Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
RI 4562 Lead Smelting In The Ore Hearth I. Problems Involved In Smelting Rich ChargesBy G. L. Oldright
In an earlier series of 15 Reports of Investigations on Smelting in the Lead Blast Furnace, experimental data were given on the operations of a custom smelter, a smelter treating rich lead products, a
Jan 1, 1949
-
An evaluation of an integrated screening and particle sorting grade engineering flowsheet, G.J. Wilkie, L. Keeney, P. Walters, L. Dyer, and B. TadesseBy L Dyer, G. J. Wilkie, P. Walters, B Tadesse, L. Keeney
Grade Engineering® is a term trademarked by the Cooperative Research Centre for Optimising Resource Extraction (CRC ORE) and includes five key levers for upgrading ores and rejecting waste prior to ex
Jan 1, 2020
-
131st Meeting of the A. I. M. E.By AIME AIME
THE 131st meeting of the American Institute of Mining and Metallurgical Engineers was held in New York on Feb. 16 to 20, 1925, with the largest registration of any previous meeting, the total being 13
Jan 1, 1925
-
Environmental Overview Of The Florida Phosphate IndustryBy Thomas P. Oxford
The impact of recent legislation on Florida phosphate industry operations has been dramatic. The most significant influences are described: the National Environmental Policy Act of 1969; the Federal W
Jan 1, 1979
-
Improving the Economics of Gold-Copper Ore Projects Using SART TechnologyBy R. W. Lawrence, O. Lopez
Many gold deposits in the world have not been developed clue to the presence of copper and other base metals which can cause metallurgical and environmental challenges clue to the formation of base me
Jan 1, 2011
-
Technology News - No. 448 - Improving the Performance of Longwell Gob Gas VentholesProvide longwall operators with an alternative strategy for placement of gob gas ventholes to improve gas production.
Jan 1, 1995
-
Book Review Non-Ferrous Extractive Metallurgy in the United KingdomThis volume, which was advertised in the December, 1968, issue of the Journal at a pre-publication price of £4, is edited by W. Ryan of Warren Spring Laboratory and published by the Institute of Minin
-
Thermal Transformation of Oxide and Hydroxide Minerals in Chromite and Manganese Ores "Mining, Metallurgy & Exploration (2021)"By S. K. Samal, B. Mishra, M. K. Mohanty, S. C. Mishra
Steelmaking industries consume the majority of chromium and manganese ferroalloys to impart several properties in steel and also for other purposes. The quality of ore governs the process kinetics as
Jan 21, 2021
-
Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction PlantBy Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Pressure‑Quantity Characteristic Curves for a Mature Panel Cave (Mining, Metallurgy & Exploration)By Y. Pan, V. V. S. Vytla, P. Tukkaraja, R. BHARGAVA, S. Jayaraman Sridharan
Panel caving is an underground bulk mining method that utilizes gravitational force for mining massive, steeply dipping, and deep-seated ore deposits at a lower operating cost. To control dust and gas
May 17, 2022
-
Combining FTIR Spectroscopy and Multivariate Calibration to Locate Mineable Ore DepositsBy Sharon L. Eyer
"FTIR spectroscopy is employed to define mineable ore deposits based on exploration samples. The RAMBO (Robotic Assessment of Mineable Bauxite Ore) technology is operating successfully at an alumina r
Jan 1, 1999
-
Part VII - Mechanisms of the Codeposition of Aluminas with Electrolytic CopperBy Charles L. Mantell, James E. Hoffmann
Mechanical inclusion, electrophoretic deposition, and adsorption were studied as mechanisms for code-position of aluminas present in copper-plating electrolytes as an insoluble disperse phase. Mechani
Jan 1, 1967
-
OFR-7-78 Improving Coal Mine Roof Stability By Pillar SofteningBy Bruce Maxwell
The deformation modulus of coal mine pillars theoretically can be reduced by drilling holes in advance of the mining face. This reduction of modulus along the edge of the pillar has the effect of decr
Jan 1, 1977
-
Technical Papers and Discussions - Howe Lecture - The Blast-furnace Process and Means of Control (Metals Tech., April 1946, T. P. 2021)By T. L. Joseph
It is a distinct privilege to participate in this meeting convened to honor the memory of Henry Marion Howe, a distinguished scientist and metallurgist. Many have added to our rapidly growing fund of
Jan 1, 1947
-
Technical Papers and Discussions - Howe Lecture - The Blast-furnace Process and Means of Control (Metals Tech., April 1946, T. P. 2021)By T. L. Joseph
It is a distinct privilege to participate in this meeting convened to honor the memory of Henry Marion Howe, a distinguished scientist and metallurgist. Many have added to our rapidly growing fund of
Jan 1, 1947
-
Value In Use Of Pasek Dunite Improving The Return Sinter FinesBy Aitor Elorriaga Fernandez de Arroyabe
The purpose of Sinter plants is to heat iron ore fines along with fluxes and coke fines or coal, to produce a semi-molten mass that solidifies into porous pieces of sinter with the needed size and str
Oct 30, 2017
-
State of the Institute and of the Mineral IndustriesBy Scott Turner
MY YEAR OF SERVICE as president of the A.I.M.E. came at a time when the mineral industry had suffered severely because of disturbed economic conditions throughout the world. The Institute, an integral
Jan 1, 1933
-
Physical MetallurgyBy R. L., Fullman
During the past year there have been a number of significant investigations that have furnished evidence on the driving forces governing grain growth and on the role played by boundary impurities. Th
Jan 1, 1949
-
The Recovery of Zinc and Lead from Blast-Furance Slag at Trail, B.C.By G. E. Murray
Introduction The development of the method for recovering zinc from lead blast-furnace slags at Trail is interesting and important in the history of both lead and zinc metallurgy. Many efforts have
Jan 1, 1933
-
RI 6563 Production of Coronene From CoalBy R. W. Hiteshue, R. W. Fridy, W. Kawa
A study of the production of coronene , a high - melting ( 440 ° C ) , highboiling ( 525 ° C) , polynuclear hydrocarbon , was made by the Bureau of Mines to determine the maximum yield obtainable by t
Jan 1, 1964