Search Documents

  • SME
    Managing Cyclones: A Valuable Asset the Copper Mountain Case Study (44830731-0f7b-4606-82e1-1422dec82d1f)

    By M. Westendorf, T. Banerjee, S. Kaushik, D. Tinney

    "The Copper Mountain Mine is located in Princeton British Columbia, Canada and produces 80 – 90 million pounds of copper annually, as well as gold and silver by-products. The ore processing plant has

    Jan 1, 2015

  • IMPC
    Design, Modelling and Control of Flotation Equipments

    By Juan B. Yianatos

    "After almost 100 years, since the first commercial application began in Australia, flotation has shown an extraordinary growth and nearly 2 billion tons of ore per year are presently treated by flota

    Jan 1, 2003

  • SAIMM
    Behavior Of Continuous Casting Fluxes During Heating And Cooling

    By J. Madias, E. Benavidez, E. Brandaleze, L. Castella

    Knowledge of the physical and chemical properties as well as the behaviour of the mould fluxes during melting, important in order to improve continuous casting operations. Lubrication and control of h

    Jan 1, 2004

  • ABM
    Cost Reduction And Better Quality Control By On-line Roughness Measurement During Continuous Strip Processing - Sorm3plus

    By Anderson Pereira

    SORM 3plus (SORM = Superfast Optical Roughness Measurement) is a system enabling online measurement of roughness parameters during continuous strip processing. Increased requirements for new materials

    Oct 8, 2019

  • AUSIMM
    Design of Equipment for Dynamic Burden Measurements

    By D Johansson, A Nordqvist, D Mihaylov, N Petropoulos, M Wimmer

    The flowability of the caved rock masses in the sublevel caving (SLC) mining method is of great importance. During the blasting process of a SLC-ring, the caved rock mass in front of the ring is compa

    Aug 24, 2015

  • AUSIMM
    Maximising Productivity through Big Data, Simulation and Predictive Analytics

    By M T. Grigoleit, M S. Schneider

    The iron ore industry in Australia has, in recent years, experienced an unprecedented growth phase. But now that major expansions are moving into the operation phase, new challenges have emerged. Wher

    Jul 13, 2015

  • TMS
    Quantitative Mineralogical Balances for Major and Trace Elements in Samples from Agnico-Eagle Mines Limited, Quebec, Canada

    By William Petruk, J. H. Gilles Laflamme, Jean Robitaille, Louis J. Cabri

    "A quantitative mineralogical study using ore microscopy, electron microscopy, proton-microprobe, image analysis, and material balances was done on samples from the circuit of a concentrator in Quebec

    Jan 1, 1999

  • ISEE
    Violence Factor – The New Tool for Blast Performance Analysis

    By Dr. Calvin J. Konya, Anthony Konya

    Blast violence has always been a criteria that has been analyzed without a quantitative approach relying on opinions of those viewing the blast and oftentimes does not transfer between open-pit mines,

  • AUSIMM
    Ventilation Challenges Facing the Metalliferous Sector

    By D J. Brake

    The underground metalliferous mining industry continues to change under the influence of many factors including, to name a few, new mining techniques and equipment, new approaches to risk management,

    Jul 1, 2013

  • SME
    Development Of The Rapidex Continuous Spiral Drill And Blast Tunneler, Phase III

    By Carl R. Peterson

    The Rapidex continuous drill and blast tunneling concept utilizes a unique spiral blasting pattern that permits efficient performance with relatively small single shots, while at the same time directi

    Jan 1, 1977

  • NIOSH
    RI 8073 Drillability Determination-A Drillability Index for Percussion Drills

    By Sathit Tandanand

    This Bureau of Mines report describes the method of obtaining a strength index for rock drillability, particularly for percussion drills. The original Protodyakonov method has been slightly modified,

    Jan 1, 1975

  • AUSIMM
    The Hydrogeochemical Characterisation of an Unsaturated Waste Rock Pile, Key Lake, Saskatchewan, Canada

    By L Smith, R Beckie

    Controls on environmental loading from acid rock drainage (ARD) are not well understood in waste rock material. In particular, relationships between subsurface flow and the timing, duration, and inten

    Jan 1, 2003

  • SME
    Hydrologic Aspects Of Strip Mining In The Subbituminous Coal Fields Of Montana

    By Wayne A. Van Voast

    Many coal beds that will be mined in southeastern Montana are aquifers that provide essential local water supplies. Mine cuts along aquifer outcrops create almost imperceptible piezometric changes. Mo

    Jan 1, 1978

  • NIOSH
    RI 4759 The Short-Circuiting Contactor As An Electrical Protective Device For Coal Mine Service

    By L. H. Harrison

    In coal mines equipped with electrically driven mechanical mining equipment, the problem of protection for electrical circuits and machinery important, because the hazards of fires and explosions resu

    Jan 1, 1951

  • SAIMM
    Maximum height estimation for mine waste dumps

    By S. Chai

    Waste dumps are widely used to discharge stripped mine wastes in open pit mining methods. As mining progresses, the height of the waste dumps will increase gradually, which may induce sliding failure

    Oct 1, 2022

  • AUSIMM
    Influence of Blasthole Delay Times on Fragmentation as well as Characteristics of and Blast Damage behind a Remaining Bench Face through Model-scale Blasting

    By P Moser, P Schimek, F Ouchterlony

    This paper summarises the findings of 27 model-scale bench blasts in magnetic mortar, which were conducted from 2011 to 2014 at the blasting site of the Montanuniversitaet Leoben.The aim of the study

    Aug 24, 2015

  • AUSIMM
    Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken Hill

    The 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The

    Jan 1, 1965

  • SME
    Case study: correcting control problems on Essroc’s multidrive station, horizontally curved conveyor - SME Transactions 2013

    By A. Jennings, J. Cornet, P. Perrone

    Controlling long overland conveyors with multiple drive stations is a complex problem. The methods for controlling these belts in a steady state are well-covered in existing literature, but a discussi

    Jan 1, 2013

  • CIM
    Some Observations on Explosive Metallurgy

    By H P. Tardif

    This paper briefly describes some of the phenomena encountered when materials are submitted to extremely high pressures, such as those produced by the detonation of an explosive charge placed in conta

    Jan 1, 1964

  • AUSIMM
    Increasing the deportment of titanium species to, and the stability field of pseudobrookite phase for valourisation of titaniferous slags

    By J Nell, J Petersen, X C. Goso

    The feasibility of increasing the deportment of titanium species and the stability of the pseudobrookite solid solution (M3O5) in a titaniferous slag was investigated, to facilitate the valourisation

    Jun 19, 2024