Search Documents

Sort by

  • SAIMM
    A rock-engineering monitoring programme at West Driefontein gold mine

    By D. J. Adams, R. G. Gürtunca

    This paper describes the results obtained from a rock-engineering monitoring programme carried out at West Driefontein gold mine, where dewatered and classified tailings have been used as backfils for

    Jan 1, 1991

  • SME
    Disposal Of Sulphur Mine Effluents---How Freeport Sulphur Solved Its Effluent Problems ? Introduction

    By Paul D. Bybee

    The Freeport Sulphur Company operates four sulphur mines in the coastal marsh area-03 South Louisiana. Employing the Frasch process of mining, approximately 13-million gallons of water per day is heat

    Jan 1, 1959

  • SME
    Ice Pillars

    By D. L. Kuck

    Water ice pillars far underground mine roof support can be frozen and/or maintained and/or melted on demand. The system to do this consists of a refrigeration brine chiller, brine circulation system

    Jan 1, 1988

  • SAIMM
    Reconciliation of the Mining Value Chain – Mine to Design as a Critical Enabler for Optimal and Safe Extraction of the Mineral Reserve

    By M. Bester, R. Carey, T. Russell, J. van Heerden

    "In order to reach the goal of optimal and safe extraction of the mineral reserve, the mining industry is increasingly focusing on reconciliation across the mining value chain to ensure that the minin

    Jan 1, 2016

  • CIM
    Identification of Potential Energy Savings in Quebec Mine Ventilation Systems

    By Roger Lacroix

    Presentation outline Project definition Characterization of mine ventilation systems Strategies in place and results Detailed study (2 mines) Other potential energy savings Conclusions Next ste

    Feb 1, 2008

  • AIME
    Correlation Of Formations Of Huronian Group In Michigan

    By R. C. Allen

    ABOUT four years ago the writer proposed a revision of the correlation of the Huronian formations in Michigan, and noted the bearing of the question on the correlations of the Huronian rocks in Wiscon

    Jan 9, 1919

  • CIM
    Evaluation of Metallic Values from Ancient Slags

    By O. Kangal, G. Önal, G. Bulut, A. Gül

    The recovery of copper and cobalt from the ancient copper slags, located in Küre-Turkey, is investigated. Fayalitic type of ancient copper slags containing 1.41% Cu, 0.53% Co and 53.16% Fe were subjec

    Jan 1, 2004

  • NIOSH
    Abandoned Mine Lands Program TN #14 Soil Factors Affecting Surface Mine Reclamation - Objective

    Identity the difficulties of establishing vegetation on mining-related wastes resulting from adverse chemical, physical, and biological properties; describe the ecological and soil factors affecting t

    Jan 1, 1993

  • DFI
    The Micropile Network: Practice Precedes Theory

    By Gary M. Weinstein

    Micropiles have seen increasing use for foundation support and slope stabilization applications over the past half century. Most often designed and installed in groups of vertical or battered elements

    Jan 1, 2003

  • ISEE
    Environmental Effects of Marine Blasting in Canadian Game Rivers

    By A Lance McAnuff, Marcus V. van Bers, Andrew Curic

    During the summers of 1992 and 1993, blasting operations were carried out to effect the crossing of two of Canada's better known game rivers, the Nipigon and Winnipeg, in connection with the completio

    Jan 1, 1994

  • AUSIMM
    Upgrading of the Mechanical Braking System of a Large Blair Multi-Rope Rock Hoist

    By J Harmse

    This paper deals with the modernisation of the brakes on an electrically coupled Blair multi-rope hoist and covers the removal of the old calliper brakes and hydraulic control system, and its replacem

    Jan 1, 2005

  • AIME
    Employment (95d29bb5-2d0c-4b1e-ad08-d644259b8d26)

    POSITIONS VACANT The National Bureau of Standards needs men to fill metallurgical positions with salaries varying from $1200 to $2000, depending upon the training and experience of the candidate. E

    Jan 10, 1917

  • AIME
    Publications (09624aa2-351d-4f4b-83c1-c1dab0d84cca)

    The volumes of Transactions, which are published annually, contain the list of officers, rules, etc., the Proceedings, and the papers revised for final publication. (In this revision, after the prelim

    Jan 1, 1910

  • SME
    VIMS Telemetry System

    By C. S. Wageman

    Staying competitive in the highly aggressive Powder River Basin is a challenge facing all operators. Any advantage that a mine utilizes to improve productivity and reduce costs could mean the differen

    Jan 1, 1996

  • ISEE
    MINIMIZING RISK IN URBAN QUARRIES (Two Case Studies)

    By James Goldberg, Sally Zadra, Wiliam Reisz

    Early recognition and risk assessment is critical to sustaining a safe and productive blasting operation. While every blasting environment holds inherent risk, highwall blasting in highly congested ar

    Jan 1, 2008

  • AUSIMM
    Subsidence Associated With Mining At Mt. Lyell (cf0f232d-f5b5-4382-b423-238bcf9ce7bd)

    By Callaghan R. P

    Underground production from the low grade copper orebodies at Mount Lyell in recent years has involved surface subsidence of open cut areas. Relevant structural and lithological features of the geo

    Jan 1, 1980

  • CIM
    Looking for the .improbable needle in a haystack: the economics of base metal exploration in Canada

    By Brian W. Mackenzie

    "This paper briefly outlines the characteristics which should be considered in assessing the economics of mineral exploration, and illustrates such an assessment by using data from the Canadian base m

    Jan 1, 1981

  • NIOSH
    RI 2583 The Hazards Of Non Permissible Explosives

    By S. P. Howell, M. W. Von Bernewitz

    "Introduction. The first short—flame explosives were made in the United States during the year 1902, then the mount was 11,300 pounds. In 1902 they were designated ""permissible explosives"", and were

    Mar 1, 1924

  • SAIMM
    Mathematical And Computational Modelling Of The Dynamic Behaviour Of Direct Current Plasma Arcs - Synopsis

    By Q. G. Reynolds

    The problem of direct-current plasma arc behaviour, interaction, and dynamics is considered in the context of metallurgical DC arc furnace applications. Particular attention is paid to the transient f

    Jan 1, 2010

  • AIME
    Wilkes-Barre, Pa.Paper - Power Installation at Coverdale Mine

    By Charles M. Means

    A thoroughly modern coal-handling system has been installed at the Pittsburgh Terminal H. H. &. Coal Co.'s new No. 8 shaft, or Cover-dale mine, about 11 mi. (17.7 km.) from Pittsburgh on a spur o

    Jan 1, 1922