Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Flash Smelting At Magma Metals CompanyBy T. Gonzales
Magma Metals Company operates an Outokumpu Flash Furnace, four Peirce-Smith Converters and two Anode Casting Wheels supported by six Anode Vessels. Process gasses from the Flash Furnace and Converters
Jan 1, 1992
-
OFR-11-87 Improved Stopping, Door And Overcast Construction For Oil Shale MinesBy M. E. Adam
This report describes the construction and testing of large (30 ft high by 55 ft wide) stopping and overcast structures in an oil shale mine. The work was undertaken to develop construction techniques
Jan 1, 1986
-
Critical process design considerations from test work to operationsBy A Dennis, T Hunter, R Coleman
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin
Sep 11, 2017
-
RI 3328 Progress Reports - Metallurgical Division - 16. Ore-Testing Studies - Introduction And Summary (85a16109-951b-4d83-9f54-65ae42667c54)By C. W. Davis
During the fiscal year 1935-36, the Ore-Testing Section has been active in carrying out a program designed to attain the objectives that have been set up for it. For the purpose of standardizing im
Jan 1, 1937
-
A Novel Approach in Predicting Dump Truck Tyre Life in a Mine Based on Multilayer Perceptron Neural Network Optimised with Particle Swarm Optimisation - Mining, Metallurgy & Exploration (2024)By Yao Yevenyo Ziggah, Victor Amoako Temeng, Solomon Evans Kweku Koomson
Tyre hours/life deficit is a major operational challenge facing the mining industry which adversely affects materials production and costs. An accurate forecast of the tyre life is key in addressing t
Mar 11, 2024
-
IC 7974 Administration Of The Federal Coal-Mine Safety Act, 1952-59 ? SummaryBy James Westfield
A brief résumé follows of activities of the Division of Coal-Mine Inspection that have had a favorable effect on health, safety, and the reduction of injuries at coal mines: 1. The Federal Mine Sa
Jan 1, 1960
-
Sampling and Estimating Ore DepositsJan 1, 1925
-
IC 7446 Annual Report of Research and Technologic Work on Coal, Fiscal Year 1947By P. M. Ambrose, A. C. FtELDNER
This , the twelfth annual report of research and technologic work conducted by the Bureau of Mines on coal and coal products , summarizes the research and tests conducted frah July 1, 1946, to July 1,
Jan 1, 1948
-
Problems Encountered In The Design And Construction Of A New Aggregate Plant ? IntroductionBy Frederick C. Moore
This paper describes the original planning which actually resulted in the opening of a new aggregate plant located in central New York State. This plant, which is now named the Skaneateles Plant of Th
Jan 1, 1968
-
Scrap Processing and Recycling in the Nigerian Metallurgical IndustriesBy C. M. Iheagwara
An overview of the scope and ramifications of scrap recycling in the Nigerian metallurgical industries has been presented in this paper. The modern state-of-the-art processing techniques and the oper
Jan 1, 1992
-
-
Kennecott Utah Copper Smelter Modernization (127c52b5-4f83-464f-bcae-2f259e9fd980)By C. J. Newman
Prior to 1995, the smelting process at the Kennecott Utah Copper Corporation (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. In the consideration of expansion opportunities,
Jan 1, 1998
-
An Index Of Shale-Oil Patents - A Compilation Of United States And Foreign Patents Relating To The Treatment Of And Products From Shale Oil - IntroductionIn the spring of 1944 the Congress passed Public Law 290 (58 Stat. 190, 30 U. S. C. Sec. 321) "authorizing the construction and operation of demonstration plants to produce synthetic liquid fuels from
Jan 1, 1948
-
Microstructure and Wear Behavior of Remelted Stellite6 CladdingsBy Sandeep Singh Sandhu, Karanvir Singh Ghuman, Manjit Singh
"Cobalt based super alloy stellite 6 was weld cladded on AISI 304 L stainless steel using SMAW process in order to improve the wear resistance for tyre crusher blades. Microstructure characterization
Jan 1, 2017
-
Installation Techniques - 6.1 The Basic PhilosophyThe investment involved in any communication system represents a considerable sum. Even though it is desirable that the system work properly each and every time it is called into use, some failures ar
Jan 1, 1984
-
OFR-97-78 Design, Fabrication And Field Testing Of Remotely Operated Longwall Head/Tail SupportsBy Alfred Bellows
The objective of this contract is to design, build and demonstrate a support system to improve roof control in the entries of longwall mines. The objective of this phase has been the detailed design o
Jan 1, 1978
-
Pipeline Design for Natural Gas Transmission Using High Strength TechnologyBy A. Glover
As the demand for natural gas as a prime global energy source continues to grow, the search for new sources of the fuel spreads into geographical areas that are more remote from the marketplace. Along
Jan 1, 2005
-
OFR-112-85 Generalization Of Medical And Health Compliance Research To Coal Mine SafetyBy H. P. Cole
Methods for increasing compliance to medical and health regimens were reviewed along with similar research in industrial and mine safety. Principles abstracted from both areas suggest that compliance
Jan 1, 1985
-
Cement and Concrete Are Not What They Used to BeBy Raymond E. Davis
LET'S imagine we are at the Grand L Coulee Dam, where daily 15,000 barrels of low-heat Portland cement and 27,000 tons of processed aggregate in various sizes are mixed to produce 30,000 tons of
Jan 1, 1939
-
Lead Reduction In Ambient Air: Technical Feasibility And Cost Analysis At Domestic Primary Lead Smelters And RefineriesBy R. D. Smith
The Bureau of Mines (BOM) evaluated the technology, capital investment, and annual operating costs of emission control for further reductions of lead in ambient air at the East Helena, Montana, smelte
Jan 1, 1986