Search Documents

  • AUSIMM
    The use of Conditional Simulation for Drill Hole Spacing Evaluation and Decision-Making in Telégrafo Project, Northern Chile

    By O Rojas

    The Telégrafo copper – gold deposit is located in the Centinela district of the Antofagasta region in northern Chile. Telégrafo is a porphyry copper deposit of Eocene – Oligocene age which h

    Aug 22, 2011

  • CIM
    An optimized decision model for area selection in massive sulphide exploration

    By G. Favini

    A Bayesian decision model of minimun risk, based on the probability and costs of mine discoveries and non-economic projects, is presented for massive sulphide exploration in the Canadian Shield. The s

    Jan 1, 1979

  • NIOSH
    RI 8846 - Evaluation of Methods for Recovering Potash From Carnallite Ore

    By D. G. Foot

    The Bureau of Mines investigated two methods for recovering potash from carnallite ore in continuous 100-lb/h flotation units. In the insoluble-slimes flotation procedure, insoluble slimes were remove

    Jan 1, 1984

  • TMS
    Fundamental Design Issues for Gas and Solids Injection into Molten Metals

    By G. A. Irona

    Solids injection into non-ferrous converters and furnaces is becoming increasingly important for concentrate injection, removal of impurities, and recycling of dusts and other waste materials. The fun

    Jan 1, 1993

  • AUSIMM
    Evaluation of Precision being Obtained by a Three-Stage Sampling System for Coal

    By C D. Rose

    "The primary objective of this paper is to demonstrate a different approach to predicting and verifying mechanical sampling system precision. Early in the year 2011 an experiment was conducted to eval

    Aug 21, 2012

  • SME
    Lix®-64 As An Extractant For Copper Pilot Plant Data

    By D. W. Agers

    This paper is an extension of previous work evaluating a new extractant, LIX®-64, for recovery of copper from dilute acidic solutions. Large scale pilot plant operations have confirmed the technical a

    Jan 1, 1967

  • AUSIMM
    Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons Learnt

    By P Marlow

    Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su

    Mar 21, 2011

  • DFI
    The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall

    By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers

    Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM

    Jan 1, 2019

  • CIM
    Three Mining Methods for Vertical, Inclined and Thick Coal Seams Used in France

    By G. Ellie, D. F. Coates

    "The mining of coal in thick and inclined seams is difficult, and there are only a few countries in the world that are really interested in the problems associated with their exploitation. In France a

    Jan 1, 1972

  • NIOSH
    OFR-15-72 Solid Sap - A Static Analysis Program For Three Dimensional Solid Structures

    By Edward L. Wilson

    A general computer program is given for the linear elastic static analysis of complex structural systems. These elements have special advantages for the analysis of massive underground structures such

    Jan 1, 1971

  • CIM
    Integrating Geology and Borehole Geophysics in a Common Earth Model for Improved Three-dimensional Delineation of Mineral Deposits

    By W. J. Mcgaughey, M. A. Vallée

    "Abstract -The application of geophysical technology to resource delineation aims to improve the quality of resource/reserve estimates by integrating high-resolution survey methods, geophysical modeli

    Jan 1, 1998

  • SAIMM
    Maximum height estimation for mine waste dumps

    By S. Chai

    Waste dumps are widely used to discharge stripped mine wastes in open pit mining methods. As mining progresses, the height of the waste dumps will increase gradually, which may induce sliding failure

    Oct 1, 2022

  • SME
    Surface Chemistry Modification of Rock Dust for Improved Dispersion and Coal Dust Explosion Prevention

    By K. Perry, B. Lusk, Q. Huang, R. Honaker

    "Rock dust is applied in underground coal mines to prevent the propagation of coal dust explosions. The application is conducted either dry or wet. Both methods have advantages and disadvantages howev

    Jan 1, 2015

  • NIOSH
    RI 8496 A Breathing Metabolic Simulator for Testing Respiratory Protective Equipment

    By Anthony W. Sparks

    The Bureau of Mines conducted tests designed to compare its breathing metabolic simulator (BMS) with other methods that are currently used to evaluate the performance of respiratory protective equipme

    Jan 1, 1980

  • AUSIMM
    Processing options for removal of silica and alumina from low-grade hematite-goethite iron ores

    By M I. Pownceby, S P. Suthers, V Nunna, G J. Sparrow

    Global demand for iron and steel has increased substantially over the past 20 years and there has been a greater focus on developing suitable processing options to treat low-grade hematite-goethite or

    Nov 8, 2021

  • AIME
    Eastern Magnetite ? Strikes Responsible for Major Production Drop

    By J. R. Linney

    APPROXIMATELY 5,788,000 long tons of crude ore was produced by the Eastern magnetite industry in 1946, or a drop of 26 per cent compared -with 1945. Decrease in production -throughout the industry var

    Jan 1, 1947

  • SME
    Abrasivity and Cutter Life Assessment for TBM Tunneling in Cobbles and Boulders - RETC2021

    By Steven W. Hunt, Glen R. Frank

    Assessment of abrasivity and cutter life are necessary to properly manage risks when tunneling in mixed face ground which includes ground with cobbles and boulders. Maximizing cutter life requires: (1

    Jun 13, 2021

  • NIOSH
    RI 9057 Thickening Fine Coal Refuse Slurry for Rapid Dewatering and Enhanced Safety

    By Bill M. Stewart

    To decrease the potential for fine coal waste slurry impoundment failures, the Bureau of Mines investigated a new disposal technique. The fine coal waste slurry is rapidly thickened (i.e., dewatered)

    Jan 1, 1986

  • SME
    Methods For Estimating Nonpoint Pollution Loads From Mining Activities - Introduction: Nature Of Nonpoint Pollution

    By John W. Nebgen

    Surface water quality is determined by complicated interactions between water and land. Runoff--the flow of waters in surface streams and rivers-¬represents the total amount of water collected in a dr

    Jan 1, 1975

  • SME
    Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022

    By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe

    Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon

    Dec 1, 2022