    A 3D-Fem Solver for Non-Steady State Navier-Stokes Equations with Free Surface. Application to Mold Filling Simulation in Casting Processes

    By E. Saez, M. Bellet, T. Coupez, O. Jaouen

    "The paper presents a 3D finite element solver for non-steady state fluid flow. The thermomechanical simulation package REM3D® has been initially developed to model Stokes' flow for polymer injection.

    Jan 1, 2004

  • DFI
    Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PR

    By Filippo Maria Leoni, Wesley Schmutzler

    "Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s

    Jan 1, 2015

  • CIM
    Characterization of the 75% Gd0.8Sr0.2Co03_6 / 25% Ce0.9Gd0.102-8 composite cathode system for use in intermediate temperature solid oxide fuel cells

    By L. B. Kilius

    The composite cathode system based on Ce0.9Gdo.1O2_,5 electrolyte with a painted cathode was used for an intermediate temperature (500-700°C) solid oxide fuel cell. This cathode system was chosen due

    Jan 1, 2005

  • NIOSH
    Mining And Preparing Domestic Graphite For Crucible Use. - Prefatory Statement.

    By George D. Dub

    The Bureau of Mines, in connection with the investigations of war minerals it conducted, examined the graphite deposits of this country, studied the methods of mining and preparation used, and sought

    Jan 1, 1920

  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • IOM3
    The case for continuity in extractive metallurgy (the eighth Sir Julius Wernher memorial lecture of the Institution of Mining and Metallurgy, delivered in London, 4 October 1971, at the symposium on Advances in extractive metallurgy and refining)

    By J. H. Chesters

    The main, though rarely mentioned advantage, is likely to be the standardisation of best practice and product. In a batch process conditions vary cyclically, but with a continuous process they would,

    Dec 1, 1971

  • SME
    Installation, Operation And Maintenance Problems With Large Vibrating Screens In Mineral Processing Applications

    By J. W. Scott

    The problems involved in installing, maintaining, and operating large vibrating screens have been summarized and discussed, based on a survey of current use of such screens in selected North American

    Jan 1, 1983

  • CIM
    Volcanic Deposits of Elemental Sulphur

    By A. F. Banfield

    "IntroductionELEMENTAL sulphur occurs in three types of deposits: in salt domes in the Gulf Coast region of the United States and Mexico, from which over 90 per cent of world native-sulphur production

    Jan 1, 1954

  • AUSIMM
    Exploring Optimised Delay Timing for Fragmentation

    By C K. McKenzie

    As more and more mining operations around the world either switch to, or trial, electronic initiation systems, the breadth of knowledge and experience regarding their effective application has widened

    Nov 8, 2011

  • CIM
    Mineral Possibilities of the Northwest Territories

    By A. W. Jolliffee

    ANY attempt to forecast the mineral resources of a largely unknown region is hazardous and, in the case of the Northwest Territories, such a task is even more hazardous than usual. This is not merely

    Jan 1, 1937

  • SAIMM
    Behaviour of paddled energyabsorbing rockbolts under complex loading laboratory conditions

    By J. Hadjigeorgiou, G. Knox

    Since their introduction in 2010, paddled energy-absorbing rockbolts have been widely used in seismically active hard rock mines. This paper provides new data and reviews previous work to quantify the

    Oct 9, 2024

  • SME
    Use of Structure from Motion Photogrammetry for Monitoring of Underground Storage Facilities

    By Malte J. M. Gurgel, Axel Preusse

    The planning, construction, and monitoring of underground storage facilities is a key factor in meeting upcoming challenges as part of the energy transition from fossil fuels to renewables. Therefore,

    Jul 1, 2023

  • CIM
    Tendencies and Considerations for Energy Efficiency in Sag Mill Circuit Design from Recent Projects in Chile

    By C. Schuffeneger

    "The design of SAG milling circuits for mining projects requires the incorporation of the energy consumption considerations and the evaluation between different flexibility-adding options to absorb th

    Jan 1, 2012

  • CIM
    Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration Plant

    By S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam

    At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale

    Jan 1, 2016

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    Improving Rehabilitation Outcomes using Biocrusts

    By S Doudle

    The Iluka Resources Ltd Jacinth-Ambrosia heavy mineral sand mine (South Australia) is located in an undisturbed semi-arid landscape consisting of sparse trees, shrubs and grasses. The soil interspaces

    Oct 5, 2011

  • NIOSH
    Bureau Of Mines Development Of Titanium Production Technology

    By J. L. Henry

    The development and status of technology for producing titanium from U.S. resource materials are summarized in this Bureau of Mines report. Commercially feasible processes and investigations of altern

    Jan 1, 1987

  • AUSIMM
    Productivity improvement through collaborative shift planning and tracking

    By E Deucker, A White

    Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their

    Oct 16, 2017

  • AUSIMM
    Incorporation of ore sorting into a proposed greenfields tin mining and processing project in Morocco

    By A N. Parry

    In May 2018 Kasbah Resources Limited (“Kasbah”) completed an ore sorting test work program which was a precursor to releasing in July 2018 an updated Definitive Feasibility Study (“DFS”) for the Achmm

    Nov 10, 2020

  • AUSIMM
    Hydrogeological characteristics of co‐disposed tailings and coarse rejects from coal processing

    By S Fityus, K Koosmen, J Simmons

    The purpose of this paper is to therefore investigate the hydrogeological characteristics of tailings, coarse and mixed rejects from coal processing to enable better understanding of the potential for

    Jul 1, 2021