Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Monitoring and Evaluation of Ground Movements Above a Deep Longwall Mine in the Eastern United StatesThe prediction and control of ground deformations due to underground mining are important considerations in the permitting, planning, and monitoring of coal mining operations. The prediction of mining
Jan 7, 2020
-
RI 6994 Hydrogen Cyanide From The Reaction Of Coal With AmmoniaBy Glenn E. Johnson
The Bureau of Mines investigated the production of hydrogen cyanide by reacting powdered coal (minus 300 mesh) with ammonia at 1,250° C in a bench-scale study. Both metallic and ceramic reactors were
Jan 1, 1967
-
Redevelopment of the Carnilya Hill MineThe Carnilya Hill Mine, a joint venture project between Western Mining Corporation Limited (WMC) and The Broken Hill Proprietary Company (BHP), is a nickel sulphide deposit being developed by the
Jan 1, 1981
-
Duluth Paper - The Resources of the Lake Superior Region.By John Birkinbine
In the belief that a resume of what will be exhibited during this meeting, and a brief record of progress in the seven years which have elapsed since the Institute's first visit to Lake Superior
Jan 1, 1888
-
RI 5515 Experimental Electric Furnace Smelting Of Siliceous Manganiferous Materials ? SummaryBy Lloyd H. Banning
ELECTRIC smelting tests were conducted at the Northwest Electro-development Experiment Station, Albany, Oreg., to develop a feasible process for producing silicomanganese from siliceous manganiferous
Jan 1, 1959
-
Nevada Wildlife Protection Situation ReportBy James R. Arnold
With all of the publicity, criticism, and notoriety that the mining industry has received over migratory birds, it is difficult to remember that six years ago no one even suspected that this issue wo
Jan 1, 1990
-
Solving The Flocculation ProblemBy M. P. Corriveau
This is the case history of how two nearby plants in Southwest Virginia solved their water clarification problems. While the solutions should not be considered applicable industry-wide, the methods us
Jan 1, 1960
-
Improvement In Rolled In Scale Index On High Productive MillsBy Juliano Braz Possatti, Arnaldo Carneiro Salles, Cleudson dos Santos Rego, Leandro de Lucas Mendes
The increase in customer demand for steels with higher surface requirements, associated with the need to increase ArcelorMittal Tubarão's HSM productivity, it was necessary the development of controls
Oct 10, 2019
-
Notes On Homestake Metallurgy (0d032729-1319-42b1-9c29-07b4969928f1)By G. H. Clevenger
Discussion of the paper of ALLAN J. CLARK presented at the San Francisco meeting, September 1915, and printed in Bulletin No. 103, July, 1905, pp. 1381 to 1398. G. H. CLEVENGER, Palo Alto, Cal.-Since
Jan 12, 1915
-
Some Recent Trends in Canadian Mineral ProcessingBy E. G. Joe
"Recent trends in Canadian mineral processing were reported in seven areas of interest covered by seventeen technical papers at the 1976 Annual Meeting of the Canadian Mineral Processors, held at Ener
Jan 1, 1976
-
Visualization of Dislocation Core Structure and Motion in Ordered AlloysBy Z. Y. Xie
The visualization techniques were employed for the analysis of computer simulation studies of dislocation core structure in ordered alloys. Atomistic computer simulation was used for the study of the
Jan 1, 1993
-
Drill and Blast Optimization at the Sparkhule Limestone QuarryBy Paul L. Matrin
This paper will discuss the recent and on-going drill and blast optimization measures at the Sparkhule Limestone Quarry, which have resulted in a 44% reduction of drill and blast unit costs per ton of
Jan 1, 2004
-
Present Developments In The Design Of Deep FoundationsBy Rolf Katzenbach
The principle questions related to the design of deep foundations especially in soft soils are the stability and the cost optimised settlement reduction to prevent possible damages and to minimise the
Jan 1, 2006
-
Discovery & Development Of The North Ore Zone Ontario Mine Park City District, Utah ? IntroductionBy . A. J. Erickson
The Park City District, one of three major mining districts in Utah, is located approximately 20 miles southeast of Salt Lake City on the eastern slope of the Wasatch Mountains. The district has been
Jan 1, 1970
-
The Underground Powerhouse And Tunnels For The Bad Creek Pumped Storage Project - A Case HistoryBy Richard E. Steffens
The underground portion of Duke Power Company's Bad Creek Pumped Storage Project in northwestern South Carolina consists of a powerhouse cavern (132 m. long, 23 m. wide, 50 m. high), 407 meters o
Jan 1, 1989
-
Mediation Of Construction Disputes - An Advanced Preparation Guide For Mediation Of The Complex Construction Case - IntroductionBy Alan Alhadeff
Why is mediation being hailed as the wave of the future? The high cost of putting on a trial, over-crowded court calendars and long trial delays have resulted in what prominent attorneys and leadi
Jan 1, 1990
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, LaBy Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992
-
Problem Of Non-Normality In Statistical Quality Control: A Case Study In A Surface MineBy B. Samanta
A quality characteristic analysed through construction of the Shewhart control chart is required to be normally distributed. In mining applications, this assumption is often violated as many quality c
Jan 1, 2004
-
Ferrous Physical Metallurgy ? Progress Reported in Studies of Hardenability, Graphitization, Embrittlement, and DilatometryBy Francis M. Walters
IN spite of the war and the preoccupation of many physical metallurgists with work on secret or confidential problems, definite progress was made during 1944 in our understanding of the behavior of st
Jan 1, 1945
-
Observational Method Using Real Time Surface Settlement Monitoring - The South Toulon Tunnel ProjectBy B. Caro Vargas
The Toulon South Tunnel in France is the second part of a project started 20 years ago. After the problems and delays suffered during the construction of the North Tunnel, due to a complex geologic co
Jan 1, 2012