Search Documents

  • NIOSH
    OFR-11(2)-82 Recontouring Of Steep-Slope Abandoned Contour Mines - Volume II - Appendices

    By Daniel I. Carey

    Current and potential dragline reclamation usage was evaluated for the U.S. coalfields based on data gathered and analyzed during field surveys, literature reviews and contacts with manufacturers. It

    Jan 1, 1981

  • SME
    Blue Flame Burner Report

    By R. R. Givler

    Since the 1860's the good ole days, oil has been nozzle fed to burners under pressure atomizing the oil into droplets -- 1960's has produced vaporized oil that burns oil with the flame color

    Jan 1, 1975

  • SAIMM
    Stability analysis of a free-standing backfill wall and a predictive equation for estimating the required strength of a backfill material – a numerical modelling approach

    By S. Sekhar, S. Bhargava, A. K. Godugu, J. L. Porathur

    Cemented backfilling has enabled underground hard rock mines to extract orebodies more safely with improved ore recovery. It is important to estimate the minimum required strength parameters for a bac

    May 2, 2022

  • IOM3
    Kinetics of pyrite decomposition in a fluidized bed: part 1: removal of ambient sulphur vapour is rate-limiting; part 2: influence of transfer processes in the bed

    By M. D. Gibbs, T. N. Smith, B. Verbaan

    When heated in the absence of oxygen, pyrite from refractory gold concentrates decomposes endothermically to pyrrhotite, releasing sulphur. The decomposition starts at the particle surface and progres

    Jun 19, 1905

  • SME
    Control Of Crushing Circuits Will Reduce Capital And Operating Costs

    By Malcolm D. Flavel

    As indicated in the introduction to this paper, it is a sequel to that which I gave to the last annual meeting in Atlanta in march. This paper goes further into aspects of crushing and screening, prim

    Jan 1, 1977

  • DFI
    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • SME
    Use of Subsidence to Estimate Secondary Extraction of Trona (c58fbfc6-051e-430f-a2c4-f6e817c31939)

    By P. W. Conrad, C. Todd, N. A. Degerstrom, N. West, R. Kramer

    "Surface subsidence caused by underground room-and-pillar mining operations and by solution mining operations have been studied separately but never in combination. In 2008, FMC Minerals began using s

    Jan 4, 2018

  • AUSIMM
    The Role of Government in the Northern Territory Mining Industry

    By C Berglin

    Is the Northern Territory different? Certainly it is more remote, has less people and relies more heavily on two or three industries for its survival. On the other hand, its mining industry is govern

    Jan 1, 1994

  • AIME
    Superlatives and the Superflous

    By T. A. Rickard

    The purposes of composition are various; one purpose, for instance, is to make a record for the writer's own use, as in a diary. That does not involve responsibility to others. There is also the

    Jan 1, 1931

  • CIM
    Mining in a Lateral Stress Field at White Pine

    By Jack Parker

    "The original design of mine openings and pillars at White Pine was based upon traditional assumptions; i.e., that the principal load is due to the weight of overburden, and that horizontal stresses a

    Jan 1, 1966

  • TMS
    Production of Structural Products from Copper Mining Tailings

    By Thomas Weyand, Thomas Claridge, Dale Nickels

    "This paper addresses the initial results of a project to evaluate the suitability of copper mining tailings as raw material for the production of structural products using PMET’s patented technology.

    Jan 1, 2008

  • SME
    The "Asbestos" Controversy (2f3df2d7-de6d-4465-be83-7a7ca54c7132)

    By Earl G. Hoover

    For most geologists and miners the term "asbestos" refers to a group of highly fibrous silicate minerals that readily separate into long, thin, strong fibers of sufficient flexibility to be woven, are

    Jan 1, 1978

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming (3f914add-ff63-4567-994a-ce69fb049d25)

    By G. McIsaac

    "This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore

    Jan 1, 2005

  • CIM
    Long-term planning of an underground mine using mixed-integer linear programming

    By G. McIsaac

    This paper discusses the formulation of a linear program with the objective of maximizing the cash flow of the long-term plan of an underground operation. A mine is split into eleven independent ore z

    Sep 1, 2005

  • CIM
    Evaluation of Groundwater Leakage into a Dam Foundation Drainage Tunnel

    By J. M. Hong, H. K. Zheng, R. Hu, C. B. Zhou

    The Jinping-I double curvature arch dam, located in the middle reach of the Yalong River and with a maximum height of 305 m, is the world highest dam of the same type that has been completed. Since th

    Jan 1, 2015

  • TMS
    Simulation of Fatigue Stress Life (S-N) Diagrams for Ti-6Al-4V Alloy by Application of Artificial Neural Network

    By S. Malinov, J. J. McKeown, W. Sha, S. McShane

    "A model is developed for prediction of fatigue stress life S-N diagrams for Ti-6Al-4V alloy at different conditions, using Artificial Neural Network (ANN). Different factors which have influence on t

    Jan 1, 2001

  • NIOSH
    RI 2450 Petroleum Engineering in the Skull Creek Oil Pool, Northeastern Osage County, Okla

    By T. E. Swigart

    In connection with experimental work by the Bureau of Mines to determine effects of back pressure . on oil wells * , data were compiled on the engineering conditions in the oil field selected , in ord

    Feb 1, 1923

  • CIM
    Developments in the Hydrometallurgical Processing of Nickel Laterites

    By F. McCarthy, W. Zhang, R. McDonald

    "The processing of nickel laterites has been a topic of major interest at CSIRO for almost twenty years. During this period CSIRO has collaborated with other researchers and industry in developing a b

    Jan 1, 2017

  • SME
    Discussion - Computer-aided schedule optimization in room-and-pillar and longwall operations - by P.K. Chatterjee, G. Johnston, and S. Holguin Technical Papers, MINING ENGINEERING, Vol. 39, No. 6 June 1987, pp. 433-436

    By M. Gershon

    The article is an excellent one, providing a basis for the conduct of the major tasks in underground mine planning and scheduling. I object to only one word. Since that word is featured in the title,

    Jan 1, 1987