Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rod ? Lamella Thickener for Mud Removal from Living WatersBy J. Faitli
The Lake Balaton is the biggest and for many reasons the most important lake in Hungary. To preserve its healthy nature it is necessary to remove the accumulated mud time to time, similarly to the man
Jan 1, 2014
-
The Philosophy of an International Mining CompanyBy M. I. Freeman
This paper point put if the companies will considerate large- scale mining in South Américan in the future. In this sense, the philosophy of an international mining company means that the company and
Nov 20, 1969
-
Copper And Silver Recovery From A Complex Sulfide Concentrate By Ferrous Chloride-Oxygen LeachingBy B. J. Scheiner
A ferrous chloride-oxygen leaching system was investigated by the Federal Bureau of Mines as a means of re-covering copper and silver from a sulfide concentrate that had been pretreated to remove a ma
Jan 1, 1978
-
Bench Scale X-Ray Fluorescence Sorting of Low Grade Copper OresBy Tugba Cebeci, Bahjat Khoshaba, Bern Klein, Libin Tong, Andrew Bamber
"Sensor-based sorting technologies have potential to pre-concentrate low grade subeconomic ores through discarding the barren waste particles. However, the inability of sensors to accurately discrimin
Jan 1, 2016
-
Effect of the grinding circumstances on the mechanical activation of fly ash in stirred media millBy Gábor Mucsi, Barnabás Csoke, Viktor Mádai, Zoltán Molnár, Viktor Török, Ádám Rácz
The application of the stirred media mill in dry mode came to the front only in recent years, but at the same time several questions arise, such as aggregation, agglomeration, sticking on the liners a
Jan 1, 2014
-
Stabilization of Materials – Upgrading Of Soils and Sediments to Use in Geo-ConstructionsBy Helene Kennedy, Josef Macsik, Yvonne Rogbeck, Gregory Makusa, Göran Holm
"Constructions activities in cities often imply large volumes of surplus material which could be treated by stabilization for re-use in new geotechnical constructions. Modification of dredged sediment
Jan 1, 2015
-
Optimization Of Rougher Wet High Intensity Magnetic Separator To Recover Ilmenite From Placer Heavy MineralsBy T. Laxmi
This paper details the optimization of rougher Wet High Intensity Magnetic Separator (WHIMS) using response surface methodology. The optimization is in parametric form and takes account of the major o
Sep 1, 2012
-
Cellulose Acetate Membranes for Co2 Separation from WGS Reaction ProductsBy Upali Siriwardane, Tushar V. Kudale, Naidu V. Seetala
"Cellulose acetate (CA) membranes with 25% triethyl citrate (TEC) as plasticizer were prepared with varying thickness for CO2 gas separation from water-gas-shift (WGS) reaction products. The AFM analy
Jan 1, 2014
-
Is openpit production scheduling "easier" than its underground counterpart?By A. Newman, A. Brickey
Although some of the prevalence of openpit production scheduling software can be explained by the predominance of openpit mining throughout the world, other factors have led to a lag in corresponding
Jan 1, 2014
-
Simulation of the Flotation of Bear Lodge Ore and a Preliminary Economic AnalysisBy H. Cui
Rapid technological development has caused an increase in the demand for rare earths. Ancylite, a strontium rare earth carbonate, is a potentially significant source of rare earths. In this research p
-
Is openpit production scheduling "easier" than its underground counterpart? (510581b7-6ca0-4114-a855-daf260fcdb74)By A. Newman, A. Brickey
A pesar de que parte del predominio de software de programación de producción a cielo abierto se puede explicar por la preponderancia de la minería a cielo abierto en todo el mundo, hay otros factores
Jan 1, 2014
-
Hydrogeochemical Study of the Groundwater Around the Abandoned Kettara Mine Site, MoroccoBy M. Lghoul
Acid mine drainage (AMD) remains one of the major environmental problems for the mining industry particularly for many abandoned mine sites. The production of AMD as is commonly known can significantl
Aug 1, 2013
-
RI 5845 Compressibility Factors For Helium And Helium-Nitrogen Mixtures ? Summary And IntroductionBy J. E. Miller
This paper reports experimental determinations by the Bureau of Mines of compressibility factors to 4,000 pounds per square inch absolute (p.s.i.a.) for helium at temperatures from -10° to 130° F. and
Jan 1, 1961
-
The Implementation Processing Plant Modifications at Cormidom, Cerro De Maimon, PerilyaBy Jonathan Ruiz Lizardo, Met-Chem Canada Inc., Flavio Ccuno, Constante Umipig, Ewald Pengel, José Ruiz
"Cerro de Maimón is located in the Dominican Republic on the island of Hispaniola approximately 75 kilometers northwest of the capital city, Santo Domingo. The processing facility consisted of two sep
Jan 1, 2016
-
Estimating The Effects Of Non-Darcian Flow On Inflow To A Pit And Slope StabilityBy L. C. Atkinson
A three-dimensional finite element Ground-water flow code has been developed that incorporates saturated/unsaturated, two-regime flow (i.e., both Darcian and non-Darcian) and solves for the seepage fa
Jan 1, 1992
-
Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite ConcentratorBy C Jenkins, M Mativenga, C Stanton, J Gerber
In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra
Jul 13, 2015
-
Birth, Death and Rebirth of the Duchess Phosphate Rock DepositsSince the initial discovery of phosphate rock resources in North West Queensland in 1966, significant changes in ownership and development direction have occurred. Initially development of the resourc
Jan 1, 1998
-
Slag Structures and Properties by Spectroscopic Analysis: Effect of Water Vapor Relevant to a Novel Flash Ironmaking TechnologyBy M. Y. Mohassab-Ahmed
In an effort to develop a novel flash ironmaking process, the chemistry of selected slags was investigated. In different ironmaking processes, the molten bath (iron-slag bath) is expected to be in con
Jan 1, 2014
-
Conditions for Removal of Arsenic Fromnon - Ferrous Metal Wastewater in the Form of PrecipitatesBy L. Bratek, K. Jaworek, M. Czaplicka
Methods for arsenic compound removal from aqueous solutions include processes such as: coagulation, adsorption, membrane techniques, electrochemical and biotechnology techniques. Advanced oxidation us
Jan 1, 2014
-
Peak Particle Velocity versus Gravitational Acceleration as a Stability Criterion for Earth Retaining Walls Subjected to Production Blast VibrationsBy Dale Preece, Joergen Pilz, Zavis Zavodni
An overland conveyor was constructed at a surface coal mine to reduce the truck haul distance and make the operation more efficient. An important element in this system is a truck dump facility to tra
Jan 1, 2010