Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
RI 7214 Use Of Fly Ash For Remote Filling Of Underground Cavities And PassagewaysBy Edwin M. Murphy
Methods are described for filling underground cavities remotely with dry material pneumatically injected through a borehole to seal openings, prevent air movement, and reduce subsidence; this often br
Jan 1, 1968
-
Ore Concentration and Milling - Improvements Noted in Grinding, Gravity Separation, Cyanidation, Flotation, Dust ControlBy E. W. Enqelmann
INCREASED metal consumption throughout the world in the past three years has brought greater activity in the concentrators and mills that treat the ores.' Comparatively low prices have made great
Jan 1, 1940
-
Stabilising and filling the Beaconsfield Hart ShaftBy A Turner, P Hills, D Johnson
Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i
Nov 30, 2018
-
IC 8517 How To Mine And Prospect For Placer GoldBy J. M. West
Increased leisure time and increased interest in the out-of-doors is leading more and more families to experiment with placer mining of gold, and some- times even to going on into small-scale producti
Jan 1, 1971
-
OFR-47(1)-80 Interpretation Of Rock Mechanics Data - Vol. I (A Two-Dimensional Finite Element Approach To The Evaluation Of Underground Coal Mine Stability)By W. G. Pariseau
A two-dimensional finite element program has been modified and extended to account for some of the rock mechanics complexities associated with single entry development of longwall coal mine panels. Pr
Jan 1, 1978
-
RI 9528 - Evaluation Of The Three-Phase, Electric Arc Melting Furnace For Treatment Of Simulated, Thermally Oxidized Radioactive And Mixed Wastes (In Two Parts) - 1. Design Criteria and Description of Integrated Waste Treatment FacilityBy L. L. Oden
The U.S. Bureau of Mines and the Department of Energy (DOE), through its contractor EG&G Idaho Inc., are collaborating on a multiyear research project to evaluate the applicability of three-phase, ele
Jan 1, 2010
-
OFR-12-75 Impact Of Higher Ecological Costs On Surface MiningBy W. E. Foreman
A mathematical model was developed to assess the costs for reclamation of surface mining using the shovel overcasting operation, the front end loader operation, and a backfilling operation. A literat
Jan 1, 1974
-
Cost And Production Analysis For Haulback Contour MiningBy J. H. Gasper
A cost analysis for two alternative contour mining methods is performed to compare their results. The methods evaluated are: 1) Front-End Loader/Truck Haulback and 2) Scraper Haulback. Before performi
Jan 1, 1992
-
The Preparation Of Anthracite.By Paul Sterling
1. INTRODUCTION. THE general impression regarding the preparation of merchantable anthracite is that it is confined to a colossal, grimy structure, called a "coal-breaker." This name is misnomer; f
Oct 1, 1911
-
Molybdenite Flotation From Copper/Molybdenum Concentrates By Ozone Conditioning (db26685c-10b3-4bd2-b48c-69e9624125ef)By Y. Ye
Typically, rougher molybdenite flotation and recovery from bulk copper/ molybdenum concentrates involves the use of alkalisulfides, Nokes reagents, cyanides, oxidants, and/or thermal treatment for the
Jan 1, 1990
-
Development of a Direct Evaporator for the Organic Rankine CycleBy Donna Guillen, Matthew Lehar, Sebastian Freund, Jennifer Jackson, Helge Klockow
"Research and development is currently underway to design an Organic Rankine Cycle (ORC) system with the evaporator placed directly in the hot exhaust stream produced by a gas turbine (GT). ORCs can b
Jan 1, 2011
-
IC 8639 Proceedings Of The Symposium On Talc, Washington, D.C., May 8 1973A symposium on the health hazards of respirable dust in the mining and milling of talc was held on May 8, 1973, in Washington, D.C. The results of medical effects on both human and animal subjects wer
Jan 1, 1974
-
Pouring Concrete with a Pressure ChamberWHEN pouring concrete it frequently happens that space prohibits the placing of a mixer at the point, or points, where the concrete is to be used. Usually in such cases recourse is had to some form of
Jan 1, 1929
-
Remote, Non-Contact Sensors for Control of the Integrated Process RouteBy M. S. Millman
Close monitoring of performance at each process stage, from raw material through to finished product, is vital for operational consistency and the production of high quality steel. However, many of th
Jan 1, 2004
-
Resolution to a Conflict Regarding Blasting Near a High Pressure PipelineBy Randall Wheeler
In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou
Jan 1, 2011
-
Lessons From The Granite Mountain Shaft Fire, Butte. - Introduction.By Daniel Harrington
On the night of June 8, 1917, the flame of a carbide lamp accidentally set fire to the uncovered and frayed insulation of an armored power cable near the 2,400-foot level of the North Butte Mining Co.
Jan 1, 1922
-
OFR-25-78 Study And Analysis Of Surface Subsidence Over The Mined Pittsburgh CoalbedBy R. E. Gray
[The purpose of the study is to investigate cases of subsidence over abandoned mined-out areas of the Pittsburgh Coal identified from published and unpublished sources and to determine through a consi
Jan 1, 1977
-
Increasing Mine To Market Coal Transport Productivity Through Better Particle Management At The Mine Face (0536d3ea-d307-4b3a-b7a4-2e7d1fce4a5c)The absence of coal face particle management practices heavily penalizes coal transportation from initial loading to final consumption. Penalties include dust problems, significantly reduced mine load
Jan 1, 1994
-
Improving open-pit blast design through rock hardness estimation and prediction based on Measurement-While-Drilling data: Applications in large copper mines in Chile.By Sebastián Seria, Jorge Álvarez, Diego Cáceres
The capacity to break the rock into adequate size fragments and in a cost-effective way is one of the main challenges in large open pit copper mines in Chile. That capacity is often compromised by the
Jan 26, 2026
-
Quarrying of Limestone at Lime Spur, MontanaBy P. F. MINISTER
AT Lime Spur, Mont., the East Butte Copper Mining Co. has been quarrying limestone for twenty years. The quarry is beside the Northern Pacific R. R. in the Jefferson River canyon, 4 ½ miles east of Ca
Jan 1, 1930