Search Documents

  • SME
    Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021

    By Gino Vogt

    In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations

    Jun 13, 2021

  • SME
    Successful Completion of Major Large-Scale Tunnel Infrastructure Projects in the Southern Hemisphere with XXL Machines

    By Karin Bäppler

    "When considering large-scale infrastructure projects worldwide special attention has to be paid to the large diameter tunnel construction projects that were successfully completed in the Southern Hem

    Jan 1, 2016

  • NIOSH
    The Mineral Industries Of Europe And The U.S.S.R. - Introduction

    By Michel C. Frippel

    This section of the Minerals Yearbook reviews the minerals industries of 29 countries: the 12 nations of the European Community (Belgium, France, the Federal Republic of Germany (FRG), Italy, Greece,

    Jan 1, 1992

  • DFI
    Reliability Of Pile Prediction Methods - Summary

    By M. T. Davisson

    Pile compression load capacity prediction methods are divided into four categories for purposes of discussing their reliability compared to static load test results. The categories considered are: 1)

    Jan 1, 1991

  • NIOSH
    IC 8697 Construction-Mineral Aggregate Availabilty In The Baltimore, Md., Metropolitan Area

    By John R. Bitler

    The Bureau of Mines conducted this study to provide information concerning the availability of and the demand for construction-mineral aggregates in the Baltimore, Md., Standard Metropolitan Statistic

    Jan 1, 1975

  • AIME
    Rejuvenating European Mining

    By Charles Will Wright

    MINERAL production in almost all European countries suffered a sharp setback because of the war. Plants were damaged, transportation facilities disrupted, and labor dispersed and demoralized. Since th

    Jan 1, 1948

  • NIOSH
    OFR-72-82 Research Study Of Coal Mine Rock Reinforcement

    By T. A. Lang

    Concepts and equations have been developed to quantitatively determine the stability of a rock bolted coal mine roof as a structural (beam-arch) member consisting of reinforced rock units. The equatio

    Jan 1, 1981

  • CIM
    Applying a Customer-Based Approach at Vale’s Clarabelle Mill

    By A. Taylor, J. Shelegey, H. Sullivan, J. Doucet

    "Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in

    Jan 1, 2012

  • SME
    OMSHR’s Effort on the Next-Generation Closed-Circuit Mine Escape Respirators

    By R. Fernando

    "The Office of Mine Safety and Health Research (NIOSH-OMSHR) currently is leading an effort in the development of the next-generation self-escape apparatus as part of the research imperative directed

    Jan 1, 2016

  • SME
    Satisfying information requirements on mineral extraction by applying Earth Observation methods: First results from EO-MINERS

    By W. E. Falck, A. Usubiaga, J. Spangenberg, P. Schepelmann, S. Šolar, D. Wittmer, F. Blanchard

    The extraction and processing of mineral resources may be accompanied by environmental impacts. In spite of technological advancements, the enormous increase in production volumes within the last deca

    Jan 1, 2011

  • NIOSH
    RI 3417 Survey Of Crude Oil In Storage, 1936-1937 ? Introduction (2ee0653e-e7a0-4640-aa67-9d2d1f8c7334)

    Early in 1936 the Interstate Oil Compact Commission and other groups interested in forecasts of demand for petroleum requested the Bureau of Mines to make a physical inventory of crude-oil stocks in t

    Jan 1, 1938

  • NIOSH
    OFR-96-76 Evaluation Of Speech Processing Systems - Evaluation Of Electronic/Active Hearing Protectors For Use In Underground Coal Mines

    By Paul L. Michael

    This report presents a discussion of perforance parameters for electronic or active hearing protectors that will meet the needs of underground coal miners. This information is incorporated into a prop

    Jan 1, 1976

  • TMS
    Morphology Change Of AlN With Respect To Starting Materials In SHS Process

    By Jae R. Lee

    Keywords: Self-propagating high temperature synthesis, AlN, Powder synthesis The particle size and shape effects of starting raw powders on the synthesis of aluminum nitride by self-propagating hig

    Jan 1, 2005

  • NIOSH
    IC 6302 Mining Laws of Nicaragua

    By A. D. Garman

    This paper presents one of a series of digests of foreign mining legislation and court decisions which is being prepared in advance of a general report relative to the right of American citizens to ex

    Jul 1, 1930

  • ISEE
    Shaft Sinking: Drill and Blast & Vertical Shaft Sinking Machines

    By Sam Ammermann, William Heasley

    "The mining industry is on an ever accelerating path to complete mechanization. As companiesutilize more sophisticated and efficient methods of blasting, a more thorough look should begiven to the pro

    Jan 1, 2016

  • IIMP
    E-Catastro Minero

    By Henry Luna

    El Instituto Nacional de Concesiones y Catastro Minero – (INACC ) busca mejorar el acceso de la información sobre los derechos mineros y áreas restringidas de la actividad minera del país a los usuari

    Sep 19, 2006

  • SME
    Some Aspects of the Limestone Industry in Michigan

    By Carl G. Hogberg

    To the casual observer there is probably no simpler appearing operation in the mineral industry than a limestone quarry. It might seem that the entire operation - from the drilling, blasting, and load

    Jan 1, 1962

  • SME
    Optimizing the "Resource-To-Market" Supply Chain by Embracing Variability

    By D. Spitty

    Mining companies often have many disparate systems and repositories of data in their organization for planning and scheduling outbound mining supply chains. To optimize ore quality, throughput, transp

    Feb 23, 2014

  • SME
    Tunnel Boring at Stillwater’s East Boulder Project

    By Clayr Alexander

    Stillwater Mining Co. (SMC) is engaged in developing, extracting, processing and refining palladium, platinum and associated metals (PGM)from the J-M Reef. This geological formation is located in Sti

    Jan 1, 1999

  • SME
    Oversize Reduction Project At The Iron Ore Company Of Canada (SME Annual Meeting)

    By R. Pinksen

    The IOC Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1.0 m x 1.0 m x 1.0 m; 39 inches x 39 inches x 39 inches) being produced and its subsequen

    Jan 1, 2011