Search Documents

  • AUSIMM
    Electrowinning of Lead Directly From Galena

    A description is given of preliminary work done to identify the problems inherent in electrochemical oxidation of metal sulphides, and particularly in the use of powder compacts as anodes in electroly

    Jan 1, 1972

  • AIME
    Minerals Beneficiation - Beneficiation of Rock Salt at the Detroit Mine (Mining Engineering, Aug 1960, pg 918)

    By R. J. Brison, W. C. Bleimeister

    The International Salt Company has long been interested in finding an efficient process for the removal of impurities from rock salt, and particularly from the rock salt produced at the Detroit mine.

    Jan 1, 1961

  • SME
    Application Of Impact Resistant Steel Sets For Underground Roof Fall Rehabilitation

    By J. C. Stankus

    To protect mine personnel and moving equipment at underground roof fall areas, mine operators typically install steel sets, which are covered with wooden blocks and backfilled with an expanding type c

    Jan 1, 2011

  • AUSIMM
    Precious Metal Mineralisation Associated with the Cretaceous Paparoa Metamorphic Core Complex, New Zealand

    Reconnaissance geochemical exploration in the vicinity of low angle detachment faults which bound the core of the Paparoa metamorphic core complex yielded Au up to 14 ppm, with 35% of greywacke, grani

    Jan 1, 1995

  • CIM
    Mine reconciliation ? for better or worse!

    By Rayleen Riske

    Why do we look for better reconciliation when times get tough? Why wait? Mine reconciliation should be a priority throughout the good times too. In fact, with good reconciliation, those good times are

    May 1, 2010

  • SAIMM
    The Application Of Numerical Modelling To The Design Of Electric Furnaces

    By T. Plikas, L. H. Gunnewiek, L. Oshinowo

    Electric furnace smelting is one of the principal unit operations for ferroalloy production, and increased process intensity, improved availability, minimal maintenance and a lon

    Jan 1, 2004

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Optimization of the Piled-Raft Foundations Considering the Soil-Pile-Raft Interaction

    By Hessam Yazdani

    In comparison to the conventional piled foundations, the piled-raft foundations provide a more economical solution to support high-rise buildings constructed on soft soils. In this type of foundations

    Jan 1, 2013

  • SME
    Geochemical Profiling Of A Sulfide Leaching Operation: A Case Study

    By S. M. Flaherty, R. E. Scheffel, A. Guzman

    Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me

    Jan 1, 2006

  • AUSIMM
    The Industrial Synergy Between Mineral Sands and Saline Waters of the Murray Basin, Australia

    By G Sparrow

    The Murray Basin is being heralded as the next major mineral sands province in Australia. Already exploration programs have delineated extensive commercial deposits and several companies are progressi

    Jan 1, 2001

  • NIOSH
    IC 6399 Construction Of The Wachusett-Coldbrook Tunnels ? Introduction

    By Douglas C. Corner

    This is the first of a series of papers dealing with modern tunnel-driving methods, compiled in accordance with an outline prepared by engineers of the United States Bureau of Mines and to be publishe

    Jan 1, 1931

  • NIOSH
    Reel-Mounted Hose And Cable For Loader - Objective

    Reduce accidents associated with handling of the electrical trailing cable and the water hose on mining equipment. Approach Two reels were mounted on a loading machine to store and release the

    Jan 1, 1978

  • CIM
    Rock Drilling with Tungsten Carbide Bits

    By J. H. Fulton

    Summary Considerable test work has been done with the detachable type of carbide bit. In general, these bits improved drilling operations, but at a bit cost .greater than was compensated for by the

    Jan 1, 1950

  • IMPC
    Modeling floatability components for liberated and composite particles

    By Trevor Saldanha, Stephen Grano

    A key uncertainty in flotation modelling is determining, a priori, the proportion of each mineral which will develop a certain rate constant for different feeds of variable liberation and hydrophobici

    Jan 1, 2014

  • SME
    Exploration Sampling: Key to Better Mining Projects

    By B. G. Stone

    "INTRODUCTION “Sampling is the process of taking a small portion of an article such that the consistency of the portion shall be representative of the whole” (Baxter and Parks, 1939) “An orebody is a

    Jan 1, 2015

  • TMS
    Membrane Technology For Treatment Of Wastes Containing Dissolved Metals

    By Peter K. Eriksson

    Nanofiltration is very efficient in separating heavy metals from water solutions, even if they contain strong acids. Desalination System, Inc., has many years of experience in this area, and this pape

    Jan 1, 1996

  • SME
    Exploration sampling; The key to better mining projects

    By Barton G. Stone

    "Sampling is the process of taking a small portion of an article such that the consistency of the portion shall be representative of the whole," (Baxter and Parks, 1939)."An orebody is a mixture of mi

    Jan 1, 2014

  • ISEE
    Shock Impedance Method Applied to Detonation Pressure Measurements

    By Santiago Gómez, Pablo Segarra, José A. Sanchidrián

    In-hole detonation pressure measurements are unusual in the production environment of a mining operation, partly owing to the hostile conditions to which recording equipment and pertinent probes must

    Feb 6, 2023

  • NIOSH
    RI 8916 - Delayed Blasting Tests to Improve Highwall Stability - A Progress Report

    By Virgil J. Stachura

    The Bureau of Mines conducted a series of delayed blasting experiments at a West Virginia contour coal mine that resulted in smoother highwalls. The 17; were smoother due to reduced overbreak and inhe

    Jan 1, 1984

  • ISEE
    Electronic Detonator and Modern Non-Electric Shocktube Detonator Accuracy

    By Joshua Hoffman, William Chad Wedding, Braden Lusk

    The emergence of electronic detonators as viable products for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to tim

    Jan 1, 2011