Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Petroleum Refining Industry Ready to Meet Phenomenal Demand Made on ItBy Walter Miller
ALTHOUGH confident of its ability to meet any demands which may be made, the petroleum refining industry is not complacent about the situation and realizes that the quantities of petroleum products to
Jan 1, 1942
-
Iron Mining: The Problems Of PlentyBy Walfrid Been
There are no particular nor unique features of iron mining that are not shared in some degree by all mining ventures everywhere. There are, however, at least three problems that have acquired a specia
Jan 1, 1964
-
Direct Performance Simulation Based on the Microstructure of SOFC Electrodes: A Phase Field ApproachBy You-Hai Wen, Yinkai Lei, Tian-Le Cheng
A phase field model is developed to simulate the performance of SOFC electrodes. By solving the conduction equations on both the electrolyte and electrode phases, and incorporating the three-dimension
Mar 1, 2018
-
How the Global Experience and Reach of Tunnelling’s True Multinationals Helped Solve a Road Tunnel Fit-out ChallengeBy S Strong, L I. Sanz Vivanco, T Brown
One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the prestressed precast
Sep 17, 2014
-
Automation of Rock Fragmentation AnalysisBy Hairong Zeng, Matthew Baumann, Shahram Tafazoli, Edmond Chow
Measurement of rock fragmentation has evolved from a completely subjective and manual process to a statistically objective and semi-automated process. However, ultimately, the vision is to achieve a s
Jan 1, 2012
-
Replacement Of Wet Ball Milling With High-pressure Grinding Ahead Of Mineral Separation - SME Annual Meeting 2022By S. Makni, F. Wang, A. Rosa, B. Klein, C. Saud, R. McIvor, A. Kumar, C. Gagnon, D. Gong
In response to the Natural Resources Canada “Crush It Challenge”, Corem partnered with the University of British Columbia and led a project to develop and demonstrate the use of high-pressure grinding
Mar 2, 2022
-
Part IV – April 1968 - Papers - Dislocation Structures in Slightly Strained Tungsten, Tungsten-Rhenium, and Tungsten-Tantalum AlloysBy Joseph R. Stephens
Deformation substructures of' polycrystalline tungsten, W-2, 9, and 24 pct Re, and W-3 pct Ta were studied by tra?zsrnission electron microscopy. The stress-strain curve for unalloyed tungsten
Jan 1, 1969
-
Improved Prices Spur Optimism at NWMA MeetingBy Steve Kral
After years of cutbacks, closures and layoffs, the mining industry is beginning to expand again. Metals prices are up and so is investor interest and confidence in the industry. Gold prices began
Jan 1, 2004
-
Accelerated degradation and modified slake durability testing of clay mineral-rich coal mine spoilBy B Miles, D J. Williams, J Ahn, T A. Vangsness
The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act
Jul 23, 2018
-
Mineral Indicators - Aluminum: (b3c2116c-79b3-4cf8-b906-142ad7bb287b)The Aluminum Co. of America raised its 99.5 percent unalloyed aluminum ingot selling price in March by 34 to 514 per pound. Other producers, including Kaiser Aluminum and Chemical Corp. , Anaconda Alu
Jan 1, 1977
-
How the Global Experience and Reach of Tunnelling’s True Multi-Nationals Helped Solve a Difficult Road Tunnel Fit-Out ChallengeBy Simon Strong, Tim Brown, Luis Ignacio Sanz Vivanco
"One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the pre-stressed preca
Jan 1, 2016
-
Commuting To Work At The Mattabi MineBy J. C. White
"During the early development of the Mattabi Mine in 1970, discussions with the Ontario Government revealed their policy of prohibiting, as much as possible, the development of new, isolated, single-i
Jan 1, 1976
-
IC 8687 Building Stoppings In Mines With Large OpeningsBy Edward D. Thimons
The Bureau of Mines conducted a state-of-the-art study of techniques currently employed to close large openings in underground mines. A large opening was considered to be any opening over 10 feet high
Jan 1, 1975
-
Undercut And Fill Mining At Magma Copper Company's Superior Division ? IntroductionBy Joseph W. Murray
Prior to 1950 Magma's ore production came from two parallel, steeply dipping, east-west striking mineralized faults, one called the Main or Magma vein, and the other the Koerner vein, which lay a
Jan 1, 1973
-
IC 7894 Abating Stream Pollution By Recovering Waste Oil From Steel Rolling Mills ? SummaryBy B. P. Martinez
This report presents the results of a research and development program in recovering waste-rolling oils conducted by the Bethlehem Steel Co., before 1954 at its Sparrows Point plant, Sparrow Point, Md
Jan 1, 1959
-
The role of a pilot scale facility in performing R&D and helping Canadian coal and mineral industriesBy O. E. Humeniuk, A. I. A. Salama, M. W. Mikhail
"The Western Research Centre (WRC) of CANMET operate a unique pilot plant facility where ongoing R&D on coal preparation and mineral processing is conducted. The pilot plant carries out two functions:
Jan 1, 1992
-
Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, FinlandOptimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland
Sep 13, 2010
-
New Diversion Hydropower Plant—Nedre Fiskumfoss - RETC2023By Mads Aniksdal
New Nedre Fiskumfoss is a construction project in North Trøndelag, Namsen River. The purpose of the contract is construction of a new hydropower plant, that will phase out the existing power plant in
Jun 13, 2023
-
Heap Bioleaching Of Gold-Bearing Refractory OresBy Sergey S. Gudkov
In the current climate of changing the approach to mining and treatment of mineral resources, processing technologies are being developed that require little maintenance and are economically as well a
Sep 1, 2012
-
Control of Gas Emission during Pyrolysis of Waste Printed Wiring BoardsBy Alex Luyima, Jaan Kers, Lifeng Zhang
"The pyrolysis of PWBs was investigated by a TG-DTA-MS furnace at 300–1173 K. The kinetics and the control of emitted gas during the pyrolysis of PWBs with and without chemical additives were studied.
Jan 1, 2012