Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Comparison of Pyrotechnic and Electronic Initiation Systems at Whitehaven Coal MineSasol Roche Blasting Services (SRBS) has undertaken a process of trialing and evaluating the use of the SMI electronic initiating system with the specific purpose of being able to fully quantify the b
Jan 1, 2003
-
Engineering Challenges in MiningBy C. E. White
The depletion of higher grade mineral reserves will accelerate the trend toward production from progressively larger and lower grade deposits. The discovery of adequate reserves of leaner ores will re
Jan 1, 1967
-
What is driving the development of integrated technical enterprise systems in the mining industry?By I. Jones
Geologists, engineers, technicians and surveyors have successfully utilized technical software in the mining industry for over 30 years. Software for processing survey, geology, mine engineering and p
Jan 1, 2003
-
Practical Techniques To Improve The Air Quality In Underground Stone MinesBy R. H. Grau, S. B. Robertson, F. Garcia, A. C. Smith, T. P. Mucho
Researchers working for the National Institute for Occupational Safety and Health (NIOSH) at the Pittsburgh Research Laboratory are developing ways to protect the health of miners. Part of that effort
-
Contributions from Improved Surface Mine Haulage Road Design, Operation and Management Techniques to Sustainable DevelopmentOperating well designed and maintained surface mine haul roads is the key to minimising truck haulage costs - in itself a significant component of the total cost per tonne mined. Existing and proposed
Jun 1, 2010
-
A Quick Sustainability Assessment Of An Industrial FacilityBy G. Gaidajis
In this paper, a semi-qualitative methodology is presented and then applied to an aluminium extrusion industrial facility in order to perform an initial environmental assessment. The results of the as
Jan 1, 2008
-
Grinding Ball RationingBy Walter L. Crow
MUCH has been published on highly technical phases of grinding. Very little has been written on how a mill man can improve his operations by determining the optimum size assortment of grinding balls t
Jan 7, 1957
-
The Effect Of Turbulence On The Flotation Rate Of Galena When Using Fine BubblesBy D. R. Spears, C. E. Jordan
The U.S. Bureau of Mines examined the influence of turbulence on the fine bubble flotation of fine-sized (minus 40 micron) galena in order to improve flotation efficiency. Fine bubble flotation was ca
Jan 1, 1989
-
Determination Of The Stopline Subsidence Profile Of Phalen 2 West Panel From Within A Near Horizontal Borehole Over The Panel StoplineBy William D. Gallant
This paper presents the results of a joint cooperative research project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to observe the subsidence pr
Jan 1, 1990
-
Introduction of Battery Powered Coal Haulers into Board and Pillar Panel ProductionPowercoal Pty Ltd operates eight underground coal mines in New South Wales and produces coal for both domestic power stations and the export market. Approximately 40% of total production is from conti
Jan 1, 1998
-
The Future of Microseismicity Monitoring in Mines: Beyond the ?DotsInduced microseismicity monitoring is: ?Essential tool in improving the geotechnical understanding about a mine and its inaccessible surrounding rock masses. It helps to determine: -Event timing,
Aug 1, 2013
-
Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2013
-
Operational Experience Of Jinlong's Copper Flash SmeltingBy Bao Xiancheng
Jinlong's copper flash smelting process started up in April 1997. In the early days of production, lots of equipment and process problems were encountered. But, through continuous improvements in
Jan 1, 2002
-
Process Improvement in the Thompson Smelter Through Centralized Air DryingBy Wayne C. Stewart
Freezing of high pressure air lines and pneumatic equipment has been a recurring problem in the Thompson Smelter. The particular severity during the winter of 1989-90 resulted in costly process disrup
Jan 1, 1993
-
Freeport Indonesia's Deep Ore Zone MineBy T Casten
Freeport IndonesiaÆs DOZ (Deep Ore Zone) mine is scheduled to commence production in the second half of 2000. The DOZ will produce 25 000 tpd using mechanised block cave mining methods and will have a
Jan 1, 2000
-
Seismic source parameters used to monitor rockmass response at Brunswick MineBy B. Simser
Noranda?s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping technique
May 1, 2004
-
Seismic source parameters used to monitor rockmass response at Brunswick mine (5a673da7-13e1-42d4-880a-c4441be71d76)By B. Simser, V. Falmagne
"Noranda’s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping techniqu
Jan 1, 2004
-
In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?By Richard W. Hanford
The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an
Jan 1, 2001
-
RI 9528 - Evaluation Of The Three-Phase, Electric Arc Melting Furnace For Treatment Of Simulated, Thermally Oxidized Radioactive And Mixed Wastes (In Two Parts) - 1. Design Criteria and Description of Integrated Waste Treatment FacilityBy L. L. Oden
The U.S. Bureau of Mines and the Department of Energy (DOE), through its contractor EG&G Idaho Inc., are collaborating on a multiyear research project to evaluate the applicability of three-phase, ele
Jan 1, 2010
-
Improvements in Coal-Waste Disposal Since Buffalo CreekBy Kelvin K. Wu
A coal waste disposal dam failed on Buffalo Creek near Saunders, West Virginia, on February 26, 1972. This accident resulted in the loss of 125 lives, left over 4000 people homeless, and resulted in m
Jan 1, 2006