1, 1988

  • SAIMM
    Case Study On Quantitative Risk Modelling To Obtain A Realistic Risk-Adjusted Project Valuation ? Synopsis

    By G. R. Lane

    A large opencast gold mining company in Africa had just completed a feasibility study for an expansion of the operations. A traditional net present value project valuation methodology had been used th

    Jan 1, 2013

  • CIM
    The new H-W orebody-cutoff grades and mine economics

    By Bruce K. McKnight

    "The new H-W orebody was evaluated by considering its production at three technically feasible rates. Capital and operating costs were estimated f or each rate and production sequences were establishe

    Jan 1, 1987

  • SME
    Construction Of Explosion Resistant Seals – Preprint 97-83

    By C. R. Stephan

    Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations

    Feb 24, 1997

  • SME
    Sizing

    By William E. Foreman

    Editor's Note: For purposes of uniformity throughout this book, Coal Preparation, 5th Edition, the editors have advocated the use of the U.S.A. Sieve Series of testing sieves (see Table 6-2) as t

    Jan 1, 1991

  • NIOSH
    OFR-33(1)-79 Application Of A Total System Surface Mine Simulator To Coal Stripping - Volume I - Executive Summary

    By R. V. Ramani

    This report, Volume I of the seven-volume Final Report on the U. S. Bureau of Mines research contract no. G0254030 titled Application of a Total System Surface Mine Simulator to Coal Stripping with th

    Jan 1, 1978

  • NIOSH
    IC 9486 - Handbook for Methane Control in Mining - About This Handbook

    By Fred N. Kissell

    This handbook describes effective methods for the control of methane gas in mines and tunnels. It assumes the reader is familiar with mining. The first chapter covers facts about methane important to

    Jan 1, 2006

  • SME
    Mixed Face Tunnel Jacking with a Grillage

    By J. E. Bernick, J. Davies

    This paper describes the design and construction of a 22.86 m (75 ft) long jacked tunnel, which was successfully installed, despite difficult mixed face conditions at Metro-North’s Westport Station, i

    Jan 1, 2005

  • CIM
    Measurement and Prediction of Dilution in a South African Gold Mine Operating with Open Stoping Mining Methods

    By P. J. Le Roux

    "Mining worldwide and definitely in South Africa, is constantly under pressure to reduce its cost structure so as to sustain profitability. In underground gold mines where an open stope mining method

    Jan 1, 2015