Search Documents

Sort by

  • AUSIMM
    Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower Projects

    By A G. Noble

    Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of

    Mar 8, 2011

  • SME
    The Occurrence and Concentration of Rare Earth Elements in AcidMine Drainage and Treatment By-products: Part 1—Initial Surveyof the Northern Appalachian Coal Basin Mining, Metallurgy and Exploration

    By Paul F. Ziemkiewicz, Aaron Noble, Christopher R. Vass

    The conventional rare earth element (REE) industry has historically sought to develop ore deposits where geologic processes have produced mineralized zones with commercially attractive REE concentrati

  • AIME
    Blast-Furnace Practice

    By Chas. B. Dudley

    A Discussion of the papers of Mr. James Gayley, on "The Application of the Dry-Air Blast to the Manufacture of Iron," and of Mr. J. E. Johnson, Jr., on "The Physical Action of the Blast-Furnace," by M

    Sep 1, 1905

  • AIME
    Electrical Prospecting for Ore and Oil

    By Hans Lundberg

    GEOPHYSICAL methods as described in technical articles generally fail to answer the questions of prospectors and geologists as to which method they should apply and what information they may expect fr

    Jan 1, 1930

  • ISEE
    Open Face Design Optimization

    By Owen Collins

    In surface mining, designing patterns to reduce the probability of flyrock and optimizing fragmentation through powder factor calculations are important for safe, efficient blasts. The designed powder

    Jan 26, 2026

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • NIOSH
    IC 9508 - The Application of Major Hazard Risk Assessment (MHRA) to Eliminate Multiple Fatality Occurrences in the US Minerals Industry

    By A. Iannacchione

    Major Hazard Risk Assessment (MHRA)1 is used to help prevent major hazards, e.g., fire, explosion, wind-blast, outbursts, spontaneous combustion, roof instability and chemical and hazardous substances

    Jan 1, 2008

  • NIOSH
    Bulletin 132 Siliceous Dust in Relation to Pulmonary Disease Among Miners in the Joplin District, Missouri

    By George S. Rice, F. B. LANEY, A. J. Lanza, Edwin Higgins

    Under its organic act the Federal Bureau of Mines is directed to conduct investigations relating to the improvement of health conditions in the mineral industries. This report describes the lead and z

    Jan 1, 1917

  • NIOSH
    Bulletin 233 Protection of Oil and Gas Field Equipment Against Corrosion

    By R. Van A. Mills

    Rapid deterioration and destruction of metal equipment in oil and gas fields cause waste of resources and financial losses that must be lessened or eliminated if operations in many important fields ar

    Jan 1, 1925

  • IMPC
    Analysis of Dust Emission for Selected Crushers

    By A. Saramak

    "The paper focuses on problems of atmospheric pollution by the dusts, produced during the course of crushing and grinding processes, and the main objective of investigative programme is an assessment

    Jan 1, 2018

  • CIM
    CIM Industrial Minerals Leading Practice Guidelines

    By CIM Mineral Resource, Mineral Reserve Committee

    Industrial minerals are generally considered to include non-metallic minerals, mineral products, or materials that provide raw material inputs for the construction, chemical, and manufacturing industr

    Nov 19, 2023

  • AIME
    Coal - Kerosine Flotation of Bituminous Coal Fines - Discussion

    By L. E. Shiffman

    W. J. Parton—Those operators faced with the problem of treating fine coal whether in bituminous or anthracite will find this paper most timely. I would like to take this opportunity of discussing M

    Jan 1, 1951

  • AIME
    Coal - Kerosine Flotation of Bituminous Coal Fines - Discussion

    By L. E. Shiffman

    W. J. Parton—Those operators faced with the problem of treating fine coal whether in bituminous or anthracite will find this paper most timely. I would like to take this opportunity of discussing M

    Jan 1, 1951

  • CIM
    The Future of the Canadian Oil Industry

    By J. C. Rudolph

    "THE TOPIC on which I am speaking this afternoon is ""The Future of the Canadian Oil Industry.'' At the time of C + 100, we should take a searching look at ourselves, an honest appraisal of our achiev

    Jan 1, 1968

  • CIM
    A Heuristic for Fugitive Emissions Management

    By A. M. S. Hussein, B. E. Rogers

    Progressively more stringent emission limits and advances in regulations and enforcement have made air compliance more difficult for metallurgical facilities. This has historically required improved c

    Jan 1, 2015

  • CIM
    Coal in Centennial Year

    By A. Brown

    The swift decline of coal during the period of unprecedented expansion in the Canadian economy is a phenomenon deserving careful examination, because the underlying forces contributing to this decline

    Jan 1, 1967

  • SME
    Forecasting - The Sixth Sense

    By Sheldon P. Wimpfen

    Forecasting, an ancient art, is con-ducted by everyone in varying degrees. It is a vital aspect of mineral production and conditions must be predicted over a long time frame in all aspects of the indu

    Jan 1, 1983

  • SME
    Impact of Using Synchronous Condenser for Power System Stability and Improvement of Short Circuit Power in Mining Projects

    By M. Nambiar

    Due to the remote locations of the mining projects and the demand for long transmission lines to provide electrical power, mining sites often operate with poor network power quality and low short circ

    Feb 23, 2014

  • AUSIMM
    How to Create a Perfect Storm

    By A Chadwick, J de Ross, C Adams

    Imagine a æshinyÆ new mine, $1 B in the bank and record commodity prices. So how does a company and its management team create enough tension to maximise profit and to establish a culture that can wea

    Nov 20, 2012

  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018