Search Documents

  • NIOSH
    OFR-86-75 Ore Handling Equipment Operations Safety Study In Underground Metal And Nonmetal Mines ? Section 1 ? Introduction

    The low production rates associated with the underground metal mining industry have received considerable attention during the last decade. A number of significant technological advancements, in the f

    Jan 1, 1975

  • NIOSH
    World Gold - A Minerals Availability Appraisal - Executive Summary - The World Gold Industry - An Introduction

    More gold is being produced now than ever before in recorded history. All over the world huge quantities of ore are being mined and processed, thanks to historically high prices for gold and the use o

    Jan 1, 1994

  • CIM
    Exploiting A Small Orebody

    By E P. Graham

    Orebodies occur in an infinite variety of grades, shapes and sizes, and take many millions of years to grow. When extraction starts there is only one possible end -the mine sooner or later will run ou

    Jan 1, 1964

  • IOM3
    Annual general meeting of the Institution of Mining and Metallurgy

    The report of the Annual General Meeting of the Institution of Mining and Metallurgy held on Thursday, 20 May, 1971, in the rooms of the Geological Society of London, Burlington House, Piccadilly, Lon

    Dec 1, 1971

  • NIOSH
    RI 6569 Beneficiation and Hydrometallurgical Treatment of Complex Mercury Sulfide Products

    By W. A. Stickney, J. W. Town

    Batch and continuous - circuit flotation , leaching , precipitation , and electrodeposition studies were made by the Bureau of Mines to determine optimum conditions for treatment of complex mercury -

    Jan 1, 1964

  • IOM3
  • SME
    The Grangcold Pellet Process ? Introduction

    By Jonas Svensson

    The Grangcold Pellet Process - for which patents have been applied or already granted in a number of countries - uses a hydraulic adhesive such as Portland cement, slag cements, pozzolanic cements, et

    Jan 1, 1969

  • SME
    Metropolitan Water Tunnel Program in Massachusetts - RETC2023

    By Rafael C. Castro, Paul V. Savard, Kathleen M. Murtagh

    Preliminary design is underway for the Massachusetts Water Resources Authority’s (MWRA) next major tunnel program, the Metropolitan Water Tunnel Program (MWTP). The MWTP is the latest part of MWRA’s o

    Jun 13, 2023

  • SME
    Short Term Planning For Mining A Longwall Panel: An Application Of Geostatistics For Quality Control

    By R. W. Barbaro

    The limitation of sulfur dioxide in power plant emissions dictates that sulfur in coal be reduced to the lowest possible level before combustion so as not to aggravate the emission control problem at

    Jan 1, 1988

  • IOM3
    Discussions and contributions: The Hammersley iron pellet plant

    By J. R. Hammond, I. C. Herbert

    Report of discussion at October, 1970, IMM general meeting (Chairman: M. J. Cahalan, President) and contributed remarks on the paper published in Transactions/Section C (Mineral Processing & Extractiv

    Dec 1, 1971

  • SME
    The Use Of Hydrocyclones For Ultrafine Separations: Case Studies (af4c86c9-14b3-472b-bcfc-917c784c3194)

    By Gerald P. Kelton

    Over the past quarter of a century, the success of the hydrocyclone as a classifier in closed circuit grinding installations has permitted the introduction of the cyclone into virtually all fields of

    Jan 1, 1983

  • AUSIMM
    Detecting Sampling Biases in Metal Accounting

    By L Lachance, F Flament, D Leroux, S Gariépy

    The pervasiveness of poor sampling practices in and around mineral processing plants could seem intriguing in view of the various documented evidences both for causes and consequences. To this extent,

    Jul 29, 2014

  • SME
    Update On Refuge Alternatives: Research, Recommendations And Underground Deployment

    By E. R. Bauer

    In response to the mandates in the MINER Act of 2006, the National Institute for Occupational Safety and Health (NIOSH) conducted refuge alternatives research that included characterizing the utility,

    Jan 1, 2009

  • TMS
    High-Temperature Cyanide Leaching of Automobile Catalysts In A Process Development Unit

    By R. J. Kuczynski

    The U.S. Bureau of Mines operated a 2,000-9 (4.4-lb) batch process development unit for recovering platinum-group metals (PGM) from automobile catalysts. Virgin monolith, used pellet and used monolith

    Jan 1, 1993

  • CIM
    Reducing Heat-Induced Health and Safety Problems in Underground Metal Mines by Means Of New Technologies and Renewable Energy-Based Cooling Systems

    By K. Scalise, M. Teixeira, K. C. Kocsis, J. Parrish

    "This paper aims to introduce and discuss a newly developed algorithm, which can be uploaded on smart watches and other mobile devices to inform and protect underground personnel working in hot and hu

    Jan 1, 2019

  • SME
    Large Capacity Flotation Cells ? Introduction

    By W. H. Reck

    he need in the mineral industry to treat increasingly larger tonnages has caused a demand for larger installations. In order to limit the size of these installations, it was necessary to build machine

    Jan 1, 1969

  • AUSIMM
    Deportment of Gold in Sulfide Ores and Implications for Gold Extraction

    By J Zhou

    Gold in sulfide ores is associated predominantly with sulfide minerals and occurs as both microscopic and submicroscopic particles. In non-refractory sulfide ores, gold occurs mainly as coarse- and me

    Sep 26, 2013

  • TMS
    Microwave Heating Of Waste Tires

    By Yuzhe Zhang, Xiaodi Huang, Xinli Wang, Bowen Li, Matthew Andriese, Jiann-Yang Hwang, Zhiwei Peng, Likun Li

    With the development of the world, the waste tires have been a serious environmental problem. There are about 2 billion waste tires produced all over the world every year and about 500 million waste t

    Jan 1, 2016

  • SME
    Discharge Permitting And Environmental Assessment Issues Associated With Submarine Tailings Disposal For The Alaska-Juneau Mine Project

    By P. McGrath

    From the mid-1980s through 1997, Echo Bay Alaska evaluated reopening the historic Alaska-Juneau (AJ) gold mine. Their original proposed project underwent numerous modifications in order to minimize th

    Jan 1, 1998

  • CIM
    A method to synchronize the tandem dragline systems

    By B. Erdem, N. Çelebi

    An important problem associated with tandem dragline systems is that of matching the productive capability of individual draglines in the combination. In this paper, a dependence mechanism among dragl

    Jan 1, 1999