Conveyor Belting In The '70'sBy Edgar T. Gregory
A quiet revolution has taken place in the conveyor belt industry, Man-made materials, improved production facilities, better splicing techniques and emphasis on repair and maintenance have all contrib
Jan 1, 1971
-
Balmer's in-pit coal conveyor: Improving haulage efficiencyBy C. H. van Eendenburg
"Installation of a 3.6 km long raw coal conveyor in the Balmer open pit was undertaken to improve over-all haulage efficiency. This paper covers the rationale behind this project, system design and co
Jan 1, 1990
-
Preblast Surveys and a Look at Today's Seismographs: A General LookBy Randall M. Wheeler
Pre-blast surveys are used to document the condition of a structure prior to the commencement of blasting activities. They provide the best means of determining the pre-existence of visible cracking a
Jan 1, 1992
-
A Consumer's Guide to Bulk Emulsions and Emulsion/ANFO BlendsBy Catharine L. VanOmmeren
Emulsion quality characteristics such as shelf life, handling, and sensitivity are critical to the end-user. It is therefore important that the consumer be prepared to ask his supplier specific questi
Jan 1, 1989
-
Inco's New Anode Furnaces And Anode Casting Shop At The Copper Cliff SmelterBy B. Bichel
For the last 70 years, molten blister copper has been transferred by rail in hot metal cars from the Copper Cliff Smelter to the Copper Cliff Copper Refinery (ex Ontario Refining Company) where it was
Jan 1, 2002
-
Jim Walter Resources, Inc.'s Booster Fan Proposal - A Case StudyBy John W. Stevenson, Ted L. Sartain
Underground booster fan installations are currently employed in hundreds of coal mines throughout the world. Such installations, when properly designed and maintained, have proven to be safe and effec
Jan 1, 1989
-
Sistema De Barra Segura Para Distribuição De Energia Na Companhia Siderúrgica Do PecemBy Paulo Ricardo Bastos de Queiroz
Após estudo realizado, verificou-se que a CSP - Companhia Siderúrgica do Pecém, possuía alta vulnerabilidade às oscilações de frequência, sejam elas oriundas de falhas nas unidades geradoras ou proble
Oct 30, 2017
-
Application of Machine Learning in rock mass characterization for BlastingBy Javier Illanes, Felipe Moroni
In recent years, implementation of Artificial Intelligence and Machine Learning model technology has gained ground in almost every aspect of human activities. The mining industry has not been foreign
Jan 21, 2025
-
A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves
The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t
Jan 21, 2025
-
Solutions to reduce blast-induced ore loss and dilution at the Ahafo openpit gold mine in Ghana - SME Transactions 2012By A. Tordoir, S. S. Kanchibotla, W. Rogers, E. Engmann, B. Bisiaux, S. Ako
Blast-induced rock mass displacement can have a significant impact on ore loss and dilution. The mischaracterization of the grade boundaries both prior to, as well as a result of, blasting can lead to
Jan 1, 2012
-
Enhancing crushing plant safety – a technical overviewBy J Dyt, S Lyons
In the mining industry, crusher-related incidents have led to 15 reported deaths in Australia, New Zealand, and the USA between 1998 and 2007 (NSW Government Resources Regulator, 2024). The majority o
Apr 16, 2024
-
Enhancing Pillar Stability in a Deep-Cover Longwall Mine Using the LaModel Program: A Comparative Analysis - SME Annual Meeting 2025By Morgan M. Sears
The stability of gateroad pillars is crucial in deep-cover longwall mining, especially during transitions to wider panel layouts. This study evaluates the transition from a 700-foot to a 1,000-foot pa
Feb 1, 2025
-
Dynamic Analysis In A Rebar MillBy Ramon Augusto Moretti, Henrique da Rocha Severino, Renato Nascimento de Castro, Fernando Cesar Sousa
Rolling stand 12 (LTx) of long steel, installed in the company A, Piracicaba - SP unit, had presented high levels of vibration, which affected its internal components, such as: shaft, gears and bearin
Oct 1, 2019
-
Process Control - A Technology for the Present and FutureBy DJ McKEE
Process control emerged in the mid-1960s as a new and exciting method of improving the performance of mineral processing operations. The early Australian developments, principally in Broken Hill and
Jan 1, 1992
-
Structural Underpinning an Airport Terminal to Mitigate Tunneling Risk—Atlanta Plane Train West Extension Project - RETC2023By John Murray, Ryan Smith, Daniel Ebin, Robert Gould, Thomas Hennings
The Atlanta Plane Train Tunnel West Extension was excavated at Hartsfield-Jackson Atlanta International Airport using Sequential Excavation Methods (SEM). At its shallowest point, tunnel cover to bott
Jun 13, 2023
-
The Use of Integrated Web-Based Solutions in Productivity ImprovementBy P Cooper
Continuous improvement using six sigma methodologies commonly follows the DMAIC methodology of define, measure, analyse, improve and control. A key requirement in the use of this approach is to ensure
Jul 11, 2011
-
Computer Control Improves Metallurgy At Tennessee Copper's Flotation PlantBy Bobby P. Faulkner
The Tennessee Copper Co.'s flotation plant, refer- T red to as London Mill, processes approximately 4800 tons of a massive complex sulfide ore per day. The ore is predominantly pyrrhotite and pyr
Jan 11, 1966
-
Presidential Address: Beyond effortdriven operations: Building peoplecentric operating models for mining’s futureBy G. R. Lane
My opportunity to serve as President of the prestigious Southern African Institute of Mining and Metallurgy (SAIMM) was made possible by an Anglo American scholarship 39 years ago—a pivotal moment tha
Oct 2, 2025
-
Mine-to-mill Improvements Anchored In Drilling Accuracy - SME Annual Meeting 2023By A. Almeida, D. Castro, K. Ingmarsson, D. Ferreira, R. Tamir
Mine-to-mill improvements can be initiated at any stage, but it is our assertion that drilling accuracy is a practical anchor in any operating mine or quarry for a structured continuous improvement pr
Feb 1, 2023
-
Structural, Spectroscopic, Magnetic, and Thermal Characterizations of a Magnetite NanoparticleBy Ritayan Chatterjee, P. K. Mukhopadhyay, Surajit Biswas, Dinabandhu Ghosh, Sandeep Agarwal
An Indian magnetite ore from the Nagaland region was characterized by powder X-ray diffraction, spectroscopies (ultraviolet-visible and Raman), high temperature magnetization and thermal analysis. A R
Mar 1, 2018