Search Documents

  • AUSIMM
    The Application of High Energy Primers to Underground Development

    By D L. Kennedy

    It has always been a challenge to accelerate the underground development progress by increasing the advance rate of each development round. Surveys have shown that most of the development rounds have

    Jan 1, 1999

  • TMS
    TEM and SIMS Study of Duplex Structure of Anodic Films on Aluminum

    By Noboru Masuko, Sachiko Ono

    "The structure and composition of anodic films formed on aluminum in a borate solution have been investigated by using TEM and SIMS with respect to the effect of current density and electrolyte temper

    Jan 1, 2000

  • NIOSH
    OFR-25(1)-74 Improved Sensors And Fire Control Systems For Mining Equipment - Phase I Report - Executive Summary - I. Introduction

    Phase I of U.S. Bureau of Mines contract H01220S3, "Improved Sensors and Fire Control Systems for Mining Equipment, II was an investigative effort involving study of the fire problem and preliminary d

    Jan 1, 1972

  • AIME
    Logging and Log Interpretation - Departure Curves for the Self-Potential Log

    By A. E. Worthington, R. F. Meldau

    An analog computer study was made of the reduction of the magnitude of the SP by formation geometry and resistivity effects. Practical field .situations were studied. The analog data were converted to

  • NIOSH
    Local Earthquake Tomography for Imaging Mining-Induced Changes Within the Overburden above a Longwall Mine (5a876fc9-aed5-46e9-8c14-316696a99809)

    By E. C. Westman

    Three-dimensional velocity tomograms were generated on a daily basis to image mining-induced changes to the overburden above a longwall mine. The hypothesis was that a coherent redistribution of seis

    Jan 1, 2008

  • NIOSH
    RI 3975 Exploration of Reward (Vekol) Zinc Deposit, Pinal, AZ

    By P. S. Haury, Thomas C. Denton

    "INTRODUCTION AND RESUMEThe Reward zinc property was one of the first selected for exploration by the Bureau of Mines at time when zinc supplies for war production were very short. Preliminary examin

    Nov 1, 1946

  • CIM
    A Continuum Damage Modeling Approach for Simulation of Hydraulic Fractures

    By A. Dahi Taleghani, A. Shojaei

    Continuum damage mechanics (CDM) of rocks is studied together with their elastic and plastic behaviors to develop simulation tools for hydraulic fracturing jobs in naturally fractured formations. The

    Jan 1, 2015

  • AIME
    Papers - Milling Practice - Concentrating Operations of the Mahoning Mining Company, Rosiclare, Illinois (T. P. 2040, Min. Tech., Sept. 1946)

    By Walter E. Duncan

    The ores treated at the concentrating plant of the Mahoning Mining Co. at Rosiclare, III., come largely from the blanket replacement deposits of the northeastern part of Hardin County, Illinois, and c

    Jan 1, 1947

  • AIME
    Papers - Milling Practice - Concentrating Operations of the Mahoning Mining Company, Rosiclare, Illinois (T. P. 2040, Min. Tech., Sept. 1946)

    By Walter E. Duncan

    The ores treated at the concentrating plant of the Mahoning Mining Co. at Rosiclare, III., come largely from the blanket replacement deposits of the northeastern part of Hardin County, Illinois, and c

    Jan 1, 1947

  • CIM
    The Woodstock, N.B., Iron.-Manganese Deposits

    By K. O. J. Sidwell

    STRATMAT LIMITED, through its subsidiary, the Strategic Manganese Corporation, controls two adjoining iron-manganese properties five miles west of Woodstock, New Brunswick. One is a staked property of

    Jan 1, 1957

  • AIME
    Minerals Beneficiation - The System Fe-Mn-SiO2-O2 and Its Application to the Beneficiation of Manganiferous Iron Ores by Reduction Roasting

    By G. L. Tufford, R. L. Bleifuss

    Low-grade manganiferous iron ores of Minnesota's Cuyuna Range, in general, do not respond to conventional mineral dressing techniques because of their fine-grained texture. Reducing these ores to

    Jan 1, 1969

  • ISEE
    Innovative mining method, related blasting system and quality assurance for large underground crusher excavation Freeport DOZ Mine, West Papua Indonesia

    By Rudi Toba

    Several areas at the DOZ haulage were observed for the crusher’s location. Initially the new crusher designed position was west of the crusher 1, but due to concerns of the mine crack zone (deep MLZ)

    Jan 1, 2007

  • NIOSH
    RI 3797 Microseismic Method of Predicting Rock Failure in Underground Mining - Part 1. - General Method

    By Wilber Duvall, Leonard Obert

    "INTRODUCTION This report is the first of four to be presented on the microseismic method 4/ of predicting rock failure in underground mining. The application of the microseismic method to one specifi

    Feb 1, 1945

  • TMS
    Analysis Of Turbulence At The Metal/Slag Interface In The Meniscus Region Of A Continuous Casting Mold Through Physical And Mathematical Modelling

    By Itavahn Alves da Silva, Jose Dimas de Arruda, Amanda Aparecida Fátima Arruda, da Silva de Souza, Carlos Antonio da Silva, Varadarajan Seshadri, Samuel

    The knowledge of the flow field inside a continuous casting mold is essential to improve operational efficiency of the process and also to achieve better inclusion control. Physical modeling, PIV tech

    Jan 1, 2016

  • AUSIMM
    Brave New World Autonomous Mining Systems

    By M Lynch, B White

    The historic city of Charters Towers in North Queensland is underlain by an extensive labyrinth of old mine workings in a large number of flat lying, subparallel, main and cross-cutting cross reefs ex

    Sep 26, 2013

  • CIM
    Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage Forces

    By R. E. Barbosa

    Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present

    May 1, 2009

  • IMPC
    Interpreting low energy attrition behaviour in a pilot mill using numerical modelling

    By Nirmal Weerasekara, Malcolm Powell, Mohsen Yahyaei

    "The conditions under which rocks become superficially damaged during the grinding process are not well understood. The main purpose of the work presented here is to understand how superficial breakag

    Jan 1, 2014

  • ABM
    Disponibilidade Do Desgaseificador A Vácuo Rh

    By André Luiz Monteiro Martins

    O objetivo do projeto foi otimizar a disponibilidade e o tempo de utilização do equipamento responsável pelo refino secundário de aço líquido da CSN, o Desgaseificador a vácuo RH. Esta otimização ocor

    Aug 16, 2017

  • CIM
    Impact of Operating Conditions on Emissions from Mine Haul Trucks Operating in the Oil Sands Region of Alberta, Canada

    By R. J. Schafer-Frentz, T. G. Joseph, M. Curley

    "Greenhouse gas emissions—specifically of carbon dioxide—are a concern in Canada, where industrial sectors such as mining are stringently regulated for carbon release. Cumulative emissions are positiv

    Jan 1, 2019

  • SAIMM
    Determination of Value at Risk for Long-term Production Planning in Open Pit Mines in the Presence of Price Uncertainty

    By M. Rahmanpour

    "Mine planning is a multidisciplinary procedure that aims to guarantee the profitability of a mining operation in changing and uncertain conditions. Mine plans are normally classified as long-term, in

    Jan 1, 2016