Search Documents

  • NIOSH
    OFR-116-78 Guidelines For Installation, Maintenance And Inspection Of Mine Telephone Systems

    By Roger G. Long

    This final report reviews installation, maintenance and inspection of mine pager telephone installations. A Technical Handbook was developed and distributed. Certain commercial telephone test equipmen

    Jan 1, 1975

  • CIM
    Distributed control at the Kidd Creek grinding plant. Part I: Control strategy design

    By A. Desbiens, R. del Villar

    "This two-part paper summarizes the design and implementation of a distributed PIbased control strategy installed at the B grinding circuit, at the Kidd Creek Division of Falconbridge Ltd. Part I deta

    Jan 1, 1997

  • AIME
    Of Mr. Chance's paper on a New Method for Working Deep Coal-Beds

    W. S. GRESLEY, Erie, Pa. (communication to the Secretary): A six-entry method of opening coal-mines is, or was a short time ago, practiced in the Connellsville coal-region; but Dr. Chance's metho

    Jan 1, 1901

  • SME
    Reliability analysis of hydraulic shovels

    By E. Siami-Irdemoosa, S. R. Dindarloo

    "Pareto analysis was used to investigate the failures database of a Hitachi EX1900 hydraulic shovel over one year of continuous operation. The hydraulic system and hydraulic links, hoses and piping we

    Jan 1, 2015

  • CIM
    Medium voltage switchgear and circuit breaker life extension

    By K. J. Boser

    "Medium Voltage (MV) metal clad switchgear is referred to as the voltage class from 2.4 kV to 38 kV. Technological advances in circuit breaker designs over the last 20 years have given rise to retrofi

    Jan 1, 1998

  • TMS
    Refractory Design and the Role of Numerical Simulation

    By D. R. Kreuzer

    The sulfide smelting industry is striving for up-scaling their operations by increasing the throughput and efficiencies of the furnaces. The physical phenomena related to refractory materials prevaili

  • AUSIMM
    A Comprehensive Dynamic Model of the Pierce-Smith Copper Converter: A First Step Towards Better Converter-Aisle Operation

    By I T. Cameron

    The commercial production of copper metal involves a sequence of purification stages. One step of this process eliminates bulk quantities of iron and sulphur from matte Cu2S(FeS to produce blister con

    Jan 1, 1998

  • CIM
    Some Mathematical and Analysis of Underground Model Guides 1n the Mine Stress Problems

    By Stefan Boshkov

    THE ADVENT of mining at great depth has brought to the fore the question of stresses around mine openings. The many-pronged attack on this problem is certified by the accelerated appearance, in the mi

    Jan 1, 1956

  • CIM
    The First Electrolytic Copper Refinery in Australia at Wallaroo, South Australia

    By B. McHenry, A. E. Wraith, P. J. Mackey

    The Wallaroo smelter on the Yorke Peninsula, South Australia commenced smelting operations in 1861 treating ores from the nearby Moonta and Kadina mines. The plant expanded and modernized on several o

    Jan 1, 2019

  • NIOSH
    OFR-76-76 Development Of Protective Canopy Concepts For Underground Rail Haulage - 1. Introduction

    By Hanns J. Billmayer

    This report, which covers the period from April 1975 to November 1975, describes the work performed in compliance with the requirements of Contract No. H0357091. The purpose of this contract was the d

    Jan 1, 1976

  • SME
    120-Year Design Lifetime of Plastics

    By Eckl, Martin, Stefan Lemke, Martin Londschien

    "Tunnels are built with a design life expectancy of over 100 years. One key component of such a design is the waterproofing system, which must reliably fulfil its function during the whole service lif

    Jan 1, 2016

  • AUSIMM
    Manufacturing of FeSiB high-temperature phase change material by silicothermic reduction

    By W Polkowski, M Tangstad, M Wallin, J Jiao

    Fe-26Si-9B (wt per cent) alloy has been identified as a potential high-temperature phase change material (PCM) due to its attractive properties, such as its high latent heat of fusion and low volumetr

    Jun 19, 2024

  • SAIMM
    Observer analysis of a dynamic tank-to-tank model to estimate concentrate flow-rate, J.D. le Roux, K. Hadler, J.J. Cilliers, and I.K. Craig

    By J. J. Cilliers, I. K. Craig, J. D. le Roux, K. Hadler

    An analysis of the state-observability characteristics of a dynamic tank-to-tank model of a flotation bank indicates that the concentrate-flow rate of each tank can be estimated from accurate measurem

    Jan 1, 2020

  • AUSIMM
    Results from a Preliminary Investigation of Particulate Emission During the Sintering of Iron Ore

    By J Manuel, A Trudu

    Regulations on the emission of particulates from sinter plant stacks are becoming increasingly stringent and reducing these emissions by improving gas cleaning systems is a significant cost to the sin

    Jan 1, 2002

  • CIM
    Metallurgical Coke in Canada

    By Wm. Snow, J. R. Wallace, E. P. Duchemin

    "GeneralA NOT INCONSIDERABLE proportion of the Canadian economy is dependent on the coal mining industry. This is particularly true of the eastern portion of Canada and especially so of the ( authors'

    Jan 1, 1955

  • CIM
    Start-Up and Operation of the Aga Mineração Refractory Gold Pressure Oxidation Plant

    By J. Dennett, M. Faris, M. Antonio, M. Collins, N. Tuffrey, R. Ellenwood, V. Reddy

    "In January 2012, AngloGold Ashanti Córrego do Sítio Mineração, with assistance from Sherritt International Corporation, commissioned a new autoclave for pressure oxidation of refractory gold concentr

    Jan 1, 2017

  • NIOSH
    RI 3662 Lamallar Grading of Powdered Mica

    By Oliver C. Ralston, Foster Fraas

    "INTRODUCTION The predominant characteristic of powdered mica is the thin -plate shape of the particulars, and the thinner the plates, the more enhanced is this characteristic. Consequently, it is fre

    Sep 1, 1942

  • AUSIMM
    Laboratory Investigations Leading to the Design of the King Island Scheelite Company's New Concentrator

    CONTENTSThe significance of values givenINTRODUCTIONTHE ORE1. DATA SECURED FROM THE MILLING PLANT AS OPERATING BETWEEN 1938 AND 1942(a) Mill Recoveries(b) Mill Flow Sheet(c) Scheelite-Garnet Associati

    Jan 1, 1944

  • RMCMI
    Discussion Of Mr. Trik's Paper

    PRESIDENT MARKS: This is a matter, I think, in which we are all very much interested, and I know We will have considerable discussion on the subject. MR. GIBSON: Wouldn't it be a fact, Mr. Tric

    Jan 1, 1926

  • SME
    Evaluation of Large Tunnels in Poor Ground—Alternative Tunnel Concepts for the Transbay Downtown Rail Extension Project

    By David Hopkins, Steve Klein, Bradford Townsend, Ed Sum, Derek Penrice

    INTRODUCTION The Transbay-Caltrain Downtown Extension (DTX) Project involves the construction of an approximately 1.5-mile rail line that will extend Caltrain commuter service and the future Calif

    Jan 1, 2007