Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Petroleum Industry - Increased Domestic Business Activity, and the European War Improves the Export OutlookBy Basil B. Zavoico
PRODUCTION of crude it in the United States during 1939 totaled about 1.255,776,000 barrels, an average of 3,440,482 barrels per day, 3.41 per cent above the 1938 output of 1,214,355,000 barrels but 1
Jan 1, 1940
-
RI 8530 An Evaluation of Used Aluminum Smelter Potlining as a Substitute for Fluorspar in Cupola IronmeltingBy V. R. Spironello
The Bureau of Mines is conducting studies of the slags related to ferrous technology to evaluate acceptable substitutes for the auxiliary flux, mineral fluorspar, in foundry operations. This work is d
Jan 1, 1981
-
Cooling on demand – the next step in ventilation automationBy F C. D Michelin
As mines get deeper, the critical underground temperature limits will be exceeded, and an increasing number of mines will need to implement, expand or modify cooling systems. Surface cooling plants ha
Oct 12, 2022
-
RI 5197 Mobile Laboratory For Recording Blasting And Other Transient Phenomena ? Introduction And SummaryBy T. C. Atchison
This report describes a mobile laboratory designed and constructed by the Bureau of Mines in 1950 to meet the needs of an experimental blasting research program. The laboratory has facilities for maki
Jan 1, 1956
-
Project DevelopmentBy Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake
The business objectives of a metallurgical project determine targets and constraints, such as the range of products, production capacities, in-service dates, and capital and operating cost parameters.
Jan 1, 2015
-
RI 9476 - Facility for Melting Residues From Municipal Waste Combustion: Design Criteria and Description of Equipment (b805f73a-ba30-4e6f-abf9-034803cd5126)By Alan D. Hartman
The U.S. Bureau of Mines, under a Memorandum of Agreement with the American Society of Mechanical Engineers (ASME), established design criteria for a facility to melt residues from municipal waste com
Jan 1, 2010
-
Enhanced Settling Of Fine Silica By Indirect A.C. ElectrocoagulationBy R. O. Ifill
Alternating current electrocoagulation (AC/EC) may be an alternative to chemical coagulation in the thickening of tailings in the mineral, coal and petroleum industries. In the current study, ground s
Jan 1, 2011
-
Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration PlantBy S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam
At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale
Jan 1, 2016
-
Froth Stability and Flotation Performance (7b8a1c74-3cc5-4e7a-aff4-2a34a702138a)By Jan J. Cilliers, Nicolas Barbian, Esther Ventura-Medina
"Froth structure and stability are known to play an important role in determining flotation recovery and selectivity. An industrial sampling campaign was performed to develop a clearer understanding o
Jan 1, 2003
-
Business Dynamics And Diversification PlanningBy F. Alsobrook
Industrial minerals are receiving increased attention by metals, coal and other companies seeking to diversify and stabilize earnings. Each industrial mineral has a unique set (and sub-sets) of busine
Jan 1, 1990
-
Recovery Of Platinum Group Metals From Automobile Catalysts--Pilot Plant OperationBy R. J. Kuczynski
The U.S. Bureau of Mines Reno Research Center operated a batch pilot plant to demonstrate high-temperature cyanide leaching for recovering platinum group metals (PGM) from automobile catalysts. Approx
Jan 1, 1995
-
The Development of the 'Dosco MinerBy F. Doxey
Introduction In order to improve outputs and to reduce or hold mining costs, many attempts have been made to mechanize the getting and loading of coal in the major coal producing countries, and machi
Jan 1, 1951
-
Aspects of Impurities Control at Caraiba Metais' ElectrorefineryBy José Luiz Rodrigues Bravo
The production of electrolytic copper with assured quality corresponding to international standards, in a conventional electrorefkery of a custom smelter, is a hard and cautious task, if no advanced t
Jan 1, 1997
-
RI 9409 - Calculation of Vertical Stress Exerted by Topographic Features (e01163ef-449c-47ba-aaf6-96bea50d6389)By Valois R. Shea-Albin
An accurate assessment of the vertical stress on a coal seam at depth is important for mine design. Vertical stress calculation techniques presently available either are not sufficiently accurate or c
Jan 1, 2010
-
RI 8826 Neodecanoic Acid as a Co³⁺ Solvent ExtractantBy Jack L. Henry, Davis E. Traut, L. R. Penner
The Bureau of Mines conducted solvent extraction batch tests to evaluate the usefulness of neodecanoic acid ( NDA) for extracting Co 3+ from ammoniacal leach liquors high in ammonium sulfate . This wo
Jan 1, 1965
-
Engineering Strategies for Dust Control in High-Quartz Coal Mine SectionsBy J. M. Mutmansky, L. Xu
"IntroductionSince the establishment of the star,just concentration of 2 mg/m3, a strong effort has made by mining engineers and researchers to provide better dust control equipment and procedures for
Mar 1, 1992
-
RI 3189 Falls Of Roof And Coal In The Book Cliffs And Wasatch Plateau Coal Fields Of Utah ? Purpose Of ReportBy Herbert Tomlinson
The United States Bureau of Mines has engaged in a study of the conditions under which coal mine accidents, resulting in the loss of life, limb, or time to the injured person, occur from falls of roof
Jan 1, 1932
-
RI 3189 Falls Of Roof And Coal In The Book Cliffs And Wasatch Plateau Coal Fields Of UtahBy Herbert Tomlinson
The United States Bureau of Mines has engaged in a study of the conditions under which coal mine accidents, resulting in the loss of life, limb, or time to the injured person, occur from falls of roof
Jan 1, 1932
-
OFR-121-78 Design Of A Retrofittable Temporary Face Support SystemBy Alfred Bellows
The objective was to develop and design a remotely operated temporary roof support system that provides a safe working environment between a freshly cut coal face and the last line of permanently supp
Jan 1, 1976
-
Building Safe, Productive Cultures and LeadershipBy M I. Roberts
Corporate and workplace culture, as many owners, directors, executives and managers know, is by far the most powerful determinant of productivity. It’s much more significant than buildings and equipme
Jun 22, 2016