Search Documents

  • SME
    Aerial Drones used to Sample Pit Lake Water Reduce Monitoring Costs and Improve Safety

    By S. Thibeault, P. Filiatreault, B. Straight, D. Castendyk, L. Cameron

    "Unmanned aerial vehicles (UAV), or drones, capable of collecting and retrieving water samples from pit lakes, tailings ponds and other mine water basins will revolutionize environmental programs by l

    Jan 1, 2017

  • NIOSH
    OFR-148-84 Roof Bolt Anchorage Quality Indicator/ Tension Decay Equalizer

    By Anil Mahyera

    This report present the results of a laboratory and field research program aimed at design and development of a torque-thrust controlled bolter with the capability to (1) predict the "quality of ancho

    Jan 1, 1983

  • AUSIMM
    Freeport Indonesia's Deep Ore Zone Mine

    By T Casten

    Freeport IndonesiaÆs DOZ (Deep Ore Zone) mine is scheduled to commence production in the second half of 2000. The DOZ will produce 25 000 tpd using mechanised block cave mining methods and will have a

    Jan 1, 2000

  • DFI
    Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load Testing

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l

    Sep 8, 2021

  • DFI
    Geotextile Encased Columns (GEC) as Pile-Similar Foundation Elements: Basics, Specifics, Case Studies

    By Marc Raithel, Sven Schröer, Lilma Schimmel, Dimiter Alexiew

    "The Geotextile Encased Columns (GEC) deep foundation system for embankments and dikes on soft soils was introduced some 20 years ago and is now considered State-of-the-art in Germany, Europe and, ste

    Jan 1, 2017

  • NIOSH
    IC 8191 Research And Technologic Work On Explosives, Explosions, And Flames: Fiscal Year 1961 (9e9050c1-2ffa-434c-8d93-eda7adac969a)

    By Ruth F. Brinkley

    Principle activities of the Bureau of Mines Explosives Research Laboratory from July 1, 1960 to June 30, 1961 are reviewed briefly in Part 1. Part 1 also includes data obtained in connect ion with sev

    Jan 1, 1963

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • CIM
    Kinross Mine Planning Best Practice

    By C. Turek, R. Henderson

    Mine planning is the foundation of value for a mining company. Good mine planning requires solid understanding of the ore body, rigorous standards and processes, robust and useful information technolo

    Jan 1, 2011

  • NIOSH
    Bibliography Of Pressure Hydrogenation (In Three Parts) I. Review And Compilation Of The, Literature On The Pressure Hydrogenation Of Liquid And Solid Carbonaceous Materials - Introduction

    By J. L. Wiley

    THIS REVIEW contains abstracts of the technical literature and patents dealing with the history, development, and commercial application of the Bergius and related processes for the hydrogenation, und

    Jan 1, 1950

  • AUSIMM
    Using SAP Business Objects to Deliver Actionable Information for Operators to Management

    Real-time data collection and plant historians are becoming common place in mining and processing plants. This vast quantity of data must be turned into easily accessible and actionable information fo

    Sep 26, 2011

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    Controlled Recirculation and Refrigeration at ValeÆs Taquari Potash Mine

    By S Bluhm, LádeáOliveira, R Funnell

    Taquari Vasouras potash mine (Vale Fertilizantes) has many interesting features including virgin rock temperatures of 50¦C at depths of 700 m. The mine has a relatively small shaft system with limited

    Jul 1, 2013

  • IMPC
    The Successful Application Of A Laboratory-Developed Test Protocol Utilizing Electrochemical And Surface Chemical Analysis To The Industrial Flotation Process Of A Complex Sulphide (Cu-Pb-Zn-Au-Ag) Ore

    By Caroline Olsen

    The objective of this study was to achieve Zn activation control in an industrial Cu flotation circuit treating a complex Cu-Pb-Zn-Au-Ag sulphide ore at the LaRonde Division of Agnico-Eagle Mines Limi

    Sep 1, 2012

  • NIOSH
    IC 8651 Bureau Of Mines Energy Program, 1973

    By John D. Spencer

    Research on the development of new and improved methods for the discovery and production of oil and gas and production of fluid fuels from coal continued to be the major thrust of the Bureau of Mines

    Jan 1, 1974

  • NIOSH
    IC 9337 Chromium Availability In Market Economy Countries And Network Flow Model Analysis Of World Chromium Supply

    By Jr. Boyle

    This report analyzes the availability of chromium in the form of ferroalloy products (high-carbon and low-carbon ferrochromium and ferrochromium-silicon) and chromite products (metallurgical, chemical

    Jan 1, 1993

  • NIOSH
    RI 4742 Laboratory-Scale Work On Synthesis-Gas Production

    By J. J. S. Sebastian

    The process development described in this report was carried out at the Morgantown Station of the U. S. Bureau of Mines in cooperation with West Virginia University. An experimental laboratory-scale p

    Jan 1, 1950

  • AUSIMM
    Design of Paste Backfill Plant and Distribution System for the Cannington Project

    Safety bulletins and stickers issued for the paste backfill plant at Cannington read as follows: æCannington Paste Fill Plant, First of ItÆs Kind in AustraliaÆ. We could even dare to state that the Ca

    Jan 1, 1998

  • SME
    Industrial Minerals Review 2009

    By R. L. Virta

    Four companies mined ball call in four states in 2009, H.C. Spinks Clay Co. Inc. (owned by Lhoist Group), Kentucky-Tennessee Clay Co. (owned by Imerys Group), Old Hickory Clay Co. and Unimin Corp. Pro

    Jun 1, 2010

  • NIOSH
    IC 6914 Mining And Milling Methods And Costs, Hog Mountain Gold Mining & Milling Co., Alexander City, Ala. ? Introduction

    By N. O. Johnson

    This is one of a series of-Information Circulars dealing with mining and milling methods and costs at mines in various districts in the United States. The Hog Mountain gold mining district is of th

    Jan 1, 1936