Search Documents

  • TMS
    Electrochemical Behavior and Corrosion Properties of Ti-6Al-4V Alloy Made by Selective Laser Melting for Immersion in Artificial Seawater at Different Temperature

    By Yifei Zhang, Jianzhong Li, Wenhao Zhang

    Eletrochemical behavior and corrosion properties of a Ti–6Al–4V alloy fabricated by selective laser melting in artificial seawater at temperature ranges from 20 to 40 °C were investigated using electr

    Mar 1, 2018

  • SME
    ASTM Standardization Of The Acid Neutralization Potential Acidity Titration In The Low Range (ANPAL) For Investigation Of ?Uncertain? Results

    By C. H. Bucknam

    Classical acid-base accounting using modified Sobek titration methods has resulted in interpretation of results for materials with neutralization potential (NP) less than 20 tons of CaCO3/1000 tons of

    Feb 27, 2013

  • IMPC
    Sedimentation and Consolidation in Poly-disperse Suspensions

    By A. I. A. Salama

    In this paper, the problem of sedimentation and consolidation of poly-disperse suspensions is considered. The solid particles are assumed to be of different densities. If the sediment solids stresses

    Jan 1, 2014

  • SME
    Disc cutting tests on dry and saturated sandstone: muck as a performance estimator - SME Transactions 2012

    By L. S. Gertsch, M. Z. Abu Bakar

    The research presented here is part of a project to quantify the differences in the mechanical excavatability of rocks in dry and water-saturated conditions. A series of full-scale laboratory linear r

    Jan 1, 2012

  • ISEE
    Journal: 100 Years / The Engineering And Mining Journal New York August 10, 1907 Ground Breaking In The Joplin District Q786 Holes Are Drilled With Air Drills And Squibbed Before Charging. About 1 Pound Of Dynamite Is Required Per Ton Of Rock Broken

    By Doss Brittain

    The term ground breaking is taken to include the process of so loosening the ground as to enable it to be readily loaded into buckets or cars and hoisted from the shaft or drift. In the Joplin distric

    Jan 1, 2008

  • AUSIMM
    Applications of Advanced Remote Sensing Systems during a Mine Life

    By B P. Banerjee, S Raval

    In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr

    Jun 28, 2016

  • CIM
    Regeneration of Ammonia and Hydrochloric Acid in the Outotec Nickel Chloride Leaching Process

    By P. Kobylin, K. Haavanlammi, K. Valkama

    "Base metals and precious metals can be recovered from a nickel matte or nickel concentrate using the Outotec nickel chloride leaching process. The raw material is leached with hydrochloric acid and t

    Jan 1, 2017

  • CIM
    World Expenditures in Mining Geophysics During 1967

    By Peter Hood

    Data on world-wide geophysical activity in mining exploration programs are collected annually by the Society of Exploration Geophysicists' Geo-physical Activity Committee as part of a continuing servi

    Jan 1, 1968

  • TMS
    Dynamics of Solidification and Microstructure Evolution in Undercooled Co-Cu-Alloys with Metastable Miscibility Gap

    By M Kolbe

    Co-Cu exhibits a metastable miscibility gap in the region of the undercooled melt. Specimens have been undercooled and solidified containerlessly into the metastable miscibility gap in an electromagne

    Jan 1, 2002

  • CIM
    Agglomeration in Leaching: The Use of Electrical Conductivity Measurements for Agglomeration Control and Fines/Clays Monitoring

    By G. Velarde

    Agglomeration has as main objective to form a uniform and highly permeable heap for leaching. An inaccurate dosage of moisture during agglomeration leads directly to poor agglomerate quality and segre

    Jan 1, 2004

  • AUSIMM
    Open Pit Strategic Mine Planning with Automatic Phase Generation

    By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague

    A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope

    Nov 24, 2014

  • CIM
    Falconbridge Ltd. - 60 years in a century

    By Gerald A. Crawford

    "1880s - Unmasking the Sudbury Basin Falconbridge Ltd. turned 60 in 1988 but its roots go back more than a century to the discovery and development of the mineral resources of the Sudbury Basin. Nicke

    Jan 1, 1999

  • TMS
    Utilization Of Refractory Brick Wastes In Concrete Production As Aggregates

    By Taner Kavas

    The refractory bricks of a rotary cement furnace containing of alumina and magnesium chromite were studied in order to determine whether they could be used in the concrete production as aggregates. Th

    Jan 1, 2006

  • SME
    Massive Tires Keep The Industry Rolling

    One of the biggest challenges for the mining industry is, quite literally, how to the keep the equipment rolling. There is a limited amount of companies that manufacture the 4.2-m- (14-ft-) tall, 5,

    Jan 1, 2008

  • SME
    An Integrated Mine Plan: Connecting Long-, Medium- And Short-Term Planning`

    By Vivas

    Goldcorp is one of the largest gold producers in the world with projects in South, Central and North America. Goldcorp?s flagship operation is Peñasquito, a world class, polymetallic deposit that star

  • NIOSH
    RI 4953 Investigation Of Lead-Zinc Deposits At The Harrington-Hickory Mine Beaver County, Utah ? Introduction And Summary

    By James W. Townsend

    [The Harrington-Hickory mine in the Star raining district, Beaver County, Utah, has produced approximately 20,000 tons of lead-zinc-silver ores since 1910. Production previous to 1910 is not known. Th

    Jan 1, 1953

  • CIM
    Bison and the oil sands industry

    By R. W. Pauls

    "Many tens of thousands of hectares of forested land will be disturbed and reclaimed in the surface mineable Athabasca oil sands area during the next few decades. The surface area disturbed by Syncrud

    Jan 1, 1999

  • CIM
    Evaluation of the Tower Mill as Regrind Machine

    By J. M. Menacho, J. M. Reyes

    "Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te

    Jan 1, 1989

  • SME
    Fifty Years Of Safety Progression Resulting From Ventilation

    By J. W. Stevenson

    At this 5th U.S. Mine Ventilation Symposium I would like to focus your attention on safety and the contribution of the ventilation engineer over the past 50 years. This conference affords us the oppor

    Jan 1, 1991

  • TMS
    Thermodynamic Study of the Ni- W-O System in the Temperature Range 1073-1273K

    By R. E. Aune

    In the present work, a critical assessment of the thermodynamic information available for the ternary system Ni-W-0 has been carried out; This was complemented by experimental measurements of the stan

    Jan 1, 1994