Search Documents

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • ISEE
    Analysis of Dynamic Stability of Rock Slope Under Loading of Blast Induced Seismic

    By Wenbo Lu

    A combined method is present in this paper in analysis the dynamic stability of rock slope under the loading of blast induced seismic, in which, by combining the dynamic load calculating method of qua

    Jan 1, 1999

  • SME
    NATM Through Clean Sands—The Michigan Street Experience

    By Mohamed A. Younis, Paul J. Headland, Paul H. Madsen, Vojtech Gall

    INTRODUCTION A 100 ft long, 20 ft high and 18 ft wide NATM tunnel was excavated through grouted clean sands beneath a busy city street, including a variety of existing utility lines. The new tunnel

    Jan 1, 2007

  • DFI
    A Simple Solution For Slope Stabilization Using Micropiles

    By Dan Brown

    A method is outlined for computing the contribution of a micropile group to global stability of a sliding mass. The forces in the micropile are computed in a way which accounts for the effect of soil

    Jan 1, 2007

  • SAIMM
    PB Battery Recycling. New Frontiers In Paste Desulphurisation And Lead Production

    By M. Olper

    The change in regulations and the strong attention to the environment have suggested some changes in the traditional processes for the recycling of lead acid batteries. Engitec Technologies, marketing

    Jan 1, 2008

  • SME
    Automation Controls Can Lower Plant Costs

    By Steve Kral

    Not too many years ago, mining was in one of its cyclic down-sides. This forced mining companies into some innovative thinking to bring down the costs of production. And they have. Mining equipment

    Jan 1, 2006

  • SME
    Completion of H-3 Highway Tunnel

    By Jan L. Reichelderfer, Thomas L. Richardson

    Completion of the H-3 Highway Tunnel Project was a critical element in opening this award winning project. The exploratory tunnel was completed as a maintenance tunnel and included difficult shafts ex

    Jan 1, 2001

  • AIME
    Papers - The "Plasticity" of Iron at low Temperatures (With Discussion)

    By K. Heindlhofer

    Estimates of the "plasticity" of a metal are commonly deduced from three types of test—tensile, torsion and impact. The several results have been more or less at variance, though this disparity has at

    Jan 1, 1935

  • NIOSH
    Measuring diesel particulate matter in underground mines using submicron elemental carbon as a surrogate

    By J. D. Noll

    Elemental carbon (EC) is used as a surrogate for regulating the exposure to diesel particulate matter (DPM) of underground metal/non-metal miners. EC was chosen as a surrogate because EC is selective

    Jan 1, 2002

  • AUSIMM
    Settling Pond Design and Performance - The Malvern Hills Coal Mine Experience

    By J F. Seale

    The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in

    Jan 1, 2004

  • IIMP
    Evolución del sistema de control y supervisión operación L-SX-EW Toquepala

    By Jorge Oviedo

    La planta de lixiviación, extracción por solventes y electrodeposición (L-SX-EW) de Southern Perú es una operación hidrometalúrgica dedicada a la lixiviación ácido – bacteriana de los botaderos de min

    Aug 25, 2002

  • CIM
    Separation of Metals in Aqueous Solutions by Ion Exchange

    By A. Himsley

    "There is an ever-increasing demand these days for efficient methods of removing metals from solutions especially for selectively recovering a particular metal from a mixture of metals in solution.Up

    Jan 1, 1975

  • SME
    Haile Gold Mine Metallrgy And Flowsheet Review

    By J. Wickens

    Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through sev

    Feb 27, 2013

  • SAIMM
    Seismology in the design of mine layouts

    By S. M. Spottiswoode, J. A. L. Napier, M. Kataka

    The move away from the use of strike stabilising pillars at depth and the adoption of the more flexible system of mining towards final dip remnant pillars brings new opportunities for optimising mine

    Jan 1, 2003

  • SME
    TARP — The Des Plaines Tunnel System (North Leg) A Case History

    By Robert Rautenberg, Paul McDermott

    This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7

    Jan 1, 1997

  • AUSIMM
    The Changing Role of Representative Bodies and Institutes

    Change is inevitable but learning from change is an option. Willingness to learn is one of the first lessons that a leader must learn. Get comfortable and get left behind. I propose to outline the mai

    Jan 1, 2000

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • AUSIMM
    The Research on Application of New Technologies in High Gradient Magnetic Separator with Horizontal Magnetic Line

    The Research on Application of New Technologies in High Gradient Magnetic Separator with Horizontal Magnetic Line

    Sep 13, 2010

  • AIME
    Boston Paper - Mining and Storing Ice

    By William P. Blake

    We are so familiar with water in its liquid and its solid form, that we seldom think of it as a mineral, and still less as a mineral product of any considerable industrial importance, though in the fo

    Jan 1, 1883

  • NIOSH
    An Analysis Of Rock Failure Around A Deep Longwall Using Microseismics

    By Keith A. Heasley, John L. Ellenberger, Paul W. Jeran

    In this paper, a state-of-the-art, three-dimensional, full waveform, microseismic system was used to analyze the rock failure around a deep (> 750 m (2500 ft) of cover) bump-prone longwall panel. The