Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application of High Pressure Techniques for the Synthesis of Metastable Thin Film Oxides from Alloys of Si1-xGexBy David J. Howard, Christine Broadbridge, David C. Paine
"High pressure vapor/solid reactions offer an opportunity for novel synthesis and processing of thin film materials and structures for electronic, optical, and magnetic applications. In this paper we
Jan 1, 1994
-
Concept of a Digital Twin for an Underground Laboratory at the Reiche Zeche Mine Utilizing Artificial Intelligence - SME Annual Meeting 2025By Ali Ahmadi, Andreas Rausch, Angela Binder, Stefan von der Mark, Dhananjeyan Jeyaraj, Jana Thomas, Nils Nöther, Stefan Wittek, Thomas Ulrich, Eleni Gerolymatou, Mario Kolling, Helmut Mischo, Michael D. Martin, Tugba Sen, Jens-André Paffenholz, Erik Farys, Oliver Langefeld, Wilfried Ließmann
This paper outlines the MOVIE project, which is dedicated to the development of a digital twin for an underground laboratory at the research and education mine “Forschungs- und Lehrbergwerk Reiche Zec
Feb 1, 2025
-
Development and application of simple process models for spiral concentratorsBy A. Steinmüller
Introduction In the design and operation of gravity concentration circuits, the application of process models for spiral concentrators offers significant benefits. A substantial amount of work has
Jan 1, 2005
-
A Genetic Algorithm-based Approach For Optimizing Short-term Production Schedules Of Multimine Mineral Value ChainsBy Biswajit Samanta, Pranjal Pathak
A multimine mineral value chain (MVC) consists of multiple mines in the upstream supplying raw materials to multiple destinations in the downstream. The short-term mine production scheduling problem o
Oct 1, 2022
-
Reconciliation of the Mining Value Chain – Mine to Design as a Critical Enabler for Optimal and Safe Extraction of the Mineral ReserveBy M. Bester, R. Carey, T. Russell, J. van Heerden
"In order to reach the goal of optimal and safe extraction of the mineral reserve, the mining industry is increasingly focusing on reconciliation across the mining value chain to ensure that the minin
Jan 1, 2016
-
The Performance of Trial Covers Used for the Rehabilitation of Acid Generating Coal Reject Dumps in Northern Kwazulu-Natal, South AfricaBy N Bezuidenhout
The performances of ten field-scale experimental final covers were evaluated over an eight-year period. The covers were evaluated as part of the rehabilitation of acid generating coarse coal reject du
Jan 1, 2003
-
Assessment of Rental Income in Mineral Processing For Rare Earth DepositsBy S. V. Bogdanov, S. I. Grishaev
"The article presents the materials about the appropriateness of the use of rental indices to assess the effectiveness of the use of deposits of rare earth elements (REE). The authors suggest from the
Jan 1, 2018
-
South Africa’s mineral resource availability as a potential driver for transitioning to a circular economyBy L. Godfrey, Z. Nontso, F. Magweregwede, B. Maphalala, S. Khan
The aim of this paper was to establish if mineral resource scarcity is a driver for South Africa to transition to a circular economy. The project objectives were achieved by investigating economically
Mar 5, 2025
-
Development of Flowsheet for a Low Grade Chromite Ore in TurkeyBy Ö. Y. Gulsoy, L. Ergün, I. B. Celik
"In this study, the studies to develop a flowsheet for a low grade chromite ore are presented. The existing concentrator had to be suspended due to the decreasing metal prices. The study commenced wit
Jan 1, 2017
-
Turbulent models for pollutant transport in openpit mines under stable boundary layer - SME Transactions 2015By R. V. Ramani, K. V. Raj, S. Bandopadhyay
The air flow problems in openpit mines are complex. Computational fluid dynamics (CFD) models can provide detailed information regarding air flow pattern, velocity distribution, temperature, and pollu
Jan 1, 2015
-
Some Methods Of Producing Interval Estimates For Global And Local ResourcesBy B. M. Davis
The problem of assessing uncertainty in grade estimates has been a topic of research and debate since kriging was first introduced. Use of the kriging variance was originally touted as all that was ne
Jan 1, 1997
-
Point Kriging For Isopach Estimation A Case Study In Reject AssessmentBy D. E. Ranta, William B. Ryan, Ronald W. May
The Lower Cretaceous McMurray Formation in northern Alberta contains bituminous sands interbedded with other sediments which form the reject encountered during mining operations. Grade prediction is b
Jan 1, 1992
-
Investigation of Pillar Loading Considerations in Determination of Pillar Stability Factors for Longwall Gateroad DesignBy Heather E. Lawson
Recent field data providing measured pillar loading from a deep western mine revealed that an increased load transfer distance existed compared to expected values (Larson et al., 2012). Additionally,
Jan 1, 2013
-
Evaluating tailgate spray manifolds to reduce dust exposures for shearer face personnel - SME Transactions 2016By G. J. Joy, J. P. Rider
Technical advances in longwall mining over the last several years have resulted in much larger and faster shearers that have the capability of mining at speeds over 30 m/min (100 fpm). This has result
Jan 1, 2016
-
Automated Installation Monitoring For Augercast And Driven PilesBy Garland Likins
Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat
Jan 1, 1999
-
Solid Oxide Membrane Process for Calcium Production Directly From its OxideBy Soobhankar Pati
Solid oxide membrane (SOM) technology has been successfully employed for the production of high energy metals such magnesium, titanium and tantalum by directly reducing their oxides. This paper report
Jan 1, 2008
-
Estimating Process Design Gold Extraction, Leach Residence Time and Cyanide Consumption for High Cyanide-Consuming Gold OreBy G. Plenge, M. Brittan
"Plant design parameters for gold extraction, leach residence time and cyanide consumption are generally determined from standard bench-scale bottle roll or agitation leach tests. The application of l
Jan 1, 2015
-
Scavenging For Better Recovery Of Phosphates (cea990f1-9fb2-4878-b115-bb7e0897a913)By H. EI-shall
The conventional beneficiation scheme for Florida phosphates involves reverse flotation with an intermediatory acid scrubbing step. A single reagent flotation process, using fatty acids or amine as th
Jan 1, 1993
-
Integration of Disparate Data Types for Resource Estimation - A Nickel Laterite ExampleModern technology and the need for published results have created the tendency for exploration to concentrate on drilling and assaying rather than building a broader geological understanding. Though g
Jan 1, 2008
-
A Process for the Simultaneous Leaching and Recovery of Gold, Platinum Group Metals and Base Metals from Ores and ConcentratesA novel pressure leaching process for platinum group metal (PGM) feedstocks is described. The process is particularly well suited for treatment of ores or concentrates that are too low grade for econo
Jan 1, 2000