Search Documents

  • CIM
    Rock Stress Measurement Technique by Using High Stiffness Hydraulic Fracturing System

    By K. Ogawa, T. Yokoyama

    Hydraulic fracturing technique, an applied technique to cause tensile fractures to rock by injecting water pressure to a certain closed section of the borehole, is a measurement method of in-situ rock

    Jan 1, 2015

  • IIMP
    Geomembranes mitigate environmental issues in tailings dams

    By Pascual Perazzo Vaschetti Gabriella

    The increasing emphasis on environmental issues has crucial importance in mining projects, hence in tailings dams. Their water barrier needs a two-fold environmental assessment: the environmental impa

    Sep 30, 2022

  • AUSIMM
    Ultra-High-Intensity Blasting - A New Paradigm in Mining

    By G F. Brent, S Hawke, M Rothery, P Dare-Bryan

    Mine-to-mill studies have previously demonstrated downstream productivity benefits from relatively modest increases in blast energy, or powder factor. These increases have up to now been limited by sa

    Sep 26, 2013

  • DFI
    Dyna Force Sensors for Monitoring of Tension/Compression Forces in Ground Anchors & Piles

    By Shahid Islam, Lucian Bogdan

    "The maintenance of infrastructures has been of particular concern to the engineering community. As the world’s infrastructure expands and existing infrastructure ages, monitoring and evaluation of th

    Jan 1, 2017

  • DFI
    Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean

    By Ihab Allam PE, Meeok Kim. PE. Ph. D

    The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa

  • SME
    Forecasting Mine Quality From Drill Core Data

    By David D. Eyer

    In today's world coal market, coal quality is becoming increasingly important. Often the coal quality parameters are one of the crucial considerations in the development of a coal mine. Because o

    Jan 1, 1980

  • AIME
    Lubrication of Mining Equipment - Part 1 - Cutters, Loaders, Conveyors, and Elevators

    By Charles W. Frey

    SUCCESSFUL mining today means proper mechanization. Before any mine can begin production on a paying scale, some machinery must be installed. There must be pumps to remove water, fans and blowers to p

    Jan 1, 1938

  • SME
    Minimizing Impacts on Streams Due to Underground Mining by Predicting Surface Ground Movements (d951173a-61f5-4d4f-9d81-afec78e0ae93)

    By G. B. J. Leon, M. Karmis, C. Newman

    "The prediction of surface deformations due to underground mining operations has been a long recognized practice with case studies documented as far back as 1556 in Georgius Agricola's De Re Metallica

    Jan 1, 2016

  • SME
    Impact Of State And Federal Water Pollution Control Laws On The Mining Industry In Missouri

    By James P. Odendahl

    Missouri is a state rich in mineral commodities. There is a variety of types of mining as well as minerals in the state. Different phases of mining are controlled by a variety of state and federal law

    Jan 1, 1977

  • CIM
    The Ecstall Story: The Employee Relations Department

    By Gerald R. Larocque, Donald F. Grenville

    "IN APRIL, 1965, the employee relations department (then called the personnel department) was established as a separate function within the company. Its aims and objectives were to hire an effective w

    Jan 1, 1974

  • ABM
    Modernization Of The Kroman Wire Rod Mill To Increase Productivity, Utilization And Product Quality

    By Bruce V. Kiefer

    A modernization project was undertaken by Kroman Celik Sanayii A.S. in order to improve their product quality, consistency and shape of the coil package, reduce maintenance and delays in rod mill, the

    Oct 30, 2017

  • NIOSH
    RI 5117 The Fabrication Of Arc-Melted Ingots Of Titanium And Titanium-Manganese Alloys Into Plate ? Summary

    By R. W. Huber

    Three arc-melted ingots, two of a titanium-7 percent manganese alloy and the third of unalloyed titanium, were forged and rolled into 3/4-inch plate; comparative data were obtained on these processes.

    Jan 1, 1955

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • CIM
    The Lignite Deposit at Onakawana, Moose River Basin, Ontario

    By W. S. Dyer

    The lignite deposit at Onakawana on the Abitibi river is of particular interest at the present time, since the Ontario Government has recently decided to proceed with the extension of the Temiskaming

    Jan 1, 1930

  • TMS
    Electrocatalytic Reduction of CO2 to C2H4 at a Gas/Solution/Metal Interface

    By Kotaro Ogura

    "The electrolysis process in which CO2 is selectively reduced to C2H4 at a three-phase(gas/solution/metal) interface on a copper-mesh electrode has been developed in a concentrated solution of potassi

    Jan 1, 2008

  • NIOSH
    IC 7582 Energy Uses and Supplies, 1939, 1947, 1965

    By Harold J. Barnett

    In January 1948 , the Secretary of the Interior directed that a study be made of energy resources and requirements that would provide a basis for continuing appraisal of the adequacy of the Department

    Oct 1, 1950

  • TMS
    The Technological Characteristics Of Blended Nkalaha And Nsu Clays.

    By N. E. Idenyi

    The effects of compositions and firing temperatures on the physico-mechanical properties of blended Nsu fireclay and Nkalaha redbrick clay have been investigated. The clay samples were compounded acco

    Jan 1, 2006

  • DFI
    Three Deep Mixing Projects: Comparison between Laboratory and Field Test Results

    By George Filz, Morales, Carlos, Bertero, Filippo Maria, Alessandro, Leoni

    "The Deep Mixing Method (DMM) represents a viable solution to improve adverse geotechnical properties of foundation soils for many practical applications. A pre-construction soil investigation campaig

    Jan 1, 2015

  • TMS
    Metallurgical Sulfuric Acid Plant Gas Cleaning Using Dynawave Froth Scrubbing Technology (7b3421b0-7054-4a39-ae36-171cf9211124)

    By James R. Myers

    A source of clean gas containing sulfur dioxide and sufficient oxygen for convers.ion to sulfur trioxide ?is essential to the production of sulfuric acid. S02 containing gases obtained from roasting s

    Jan 1, 1992

  • ISEE
    AN Railcar Derailed Debris Collection – Data Analysis Update

    By Brandon Fryman, Josh Hoffman, Rhys Baker

    A post-detonation debris collection project was led in conjunction with a large ammonium nitrate (AN) railcar detonation conducted by the Department of Homeland Security-Transportation Security Admini

    Feb 1, 2020