Search Documents

  • CIM
    Design and Implementation of Modified Mo Addition to EAF at Uddeholm AB, Sweden

    By M. Nzotta, L. Teng, S. Seetharaman, A. Chychko

    The objective of the present work is to optimize the EAF practice towards Mo alloying with maximum retention of the alloying element in molten steel. During Mo additions, there were significant losses

    Jan 1, 2011

  • AUSIMM
    Project Management for All Seasons ù Financial Risk Mitigation in a Challenging World

    By O C. Aitken

    Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark

    Jan 1, 2004

  • AUSIMM
    Geotechnical Challenges in Narrow Vein Mining

    By J Hadjigeorgiou

    Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o

    Mar 26, 2012

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • TMS
    On the Relationship Between Hardening and Softening Processes and the Austenite-to-Ferrite Phase Transformation in Steel

    By David N. Hanlon

    The effect of high-temperature plastic deformation of the austenitic phase (y) on the subsequent phase transformation to ferrite (a) has been experimentally investigated, and modelled using a physical

    Jan 1, 2001

  • NIOSH
    RI 5788 Oil-Well Logging With Model Equipment: Tests On Noninvaded Thin Beds With Shielded Electrodes ? Summary

    By C. I. Pierce

    This report describes and presents results of a phase of a laboratory study conducted at the Morgantown Petroleum Research Laboratory, Federal Bureau of Mines, Morgantown, W. Va., to determine the res

    Jan 1, 1961

  • SME
    Burning Coal Refuse In Fluid Beds

    By Jurgen H. Kleinau

    This paper details Keeler/ Dorr-Oliver's experience with the application of fluid bed combustion technology to the burning of coal-mining waste. The designs of two stage fluid bed combustors/dry

    Jan 1, 1985

  • SME
    Coal Mine Subsidence In Colorado: Practical Application In A Regulatory Setting - Introduction

    By James A. Pendleton

    The Legislature of the State of Colorado adopted House Bill 1223, "The Colorado Surface Coal Mining Reclamation Act" (The State Act), in 1979. This Act provided for the creation of a state regulatory

    Jan 1, 1985

  • CIM
    The Measurement of the Sulphur Dioxide Content of Copper Converter Gases as an Aid to Converter Control

    By E. H. Dudgeon

    In order to make increased use of automation in copper smelting, it is evident that a useful first step .world be the accurate determination of the copper end point in the converter operation. After l

    Jan 1, 1966

  • SME-ICGCM
    User-Friendly Finite Element Design of Main Entries, Barrier Pillars, and Bleeder Entries

    By William G. Pariseau, Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "This contribution describes development and application of a user-friendly finite element program, UT3PC, to address three important problems in underground coal mine design: (1) safety of main entri

    Jan 1, 2017

  • SME
    Asbestos, Definition(s), Detection, And Measurement ? Introduction

    By R. J. Lee

    Asbestos analysis is conceptually simple. The objective, in most environmental analyses, is to determine the number of asbestos fibers per unit area or volume in a sample. The sample may be a consumer

    Jan 1, 1979

  • CIM
    The Use of Magnesium Alloys: Past, Present and Future

    By K. U. Kainer

    Magnesium and its alloys as the lightest available construction metal offer a wide range of opportunities for the usage in transportation industries, especially Magnesium wrought alloys with their imp

    Jan 1, 2006

  • NIOSH
    IC 8247 Electronic Monitoring Of Mine Fans

    By John C. Hartley

    Three systems that monitor ventilating fans are described. These electronic monitoring systems automatically perform most of the operations required to conform with the provisions of the Federal Mine

    Jan 1, 1964

  • SME-ICGCM
    Evaluating the Risk of Coal Bursts in Underground Coal Mines

    By Michael Gauna, Christopher Mark

    "Coal bursts involve the sudden, violent ejection of coal or rock into the mine workings. They are almost always accompanied by a loud noise, like an explosion, and ground vibration. Bursts are a part

    Jan 1, 2015

  • NIOSH
    Electrical Accidents in the Mining Industry, 1990-1999

    By James C. Cawley

    This National Institute for Occupational Safety and Health study was conducted to focus future research on the most significant electrical problems in the mining industry. Data from 1,926 mine electri

  • CIM
    Assessment of Wall Control Blasting Practices at the Ekati? Diamond Mine

    By J. Peterson

    A review of blast designs and improved blasting practices at the Ekati??Diamond Mine is presented along with the results of three blast-monitoring experiments. Blast monitoring was undertaken to inves

    May 1, 2001

  • AUSIMM
    Mining for Water - Partnering for Sustainable Water Use in Semi-Arid Regions

    By N Lefebvre, M Jakeman, R Aseervatham

    Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr

    Jan 1, 2006

  • SME-ICGCM
    Dynamic Failure in Coal Seams: Implications of Coal Composition for Bump Susceptibility

    By Arthur Miller, Andrew Weakley, Heather E. Lawson

    "IntroductionDynamic failure events in an underground coal mine, or “bumps,” are defined as “the sudden, violent bursts of coal from a pillar or pillars or a block of coal, resulting in a section, the

    Jan 1, 2015

  • NIOSH
    OFR-61-77 Preliminary Design Study Of Braking System For 10-Ton Coal Mine Rail Haulage Cars

    By Lee M. Manna

    Approximately 10,000, 10-Ton, 4 wheel, 2 truck, coal mine cars are in general service in U. S. Mines. None are equipped with an automatic braking system. Very few are equipped with hand or parking bra

    Jan 1, 1976

  • SME
    A New Approach To Determine The In-Situ Strength Of Coal In Mine Pillars

    By Y. J. Zhang

    This paper presents the results of a recent study on the development of an in-situ testing method for determining the coal strength in mine pillars. The strength testing is performed in the horizontal

    Jan 1, 1995