Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Justifying Slope Design Risks and CostsBy N M. Player, R P. Varden, E Jones
"An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t
Nov 15, 2016
-
Advances In The Cyanidation Of SilverBy G. Deschênes
Silver minerals are known to have slow leaching rates and low overall extraction and require a high concentration of cyanide and a long retention time to maximize leach extraction. Their response to c
Jan 1, 2011
-
Grade Control At Houston International Minerals Corporation Manhattan MineBy L. G. Martin
Early mining at Manhattan demonstrated that blasthole assays alone were insufficient to control the disposition of material. A program was began using controlled blasting, intense sampling and panning
Jan 1, 1980
-
OFR-3(1)-75 Design And Development Of Protective Canopies For Underground Low Coal Electric Face Equipment, Including Shuttle CarsBy R. Farrar
Protective canopies for conventional electric face equipment, including shuttle cars, operating in low coal (less than 48 inches) were designed, fabricated, installed and evaluated on in-mine machines
Jan 1, 2012
-
Predicting and Optimising the Strength of Cemented Paste FillsBy Kanhaiya Mishra, Phanil. K. Mandal, S. K. Behera, P. S. Paul, Prashant Singh, C. N. Ghosh
The techno-economic and social benefits of cemented paste backfill (CPB) resulted in its wide acceptance by the mining industry. The Ordinary Portland Cement (OPC) remains the key binder but to dimini
Jul 14, 2022
-
Using Diagnostic Process Analysis To Improve Cash Flow At Newmont's Carlin Mill #4 (db011a4b-638f-4581-b93c-6e10e492e3e7)Mill #4 processes mildly refractory ore from Carlin Trend deposits. Diagnostic analysis of plant operating data was used to generate a mathematical model containing the key parameters influencing the
Jan 1, 1999
-
Interpreting Backfill QA/QC Test Data: Do We Need an Industry Standard?By D. Stone, R. Pakalnis, B. Seymour
Most mines using backfill routinely carry out quality control (QC) testing of backfill mixes with unconfined compression test cylinders. This is true for paste operations, hydraulic fill operations, a
Jan 1, 2019
-
Pulp-Lifter flow Modeling Study in a Pilot Scale Mill and Application to Plant Scale MillsBy Raj Rajamani
In general, many past works examine mill load, mill power, shell lifter design etc with a view to improving the mill capacity. On the contrary, only a handful of papers have addressed the transport of
Jan 1, 2012
-
Preventive Maintenance Inspection in Coal MinesBy P. E. Cavanagh
FOR THE PAST seven years Mr. W. Simpson, Chief Mechanical Inspector for the Nova Scotia Department of Mines, has carried out exhaustive field trials of non-destructive inspection equipment in the coal
Jan 1, 1956
-
Saskatchewan's coal futureBy T. Adamcewicz
The province's lignite resources lie mainly in the south, extensions of the much larger deposits in Montana and North Dakota. Because of planned additional capacity, conventional steam power generatio
Jan 1, 1982
-
Physical Metallurgy: What It Is and How It ProgressesBy Oscar E. Harder
THE TERM "physical metallurgy' is used in the title of this lecture in preference to "metallography ?because the former has a broader meaning with most audiences, some people thinking of the latt
Jan 1, 1940
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground "CIM Connect 2025"By Karl Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Oct 1, 2024
-
Improved Pile Economics: High Design Stresses And Remote Pile TestingBy Jim Frazier
Tradition has often dictated low design load stresses on piles. Such traditions often developed prior to modern static or dynamic pile testing methods and perhaps result from a few limiting situations
Jan 1, 2002
-
Results and Significance of Drilling Operations in the Athabaska Bituminous Sands (7db10b31-607f-414b-a150-33830f038468)By G. S. Hume
Dr. K. A. Clark: No one will doubt the statement of fact that, during drilling operations through the bituminous sand beds in the Mildred-Ruth Lakes area, the core-barrel was found to contain bitumen
Jan 1, 1947
-
Simulation of Airflow Changes in a VOD System and Evaluation of Energy Benefits through VREX ModelingBy G. G. Li
"A dynamic ventilation-modeling package, VREX, was used to simulate the mine activities through tracking the equipment movements in underground workings and determine the airflow demand for a new prod
Jan 1, 2019
-
Post-Education in the Coal Industry - a Unique ProgramBy H. R. Wheeler
CREATION of a "committee on promotion of student interest in coal mining" has an encouraging implication for the coal industry. It is indicative that mining men, both in the field and in the education
Jan 1, 1940
-
Groundwater Pressure Consideration on Partially Drained Tunnel Lining Rehabilitation Design - NAT2022By Irwan Halim, Young Jin Park
A new tunnel lining was designed for rehabilitation of the existing unlined Weehawken Tunnel in New Jersey. Structural assessment using beam spring models was performed for the lining design as a drai
Dec 1, 2022
-
The Raising Of No. 7 Shaft At Britannia MinesBy E. C. Roper
THE Britannia Mining & Smelting Company, Limited, have been operating their property at Britannia Beach, B.C., continuously for nearly forty years and have mined over 33,000,000 tons of ore from orebo
Jan 1, 1945
-
Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and ConstructionBy A Hughes, S G. Rosin
This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the
Sep 17, 2014
-
Real-Time Cost Monitoring By Continuous Sensor-Based Data Collection and TransmissionBy T. Lupek, M. Buxton, A. de Jong
"With regard to the EU funded project ‘Real-Time Mining’ a sensor-based acquisition, collection and transmission of data for the resource extraction process will be developed. The key concept promotes
Jan 1, 2016