Search Documents

  • NIOSH
    RI 7214 Use Of Fly Ash For Remote Filling Of Underground Cavities And Passageways

    By Edwin M. Murphy

    Methods are described for filling underground cavities remotely with dry material pneumatically injected through a borehole to seal openings, prevent air movement, and reduce subsidence; this often br

    Jan 1, 1968

  • AIME
    Ore Concentration and Milling - Improvements Noted in Grinding, Gravity Separation, Cyanidation, Flotation, Dust Control

    By E. W. Enqelmann

    INCREASED metal consumption throughout the world in the past three years has brought greater activity in the concentrators and mills that treat the ores.' Comparatively low prices have made great

    Jan 1, 1940

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • NIOSH
    IC 8517 How To Mine And Prospect For Placer Gold

    By J. M. West

    Increased leisure time and increased interest in the out-of-doors is leading more and more families to experiment with placer mining of gold, and some- times even to going on into small-scale producti

    Jan 1, 1971

  • NIOSH
    OFR-47(1)-80 Interpretation Of Rock Mechanics Data - Vol. I (A Two-Dimensional Finite Element Approach To The Evaluation Of Underground Coal Mine Stability)

    By W. G. Pariseau

    A two-dimensional finite element program has been modified and extended to account for some of the rock mechanics complexities associated with single entry development of longwall coal mine panels. Pr

    Jan 1, 1978

  • NIOSH
    RI 9528 - Evaluation Of The Three-Phase, Electric Arc Melting Furnace For Treatment Of Simulated, Thermally Oxidized Radioactive And Mixed Wastes (In Two Parts) - 1. Design Criteria and Description of Integrated Waste Treatment Facility

    By L. L. Oden

    The U.S. Bureau of Mines and the Department of Energy (DOE), through its contractor EG&G Idaho Inc., are collaborating on a multiyear research project to evaluate the applicability of three-phase, ele

    Jan 1, 2010

  • NIOSH
    OFR-12-75 Impact Of Higher Ecological Costs On Surface Mining

    By W. E. Foreman

    A mathematical model was developed to assess the costs for reclamation of surface mining using the shovel overcasting operation, the front end loader operation, and a backfilling operation. A literat

    Jan 1, 1974

  • SME
    Cost And Production Analysis For Haulback Contour Mining

    By J. H. Gasper

    A cost analysis for two alternative contour mining methods is performed to compare their results. The methods evaluated are: 1) Front-End Loader/Truck Haulback and 2) Scraper Haulback. Before performi

    Jan 1, 1992

  • AIME
    The Preparation Of Anthracite.

    By Paul Sterling

    1. INTRODUCTION. THE general impression regarding the preparation of merchantable anthracite is that it is confined to a colossal, grimy structure, called a "coal-breaker." This name is misnomer; f

    Oct 1, 1911

  • SME
    Molybdenite Flotation From Copper/Molybdenum Concentrates By Ozone Conditioning (db26685c-10b3-4bd2-b48c-69e9624125ef)

    By Y. Ye

    Typically, rougher molybdenite flotation and recovery from bulk copper/ molybdenum concentrates involves the use of alkalisulfides, Nokes reagents, cyanides, oxidants, and/or thermal treatment for the

    Jan 1, 1990

  • TMS
    Development of a Direct Evaporator for the Organic Rankine Cycle

    By Donna Guillen, Matthew Lehar, Sebastian Freund, Jennifer Jackson, Helge Klockow

    "Research and development is currently underway to design an Organic Rankine Cycle (ORC) system with the evaporator placed directly in the hot exhaust stream produced by a gas turbine (GT). ORCs can b

    Jan 1, 2011

  • NIOSH
    IC 8639 Proceedings Of The Symposium On Talc, Washington, D.C., May 8 1973

    A symposium on the health hazards of respirable dust in the mining and milling of talc was held on May 8, 1973, in Washington, D.C. The results of medical effects on both human and animal subjects wer

    Jan 1, 1974

  • AIME
    Pouring Concrete with a Pressure Chamber

    WHEN pouring concrete it frequently happens that space prohibits the placing of a mixer at the point, or points, where the concrete is to be used. Usually in such cases recourse is had to some form of

    Jan 1, 1929

  • CIM
    Remote, Non-Contact Sensors for Control of the Integrated Process Route

    By M. S. Millman

    Close monitoring of performance at each process stage, from raw material through to finished product, is vital for operational consistency and the production of high quality steel. However, many of th

    Jan 1, 2004

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • NIOSH
    Lessons From The Granite Mountain Shaft Fire, Butte. - Introduction.

    By Daniel Harrington

    On the night of June 8, 1917, the flame of a carbide lamp accidentally set fire to the uncovered and frayed insulation of an armored power cable near the 2,400-foot level of the North Butte Mining Co.

    Jan 1, 1922

  • NIOSH
    OFR-25-78 Study And Analysis Of Surface Subsidence Over The Mined Pittsburgh Coalbed

    By R. E. Gray

    [The purpose of the study is to investigate cases of subsidence over abandoned mined-out areas of the Pittsburgh Coal identified from published and unpublished sources and to determine through a consi

    Jan 1, 1977

  • SME
    Increasing Mine To Market Coal Transport Productivity Through Better Particle Management At The Mine Face (0536d3ea-d307-4b3a-b7a4-2e7d1fce4a5c)

    The absence of coal face particle management practices heavily penalizes coal transportation from initial loading to final consumption. Penalties include dust problems, significantly reduced mine load

    Jan 1, 1994

  • ISEE
    Improving open-pit blast design through rock hardness estimation and prediction based on Measurement-While-Drilling data: Applications in large copper mines in Chile.

    By Sebastián Seria, Jorge Álvarez, Diego Cáceres

    The capacity to break the rock into adequate size fragments and in a cost-effective way is one of the main challenges in large open pit copper mines in Chile. That capacity is often compromised by the

    Jan 26, 2026

  • AIME
    Quarrying of Limestone at Lime Spur, Montana

    By P. F. MINISTER

    AT Lime Spur, Mont., the East Butte Copper Mining Co. has been quarrying limestone for twenty years. The quarry is beside the Northern Pacific R. R. in the Jefferson River canyon, 4 ½ miles east of Ca

    Jan 1, 1930