Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
EPA Standards For SmeltersBy Fred Porter
Pollution problems from smelters may be unique in industry since the pollutants cover the wide range of SOx, particulates, carcinogens (arsenic), plus a number of heavy metals, the health implications
Jan 1, 1976
-
Validação Experimental De Soluções De Flexibilidade Elástica Aplicáveis A Corpos De Prova C(T) E Se(B)By Gustavo Henrique Bolognesi Donato
O projeto e a operação de estruturas que podem vir a conter trincas demandam estudos de integridade estrutural suportados por propriedades mecânicas à fadiga e à fratura advindas de ensaios experiment
Aug 17, 2017
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
Enriquecimento com Oxigênio no Comburente dos Fornos Regeneradores de Altos fornosBy Enderson Silva Gomes
A PRAXAIR é uma das três maiores empresas de gases industriais do mundo, com atuação em mais de 40 países e fortemente atuante na indústria siderúrgica. A PRAXAIR possui experiência para fornecer prod
Oct 30, 2017
-
Production Engineering - Radial Filtration of Drilling Muds (T. P. 1112, with discussion)By Milton Williams
It is generally recognized that fluid is lost from rotary drilling muds to permeable strata during normal drilling operations;1,2-3 but that this fluid is the filtrate from the mud, rather than the mu
Jan 1, 1940
-
Production Engineering - Radial Filtration of Drilling Muds (T. P. 1112, with discussion)By Milton Williams
It is generally recognized that fluid is lost from rotary drilling muds to permeable strata during normal drilling operations;1,2-3 but that this fluid is the filtrate from the mud, rather than the mu
Jan 1, 1940
-
Comparison of Acid Production From Pyrite and JarositeBy M Berndt
Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt
Jan 1, 2003
-
Improving The Caraíba Metais' Slag TreatmentBy André L. B. Bittencourt
The copper content in the waste slag represents the greatest loss in the process of Caraíba Metais' Smelter. By identifying the variables responsible for copper stabilization in the slag, a minim
Jan 1, 1994
-
Risk Assessment of Consumables Supplies Management in MinesBy M J. Pejovic, S BoÜevski, I Miljanovic, M Hudej, A Milutinovic, A Petrovski
The paper deals with the problem of managing the supplies of consumables (energy resources, lubricants, explosives, explosive supplies, tires, spare parts, etc) in mines. After the introductory remark
Sep 26, 2011
-
Underwater Sound Attenuation In Construction Projects: Applying Science To Pile Driving PermitsBy Alan Christopherson
Nearshore construction projects often require installation of steel piles and specific methodologies of installing piles may adversely affect nearby species of concern. Water is an uncompressible med
Jan 1, 2013
-
Institute of Metals Division - Observations on the Powdering of Yttrium Hydride (TN)By John D. Roach
DURING an investigation of the yttrium-hydrogen system aimed at producing solid yttrium hydride specimens containing various amounts of hydrogen, it was observed that yttrium containing approximately
Jan 1, 1962
-
Mine Risk Management for the Unexpected - Apache ExplosionAustralia had been enjoying a market boom led by the mining sector and West Australian mines were leading the way to satisfy the massive demand for our natural resources, especially from China. Howeve
Jan 1, 2009
-
Papers - Non-ferrous Metallurgy - Lead Alloys for Anodes in Electrolytic Production of Zinc of High Purity (With Discussion)By A. G. Taylor, H. P. Ehrlinger, U. C. Tainton
FOR the last 15 years lead has been the standard material for anodes in electrolytic zinc production and it has been generally accepted that this lead should be as free as possible from impurities. La
Jan 1, 1929
-
Evaluation Of The Effect Of Vertical Load On The Impedance Function In Seismic Analysis Of Soil-Pile-Structure InteractionBy Ahmad Mahboubi
The damage caused by catastrophic earthquakes has always been an incentive towards more sophisticated building codes and requirements. In parallel to computer technology development, the engineers? at
Jan 1, 2010
-
A risk-management approach to improve coal-pillar extraction - SME Transactions 2012By C. J. Bise, P. Bucks
Central Appalachian coal reserves are a valuable natural resource in high demand, both domestically and internationally, justifying efforts to increase percentage recovery through pillaring. Unfortuna
Jan 1, 2012
-
Old Stopes and New Simulations – A Structural Modelling and Resource Estimation Case Study of the Edna May Gold Mine, Western AustraliaBy P Hodkiewicz
Recent structural interpretations based on historic stope shapes were used to develop a rapid and innovative method to domain and simulate structurally complex, high-grade gold veins at depth in the E
Aug 22, 2011
-
Tunnel Cost ModelBy Charles H. Minott, Michael J. Markow, Robert D. Wyatt, Fred Moavenzadeh
The substantial investment in tunnels anticipated in the next twenty years has focused new attention on the economics of tunnel construction itself and on some costly problems associated with undergro
Jan 1, 1974
-
Ground rippability classification by decision trees - SME Transactions 2015By E. Siami-Irdemoosa, S. R. Dindarloo
Ease of excavation or rippability, also called diggability or excavatibility, is a critical decision-making parameter in the selection of both the overburden removal method and the required equipment
Jan 1, 2015
-
Presidential Address (d5ebea7f-aa5b-44e8-8852-0e1790fcdc7e)Mr. Murray said: Having recently returned from a visit to America, it may be of interest to members to hear something from me of the mining fields and metallurgical works which I had the opportunity o
Jan 1, 1927
-
A Phased Development Schedule For A Platinum Concentrator Utilizing A Dynamic Stockpile Model ? SynopsisBy J. Labuschagne
There are a number of factors that contribute to the profitability of a mine and its associated concentrator. Chief among these is the time taken from the first hoist of material from underground to t
Jan 1, 2013