Search Documents

  • SAIMM
    Improving spatial mine-to-plan compliance at an open pit mine through enhanced short-term mine planning

    By T. J. Otto, C. H. Cloete, T. Mkhatshwa, T. J. van Heerden

    The value realised by an open pit mine depends on the quality and integrity of the mine planning process as well as the level of execution against these mine plans. When managing the execution against

    May 27, 2025

  • SAIMM
    Gaseous Reduction Of Isasmelt Lead Slag And Lead Blast Furnace Sinters

    By Baojun Zhao

    Primary lead production using the lead blast furnace in conventional practice is carried out using sinter feed. At YMG, China, the sinter plant has been replaced with a lead ISASMELT furnace. The ISAS

    Jan 1, 2008

  • AIME
    Part IV – April 1969 - Papers - Radiation Transfer Across a Spherical Pore in a Linear Temperature Gradient

    By G. P. Marino

    The "conductivity ", Kr, of a spherical void in a linear temperature gradient due to radiation is calculated by integration of the general expression for diffuse radiation between two gray surfaces o

    Jan 1, 1970

  • CIM
    Comparative economics of bacterial oxidation and roasting as a pre-treatment step for gold recovery from an auriferous pyrite concentrate

    By S. R. Gilbert, C. O. Bounds, R. R. Ice

    "Many ores are upgraded to produce auriferous sulphide concentrates (principally pyrite) which are not amenable to direct cyanidation. Often these refractory gold-bearing concentrates contain undesira

    Jan 1, 1988

  • CIM
    Operation of a High-Density Tailings Thickener

    By Ernie Doell, Trung Nguyen

    "In early 1995 Cluff Mining commissioned a newly constructed high density tailings thickener at its Cluff Lake uranium mill. The 85 ft diameter high density thickener is one of the first of its kind i

    Jan 1, 1996

  • SME
    Cold Weather Response Of Steel (72-F-326)

    By George J. Thompson

    Almost all persons connected with mining industry have had an exasperating experience like the following: 'On a cold and frosty morning in mid-January, you find yourself quite happy with the worl

    Jan 1, 1972

  • NIOSH
    RI 4052 Buck Creek Corundum, Clay County, NC

    By T. J. Ballard

    "INTRODUCTION The Buck. Creek corundum area of Clay County, North Carolina, includes one of the largest single masses of peridotite outcrops in the whole Appalachian Range and has been described by Pr

    Apr 1, 1947

  • NIOSH
    RI 3177 Migration Of Injected Gas Through Oil And Gas Sands Of California ? Introduction

    By H. C. Miller

    The success of any project in which gas is injected into oil-producing sands to increase the current rate or the economic ultimate production of oil or in which surplus gas from oil producing operatio

    Jan 1, 1932

  • AUSIMM
    Productivity improvement through collaborative shift planning and tracking

    By E Deucker, A White

    Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their

    Oct 16, 2017

  • SME
    Mine Audits: Rights, Obligations And Pitfalls - Introduction

    By M. T. Webster

    Views about the proper aim of public policy are, of course, matters of perspective and debate. Regardless of perspective, one would assume some consensus around the view that public policy ought to e

    Jan 1, 2012

  • SME
    The Geology Of Georgia Kaolin Deposits--Progress And Problems

    By Sam H. Patterson

    This paper is concerned primarily with the kaolin deposits extending northwestward from Macon, Ga., which is in the western part of the Irwinton district (fig. 1). These deposits are in a belt of kaol

    Jan 1, 1977

  • NIOSH
    OFR-11(1)-82 Recontouring Of Steep-Slope Abandoned Contour Mines - Volume I - Summary

    By Daniel I. Carey

    Current and potential dragline reclamation usage was evaluated for the U.S. coalfields based on data gathered and analyzed during field surveys, literature reviews and contacts with manufacturers. It

    Jan 1, 1981

  • AUSIMM
    Gas in Face Coal

    The study of gas emitted from face coal samples at the coal face is part of an investigation of instantaneous outbursts of coal and gas. Normally, seam gas essentially comprises methane of which the o

    Jan 1, 1962

  • SME
    Exploration sampling; The key to better mining projects

    By Barton G. Stone

    "Sampling is the process of taking a small portion of an article such that the consistency of the portion shall be representative of the whole," (Baxter and Parks, 1939)."An orebody is a mixture of mi

    Jan 1, 2014

  • AUSIMM
    Union Reefs: A Project Assessment and Development Case History

    By Giles D, Wegmann D

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • NIOSH
    OFR-48-83 System To Prevent Clogging Of Gas Sampling Tubes

    By Kyle W. Charlton

    The Bureau of Mines utilizes special testing methods for the analysis of underground mine atmospheres for use during or after mine disasters and fires. These methods depend upon drawing sample gas to

    Jan 1, 1981

  • IOM3
    Comparison of indicator and ordinary kriging in assessment of in-situ coal quality in a Turkish mine

    By A. E. Tercan, D. Mamurekli

    Ordinary kriging on the assumption of a gaussian error distribution and indicator kriging were used to derive the probability that a given calorific value would or would not be exceeded by coal from a

    Jun 19, 1905

  • NIOSH
    The Mineral Industry Of The Islands Of The Caribbean - Bahamas (27d294c2-549d-4db9-bcb1-14d702f0e03f)

    The Bahamas Oil Refining Co. (BORCO) refinery in Freeport continued to operate at less than half its full 500,000-barrel-per-day capacity. Although owned through subsidiaries by the Carey Energy Corp

    Jan 1, 1981

  • SME
    Optimizing The Air-Sparged Hydrocyclone For Fine Coal Cleaning: A Progress Report

    By Glenn A. Shirey, Robert D. Stoessner, S. Gopalakrishnan

    Under a contract awarded by the U.S. DOE-PETC, the Pennsylvania Electric Company and New York. State Electric and Gas Corporation are conducting a test program to evaluate and optimize the performance

    Jan 1, 1989

  • CIM
    Analysis of the failure of a large hangingwall wedge: Kidd Mining Division, Falconbridge, Ltd.

    By M. Board, R. Pakalnis, S. Seldon, R. Brummer

    The Kidd operation mines roughly 10 000 tpd of copper and zinc ore from underground and employs about 700 personnel. In the late summer and fall of 1997, major movements in the proximity of the east w

    Jan 1, 2000