Search Documents

  • NIOSH
    IC 9006 Safety Aspects Of Pneumatic Transport

    By E. T. Bowers

    Pneumatic conveying of coal underground is not widely used in the United States, although it is becoming increasingly popular in Great Britain, the Federal Republic of Germany, and South Africa. The q

    Jan 1, 1985

  • CIM
    Evolution in Exploration Geology

    By P. A. Peach, W. H. Gross

    The modern economic geologist in Canada is well equipped to apply geological, geochemical or geophysical techniques in the exploration for ore. Recently, great advances have been made in geophysics an

    Jan 1, 1967

  • SAIMM
    Improving The Trough Opening Process At Premier Mine Utilizing Electronic Delay Detonators

    By H. Möhle

    Premier Mine is a large underground diamond mine, situated at Cullinan in the Gauteng Province of South Africa. The mine hoists over 3 millions tons of diamond bearing kimberlite per year, from a mode

    Jan 1, 2000

  • CIM
    Time Domain Reflectometry Measurements of Oil Sands Tailings Water Content: A Study of Influencing Parameters

    By A. R. Sorta, D. C. Sego

    ABSTRACT Temperature, solute, texture, and thixotropic effects on time domain reflectometry (TDR) measurements of water content in oil sands tailings are investigated. Results indicate that TDR water

    Jan 1, 2013

  • NIOSH
    Bulletin 106 The Technology of Marble Quarrying

    By Oliver Bowles

    In its geologic sense the term marble is applied to rocks consisting of crystallized grains of calcite or dolomite or a mixture of the two. Although limestone has the same chemical composition as marb

    Jan 1, 1916

  • SME
    Experimental and Numerical Simulation Studies on the Atomization Characteristics of the Internal Mixing Nozzle and Its Field Application - Mining, Metallurgy & Exploration (2024)

    By Xin Wang, He Shao, Wenpu Li, Yiyi Zheng, Xi Chen, Yurong Gao

    This study utilized experimental and numerical simulation methods to investigate and analyze the atomization characteristics of three internal air–water mixed atomizers under different operating condi

    Mar 9, 2024

  • AIME
    The Fritz Engineering And The Coxe Mining Laboratories Of Lehigh University.

    By Joseph Daniels

    (San Francisco Meeting, October, 1911.) I. THE FRITZ ENGINEERING LABORATORY. TEE Fritz Engineering Laboratory was built under the direction of John Fritz, and presented by him to the University. A v

    Feb 1, 1912

  • SME-ICGCM
    Development and Implementation of the “Spin to Stall” Resin Bolting System at Anglo Americans Australian Underground Coal Operations

    By Ismet Canbulat, John Naylor, Jason Emery, Peter Craig, Andy Sykes

    "Longwall mining is by far the most common method of underground coal extraction in Australia. The industry trends and expectations are placing increasing emphasis on the reliability and productivity

    Jan 1, 2015

  • CIM
    Lalor Mine: Impacts and Implications of a 2,500 HP Main Exhaust Fan Failure

    By Tyler J. Irving

    "In June, 2018 Lalor Mine experienced a catastrophic blade failure of its No. 2 main exhaust fan. Over the following weeks several key changes were made to the auxiliary ventilation system to allow fo

    Jan 1, 2019

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • SME
    Automation To Control Silica Dust During Pallet Loading Process

    By A. B. Cecala

    Two recent Bureau studies evaluated workers' dust exposures in automated pallet loading processes. The first study involved a Bureau designed dust control system using a push-pull ventilation tec

    Jan 1, 1990

  • AUSIMM
    The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold Mines

    By D Hillier, A Giblett, K Parker, V Ramsell

    Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo

    Oct 29, 2012

  • CIM
    Sohio?s L-Bar Uranium Mill

    By M. H. Pettibone

    Sohio Petroleum Company's new L-Bar uranium mill near Grants, New Mexico. refines 2722 kilograms of yellowcake daily from 1360 metric tons of ore produced at Sohio 's J.J. No. 1 mine and oth

    Jan 1, 1978

  • IMMS
    Deepwater Seafloor Resource Production ? Development of the World?s Next Offshore Frontier

    By Glen Smith

    Nautilus Minerals, the world?s leader in exploration and development of deep ocean seafloor resources, is today focused on the recovery of high-grade copper and gold in seafloor massive-sulphide miner

    Jan 1, 2010

  • SAIMM
    Evaluating destress blasting for rock fracture and rockburst prediction in deep level hardrock mining

    By C. Yi, M. Onifade, B. Genc, S. Dineva, T. Zvarivadza, M. Khandelwal

    Deep level hardrock mining faces increasing challenges from elevated in situ stresses and associated rockbursts. This study aims to develop a systematic framework for evaluating destress blasting effe

    Jun 27, 2025

  • SME
    Environmental Problems Of Oil Shale Development

    By John W. Rold

    These encompass all adverse effects of oil shale mining, processing, and ancillary developments on the environment. Specific problems concern: land, vegetation, wildlife, water, air, population growth

    Jan 1, 1972

  • SME
    The Regeneration Project

    By S. B. Hildebrand

    One of the highest costs associated with insitu leaching of copper is electric power. The ReGeneration Project addressed this cost issue with a research and development project for BHP Copper. The pro

    Jan 1, 1998

  • AUSIMM
    An Advanced Modelling Technique for Scale-Up of Batch Flotation Results to Plant Metallurgical Performance

    By O N. Savassi

    A rigorous methodology for prediction of flotation plant performance is presented, which is based on a standardised batch flotation test called the MFT. The work is part of the FLEET program, develope

    Jan 1, 2005

  • AUSIMM
    Dynamic grade control modelling processes at the Waihi Underground Gold Mine

    By A Whaanga, W Vigor-Brown

    IGO Ltd’s (IGO’s) Nova-Bollinger Deposit (Nova-Bollinger) is a magmatic nickel-copper-cobalt (NiCu-Co) sulfide deposit found 160 km east-north-east of the town of Norseman in Western Australia (WA). T

    Mar 22, 2022

  • NIOSH
    RI 3901 Gasification of Lignite & Subbituminous Coal for 1944

    By E. C. Yeager, E. O. Wagner, A. W. Koth, V. F. Parry, J. B. Goodman, D. G. Gernes, W. L. Patty

    "In July 1943, the Bureau of Nines received an appropriation to investigate the beneficiation of Minnesota iron ores through the use of lignite. The broad objective was to find a way to link the large

    Jun 1, 1946